Skip to content
Facebook iconYouTube iconTwitter iconFlickr iconLinkedInInstagram
Office of Planning, Environment, & Realty (HEP)
HEP Events Guidance Publications Glossary Awards Contacts

2020 Alternative Fuel Corridor Refresh Update

FHWA has reviewed AFC designations made during Rounds 1-4 to determine if the status of these corridors has changed since their original designation. The FHWA AFC Team, in coordination with State partners and AFC stakeholders, has identified 84 interstate, U.S., and State Road corridors across 26 states that have undergone a change in their status. These primarily include corridors that have shifted from Corridor-Pending to Corridor-Ready, due to new stations being added along these highway segments to close gaps and/or extend corridors. Additionally, in some instances this analysis has identified corridors that have reverted from Corridor-Ready to Corridor-Pending status, due to station closures. The results of this AFC Refresh analysis are documented in the following table.

This table includes the following information:

STATES COVERED CURRENT DESIGNATION UPDATED DESIGNATION (2020 REFRESH)
Alabama I-20: EV Pending: Between the AL/GA border and the AL/MS border (Designated Round 4) I-20: EV Ready: Between the AL/GA border and Oxford
I-20: EV Pending: Between Oxford and the AL/MS border
I-85: EV Pending: Between the AL/GA border and the I-85/I-65 interchange in Montgomery (Designated Round 4) I-85: EV Ready: Between the AL/GA border and Auburn
I-85: EV Pending: Between Auburn and the I-85/I-65 interchange in Montgomery
Arizona I-15: Between AZ/NV border and AZ/UT (Not currently designated for EV) I-15: EV Ready: Between AZ/NV border and AZ/UT border
California I-5: EV Pending: Between Stockton and the junction of I-5 & SR-99 in Lebec (Designated Round 1) I-5: EV Ready: Between the CA/OR border and Coalinga
I-5: EV Ready: Between Buttonwillow and the the CA/Mexico border
I-5: EV Pending: Between Coalinga and Buttonwillow
I-10: EV Pending: Between Indio and the CA/AZ border (Designated Round 1)
I-10: EV Ready: Between Indio and Chiriaco Summit
I-10: EV Pending: Between Chiriaco Summit and the CA/AZ border
I-680: H2 Pending: Entire highway (Designated Round 1)
I-680: H2 Ready: Between San Ramon and the I-680 terminus in San Jose
I-680: H2 Pending: Between the I-680/I-80 interchange in Cordelia and San Ramon
US 101: EV Ready: Between the I-10/I-5 interchange in Los Angeles and Ukiah (Designated Round 1)
US 101: EV Ready: Between Garberville and Trinidad (Designated Round 1)
US 101: EV Pending: Between Ukiah and Garberville (Designated Round 1)
US 101: EV Pending: Trinidad and the CA/OR border (Designated Round 1)
US 101: EV Ready: Between the I-10/I-5 interchange in Los Angeles and Ukiah (NO CHANGE)
US 101: EV Ready: Between Laytonville and Trinidad
US 101: EV Ready: Between Klamath and the CA/OR border
US 101: EV Pending: Between Ukiah and Laytonville
US 101: EV Pending: Between Trinidad and Klamath
SR-14: EV Pending: Between Lancaster and the junction of SR-14 & US 395 in Inyokern (Designated Round 2)
SR-14: EV Ready: Between Lancaster and Mojave
SR-14: EV Pending: Between Mojave and the junction of SR-14 & US 395 in Inyokern
SR-41: EV Pending: Between Fish Camp and Shandon (Designated Round 2)
SR-41: EV Ready: Between Oakhurst and Fresno
SR-41: EV Pending: Between Oakhurst and Fish Camp
SR-41: EV Pending: Between Shandon and Fresno
SR-152: EV Pending: Between Watsonville and Chowchilla (Designated Round 2) SR-152: EV Ready: Between Watsonville and Chowchilla
Connecticut I-84: LPG Ready: Between CT/NY border and CT/MA border (Designated Round 1) I-84: LPG Ready: Between CT/NY border and South Windsor
I-84: LPG Pending: Between South Windsor and CT/MA border
I-395: CNG Pending: Between Waterford and CT/MA border (Designated Round 1) I-395: CNG Pending: Between the I-395/I-95 interchange in East Lyme and Norwich
I-395: CNG Ready: Between Norwich and the CT/MA border
Florida I-95: CNG Ready: Jacksonville and St. Augustine (Designated Round 1)
I-95: CNG Pending: Between FL/GA border and Jacksonville (Designated Round 1)
I-95: CNG Ready: Between FL/GA border and St. Augustine
Georgia I-16: EV Ready: Between Macon and Metter (Designated Round 3)
I-16: EV Pending: Between Metter and Savannah (Designated Round 2)
I-16: EV Ready: Between Macon and Savannah
I-75: EV Pending: Between Warner Robbins and Tifton (Designated Round 1) I-75: EV Ready: Between Warner Robbins and Tifton
I-95: CNG Pending: Between the GA/FL border and the GA/SC border (Designated Round 3) I-95: CNG Ready: Between the GA/FL border and Port Wentworth
I-95: CNG Pending: Between Port Wentworth and the GA/SC border
Idaho I-84: EV Pending: Entire highway (Designated Round 1) I-84: EV Ready: Between Boise and Mountain Home
I-84: EV Pending: Between the OR/ID border and Boise
I-84: EV Pending: Mountain Home and the ID/UT border
I-84: CNG Pending: Entire highway (Designated Round 1)
I-84: CNG Ready: Between Nampa and Boise
I-84: CNG Pending: Between the OR/ID border and Nampa
I-84: CNG Pending: Between Boise and the ID/UT border
I-90: EV Pending: Entire highway (Designated Round 1)
I-90: EV Ready: Between the ID/WA border and Smelterville
I-90: EV Pending: Between Smelterville and the ID/MT border
I-15: LNG Ready: Between ID/UT border and the intersection with I-86 (and to Idaho Falls) (Designated Round 1)
I-15: LNG Pending: Between Idaho Falls and the ID/MT border (Designated Round 1)

