Summary Of Drilled Shaft Installation Plan
(pdf, 21 kb.)
| a. Name of Drilled Shaft Superintendent |
|
FHWA Pub. IF-99-025 xxx.12 (a) |
| Experience |
| |
| b. Equipment |
Manufacturer |
Model |
Size |
| Drill Rig |
|
|
|
| Crane |
|
|
|
| Augers |
|
|
|
| Casing |
|
|
|
| Bailing Bucket |
|
|
|
| Final Cleaning Equipment |
|
|
|
| Desanding |
|
|
|
| Slurry Pump |
|
|
|
| Core Sampling Equipment |
|
|
|
| Concrete Pump |
|
|
|
| c. Sequence of Construction: |
| How Many Crew |
|
| How many shafts |
|
| How many bents or shaft groups |
|
| d. Details of Shaft Excavation Methods: |
| |
| e. Details of Slurry: |
| Type |
|
| Method to mix/circulate |
|
| Desand |
|
| Testing |
|
| Name of lab |
|
| f. Details of method to clean shafts after initial excavation: |
| |
| g. Details of shaft reinforcement: |
| |
| h. Details of concrete placement procedures: |
| Concrete or pump tremie |
|
| Initial placement |
|
| Raising during placement |
|
| Overfilling shaft |
|
| Provisions to ensure final shaft cutoff elevations: |
|
| |
| i. Details of casing removal: |
| |
| 1. Required submittals: |
| Shaft drawings |
|
| Concrete mix design |
|
| 2. Details of Load Test: |
| Equipment |
|
| Procedure |
|
| Calibration |
|
| 3. Prevention of displacement of casing/shaft during placement |
| Compaction of fill |
|
| Method |
|
| Equipment |
|
| 4. Environmental control procedures to prevent loss of slurry or concrete into waterways: |
| |
| 5. Other information: |
| |
TOC
|