Utilization of Recycled Materials in Illinois Highway Construction
APPENDIX
| 2001 Recycled Materials Quantities |
| Material | Metric Unit | Code | Quantity | Eng. Unit | Code | Quantity |
| ACBFS | MTon | 014CMM18 | 3,416 | Tons | 014CM18 | 168 |
| MTon | 033CMM13 | 61,652 | Tons | 043CA06 | 617 |
| MTon | 033FAM21 | 4,329 | -- | -- | |
| MTon | 043CAM06 | 626 | -- | -- | |
| MTon | 053CAMO6 | 809 | -- | -- | |
| Sub-Total (Tons) | 78,127 | | | 785 |
| Total (Tons) | 78,912 | | | |
| Cost@$15.25/Ton | $1,203,411 | | | |
| By- Product Lime | MTon | 003FAM01 | 6,477 | Tons | 003FA01 | 9,807 |
| MTon | 003FAM02 | 380 | Tons | 003FA02 | 249 |
| MTon | 004MFM02 | 18,712 | Tons | 004MF02 | 1,321 |
| MTon | 004MFM03 | 5,441 | Tons | 004MF03 | 1,183 |
| Sub-Total (Tons) | 34,204 | | | 12,560 |
| Total (Tons) | 46,764 | | | |
| Cost@$15/Ton | $701,457 | | | |
| Fly Ash | MTon | 37801M | 41,080 | CYD | 21605 | 111,896 |
| MTon | 37802M | 5,136 | CYD | 21622 | 13,220 |
| CM | 21605M | 422,981 | CYD | 21803 | 1,327 |
| CM | 21614M | 258 | -- | -- | |
| CM | 21803 | 2,432 | LBS/CYD | Avg. Unit Wt. In PCC | 130 |
| CM | 21622M | 1,644 |
| Sub-Total (MTons)21 | 79,186 | | | 7,456 |
| Total (MTons) | 86,642 | | | |
| Total (Tons) | 95,566 | | | |
| Cost@$27.50/Ton | $2,628,070 | | | |
| Glass Beads | LBS | 60401 | 9,768,000 | LBS | 70601 | 3,880,800 |
| LBS | 60407 | 968,000 | LBS | 70602 |
| LBS | 70609 | 1,380 | -- | -- | |
| Sub-Total (LB.S) | 10,737,380 | | | 3,880,800 |
| Total (LB.S) | 14,618,180 | | | |
| Total (Tons) | 7,309 | | | |
| Cost@$0.17/LB | $2,485,091 | | | |
| GGBFS2 | MTons | 37821M | 479 | -- | -- | |
| Sub-Total (MTons) | 479 | | | |
| Total (Tons) | 528 | | | |
| Cost@$57/Ton | $30,090 | | | |
| Micro- silica | KG | 37852M | 111 | CYD | 21609 | 1,620 |
| CM | 21609M | 2,436 | LBS/CYD | Avg. Unit Wt. In PCC | 33 |
| CM | 21622M | 1,644 |
| Sub-Total (LB.S) | 176,443 | | | 53,460 |
| Total (Tons) | 115 | | | |
| Cost@$440/Ton | $50,579 | | | |
| RAP3 | MTon | 017CAM06 | 14,430 | Tons | 017CM01 | 24,026 |
| MTon | 017CAM10 | 1,027 | Tons | 017CM11 | 2,107 |
| MTon | 017CMM01 | 47,601 | Tons | 017CM13 | 37,675 |
| MTon | 017CMM10 | 2,059 | -- | -- | |
| MTon | 017CMM11 | 82,773 | -- | -- | |
| MTon | 017CMM12 | 449 | -- | -- | |
| MTon | 017CMM13 | 283,106 | -- | -- | |
| MTon | 017CMM16 | 61,894 | -- | -- | |
| MTon | 017CMM18 | 13,610 | -- | -- | |
| Sub-Total (Tons) | 559,165 | | | 63,808 |
| Total (Tons) | 622,973 | | | |
| Cost@$32/Ton | $19,935,128 | | | |
| 2001 Recycled Materials Quantities |
| Material | Metric Unit | Code | Quantity | Eng. Unit | Code | Quantity |
| RCP4 | MTon | 014CMM18 | 209 | Tons | 019CA06 | 14,245 |
| MTon | 019CAM06 | 14,096 | Tons | 019CM18 | 47,309 |
| MTon | 019CAM07 | 18 | Tons | 059CA06 | 22,529 |
| MTon | 019CMM18 | 162,418 | -- | -- | |
| MTon | 059CAM06 | 37,715 | -- | -- | |
| MTon | 059CAM10 | 394 | -- | -- | |
| MTon | 059CMM06 | 229 | -- | -- | |
| Sub-Total (Tons)14 | 237,233 | | | 84,083 |
| Total (Tons)15 | 321,316 | | | | |
| Cost@$5/Ton16 | $1,606,578 | | | |
| Steel Slag | MTon | 039CMM11 | 5,965 | Tons | 039CM11 | 6,227 |
| MTon | 039CMM13 | 115,625 | Tons | 039CM13 | 25,113 |
| MTon | 039CMM16 | 10,364 | Tons | 039FA20 | 8,412 |
| MTon | 039FAM20 | 6,552 | Tons | 039FM20 | 380 |
| MTon | 039FMM20 | 1,659 | -- | -- | |
| Sub-Total (Tons)17 | 154,601 | | | 40,131 |
| Total (Tons)18 | 194,733 | | | |
| Cost@$16.2519 | $3,164,409 | | | |
R E I N F O R C E M E N T
S T E E L | Welded Wire Fabric | SM | 62803M01 | 531 | SYD | 6280301 | 5,632 |
| SM | 62803M02 | 22,023 | SYD | 6280302 | 31,934 |
| -- | -- | | SYD | 6280304 | 179 |
| Sub-Total (SYD)20 | 26,975 | | | 37,746 |
| Total (SF)21 | 582,484 | | | |
| Cost@$0.35/SF22 | $203,869 | | | |
| Rebar | KG | 62901M40 | 8,910 | LBS | 6290140 | 41,415 |
| KG | 62901M300 | 812 | LBS | 6290160 | 4,965,656 |
| KG | 62901M400 | 35,201 | LBS | 6290940 | 133,209 |
| KG | 62904M500 | 204 | LBS | 6290960 | 13,055,840 |
| KG | 62901M60 | 897,510 | -- | -- | |
| KG | 62909M40 | 3,471 | -- | -- | |
| KG | 62909M400 | 379,214 | -- | -- | |
| KG | 62909M60 | 4,163,026 | -- | -- | |
| Sub-Total (LBS)23 | 12,101,808 | | | 18,196,120 |
| Total (Tons)24 | 15,149 | | | |
| Cost@$690/Ton25 | $10,452,785 | | | |
| WBBS5 |
| Total (Tons)26 | 0.00 | | | |
| $0.00 | | | |
- ACBFS: Air-Cooled Blast Furnace Slag
- GGBFS: Ground Granulated Blast Furnace Slag
- RAP: Recycled Asphalt Pavement
- RCP: Recycled Concrete Pavement
- WBBS: Wet-Bottom Boiler Slag
|
|