I-84: LNG Ready: Between the ID/UT border and the intersection with I-86 (and to Nampa) (Designated Round 1)
I-84: LNG Pending: Between the ID/OR border to Nampa (Designated Round 1)

I-84/I-86/I-15: LNG Ready: From Nampa to Idaho Falls (Designated Round 1)

I-90: LNG Pending: Entire highway (Designated Round 1)
I-15: LNG Ready and Pending Corridor Segments: Remove designations completely
I-84: LNG Ready and Pending Corridor Segments: Remove designations completely
I-84/I-86/I-15: LNG Ready Segment: Remove designations completely
I-90: LNG Pending Corridor Segment: Remove designations completely
Illinois I-70: LPG Ready: Between IL/IN border and IL/MO border (Designated Round 3) I-70: LPG Ready: Between IL/IN border and Effingham IL
I-70: LPG Pending: Between Effingham IL and IL/MO border
Indiana I-80: LPG Pending: Between IN/IL border and IN/OH border (Designated Round 1) I-80: LPG Ready: Between IN/IL border and IN/OH border
Kentucky I-75: CNG Ready: Between the KY/OH border and the KY/TN border (Designated Round 2) I-75: CNG Ready: Between the KY/OH border and Georgetown
I-75: CNG Pending: Between Georgetown and the KY/TN border
Maryland I-70: EV Ready: Between Baltimore and Hagerstown (Designated Round 1)
I-70: EV Pending: Between Hagerstown and MD/PA border (Designated Round 1)
I-70: EV Ready: Between the eastern terminus in Baltimore and MD/PA border
I-795: EV Pending: Entire highway between Westminster and Reisterstown (Designated Round 3) I-795/SR-140: EV Ready: Between the I-795/I-695 interchange in Pikesville and Westminster
US-1: EV Ready: Between Joppa MD and the MD/DC border (Designated Round 3)
US-1: EV Pending: Between Joppa MD and the MD/PA border (Designated Round 3)
US-1: EV Ready: Between Bel Air and the MD/DC border
US-1: EV Pending: Between Bel Air and the MD/PA border
SR-5: EV Ready: Between MD/DC border and Waldorf MD (Designated Round 3)
SR-5: EV Pending: Between Waldorf and Lexington Park (Designated Round 3)
SR-5/SR-235: EV Ready: Between MD/DC border and Lexington Park
Michigan I-94: LPG Ready: Between Clinton Township and Jackson (Designated Round 2)
I-94: LPG Pending: Between Port Huron and Clinton Township (Designated Round 2)
I-94: LPG Pending: Between Jackson and the MI/IN border (Designated Round 2)
I-94: LPG Ready: Between Clinton Township and the MI/IN border
I-94: LPG Pending: Between Port Huron and Clinton Township (NO CHANGE)
Minnesota I-94: EV Ready: Between Minneapolis and St. Cloud (Designated Round 1)
I-94: EV Pending: Between Sun Prairie WI and Minneapolis MN (Designated Round 1)
I-94: EV Pending: Between St. Cloud and MN/ND border (Designated Round 1)
I-94: EV Ready: Between MD/WI border and St. Cloud
I-94: EV Pending: Between St. Cloud and Alexandria
I-94: EV Ready: Between Alexandria and MN/ND border
Missouri I-70: LPG Ready: Between IL/MO border and St. Louis (Designated Round 3)
I-70: Between St. Louis and Kansas City (Not currently designated for LPG)
I-70: LPG Ready: Between Warrenton MO and Kansas City MO
I-70: LPG Pending: Between IL/MO border and and Warrenton MO
Nevada I-15: EV Pending: Between Las Vegas and the NV/AZ border (Designated Round 1)
I-15: EV Ready: Between the CA/NV border and Las Vegas (Designated Round 1)
I-15: EV Ready: Between Las Vegas and the NV/AZ border
I-15: EV Ready: Between the CA/NV border and Las Vegas (NO CHANGE)
I-80: EV Pending: Entire highway (Designated Round 1)
I-80: EV Ready: Between NV/CA border and Fernley
I-80: EV Pending: Between Fernley and the NV/UT border
I-80: LPG Pending: Between Elko and the NV/UT border (Designated Round 4)
I-80: LPG Ready: Between Elko and the NV/UT border
New York I-84: LPG Pending: Between the NY/PA border and the NY/CT border (Designated Round 1) I-84: LPG Ready: Between the NY/PA border and the NY/CT border
I-90: LPG Ready: Between Buffalo and West Henrietta (Designated Round 1)
I-90: LPG Pending: Between NY/PA border and Buffalo (Designated Round 1)
I-90: LPG Pending: Between West Henrietta and the NY/MA border (Designated Round 1)
I-90: LPG Ready: Between the NY/PA border and Albany
I-90: LPG Pending: Between Albany and NY/MA border
I-95: CNG Pending: Between the NY/NJ border and the NY/CT border (Designated Round 1) I-95: CNG Ready: Between the NY/NJ border and the NY/CT border
SR-27: EV Ready: Between the NY-27/I-278 interchange in Brooklyn and Valley Stream (Designated Round 4)
SR-27: EV Pending: Between Valley Stream and Southampton (Designated Round 4)
SR-27: EV Ready: Between the NY-27/I-278 interchange in Brooklyn and Medford
SR-27: EV Pending: Between Medford and Southampton
North Carolina I-77: EV Pending: between the NC/SC border and Charlotte, and between Mooresville and the I-77/I-44 interchange in Statesville (Designated Round 2)
I-77: EV Ready: between Charolotte and Mooresville (Designated Round 2)
I-77: EV Ready: between the NC/SC border and Mooresville
I-77: EV Pending: between Mooresville and the I-77/I-44 interchange in Statesville
I-85: EV Ready: Between the NC/SC border and the I-85/I-40 interchange in Hillsborough (Designated Round 1) I-85: EV Ready: Between the NC/SC border and Henderson
I-95: EV Pending: Entire length of highway in NC (Designated Round 2) I-95: EV Ready: Between the NC/VA border and Smithfield
I-95: EV Pending: Between Smithfield and the NC/SC border
Ohio I-70: LPG Pending: Between OH/WV border and Columbus OH (Designated Round 3)
I-70: LPG Ready: Between Columbus OH and OH/IN border (Designated Round 3)
I-70: LPG Ready: Between OH/WV border and OH/IN border
Oklahoma I-35: EV Ready: Between Norman and Oklahoma City (Designated Round 1)
I-35: EV Pending: Between Oklahoma City and OK/KS border (Designated Round 1)
I-35: EV Pending: Between Norman and OK/TX border (Designated Round 1)
I-35: EV Ready: Between OK/TX border and Edmond
I-35: EV Pending: Between Edmond and OK/KS border
I-40: EV Pending: Entire length of highway in OK (Designated Round 1) I-40: EV Ready: Between Erick and Shawnee
I-40: EV Pending: Between Shawnee and OK/AR border
I-44: EV Pending: Entire length of highway in OK (Designated Round 1) I-44: EV Ready: Between the I-44/US 277 interchange in Walters and Miami
I-44: EV Pending: Between the OK/TX border and Walters
I-44: EV Pending: Between Miami and the OK/MO border
US-69: EV Pending: Between the OK/TX border and the US-69/I-44 interchange in Vinita (Designated Round 2) US-69: EV Ready: Between Muskogee and Wagoneer
US-69: EV Ready: Between Vinita and Miami
US-69: EV Pending: Between the OK/TX border and Muskogee
US-69: EV Pending: Between Wagoneer and Vinita
US-75: EV Pending: Entire length of highway in OK (Designated Round 2)
US-75: EV Ready: Between the US-75/I-40 interchange in Henryetta and the US 75/US 60 interchange in Bartlesville
US-75: EV Pending: Between the OK/TX border and the US-75/I-40 interchange in Henryetta
US-75: EV Pending: Between the US 75/US 60 interchange in Bartlesville and the OK/KS border
US-412: EV Pending between the OK/AR border and Pawnee (Designated Round 2) US-412: EV Ready: Between the US-412/US-64 interchange in Cleveland and the US 412 (I-244)/SR-11 interchange in Tulsa
US-412: EV Pending: Between Pawnee and the US-412/US-64 interchange in Cleveland
US-412: EV Pending: Between the US-412 (I-244)/SR-11 interchange in Tulsa and the OK/AR border
SR-51: EV Pending: Between the SR-51/I-35 interchange in Orlando to the SR-51/SR-351 split in Broken Arrow (Designated Round 3) SR-51: EV Ready: Between Stillwater and the SR-51/SR-351 split in Broken Arrow
SR-51: EV Pending: Between the SR-51/I-35 interchange in Orlando and Stillwater
SR-351: EV Pending: Between the SR-51/SR-351 split in Broken Arrow and the SR-351/I-40 interchange in Webber Falls (Designated Round 3) SR-351: EV Ready: Between the SR-51/SR-351 split in Broken Arrow and Muskogee
SR-351: EV Pending: Between Muskogee and the SR-351/I-40 interchange in Webber Falls
Indian Nation Turnpike: EV Pending: Between the US-75/I-40 interchange in Henryetta and the Indian Nation Turnpike/US-69 interchange in McAlester (Designated Round 2)
Indian Nation Turnpike: EV Ready: Between the US-75/I-40 interchange in Henryetta and McAlester - Indian Nation Turnpike, Mile 66
Indian Nation Turnpike: EV Pending: Between McAlester - Indian Nation Turnpike, Mile 66 and the Indian Nation Turnpike/US-69 interchange in McAlester
Pennsylvania I-70: EV Pending: Between PA/MD border and Hunker PA at the intersection with I-76 (Designated Rounds 1 and 3)
I-70: EV Ready: Between Hunker PA at the intersection with I-76 and Washington PA (Designated Round 3)
I-70: EV Pending: Between Washington PA and PA/WV border (Designated Round 3)
I-70: EV Ready: Between PA/MD border and Bedford
I-70: EV Pending: Between Bedford and the I-76/I-70 interchange in Hunker
I-70: EV Ready: Between the I-76/I-70 interchange in Hunker and Washington PA
I-70: EV Pending: Between Washington PA and PA/WV border
I-70: LPG Pending: Between MD/PA border and PA/WV (Designated Round 3) I-70: LPG Pending: Between MD/PA border and Washington PA
I-70: LPG Ready: Between Washington PA to PA/WV border
I-79: CNG Ready: Between Washington, PA and Cranberry (Designated Round 2)
I-79: CNG Pending: Between PA/WV border to Washington, PA (Designated Round 2)
I-79: CNG Pending: Between Cranberry and Erie (Designated Round 2)
I-79: CNG Ready: Between PA/WV border and Erie
I-80: EV Pending: Entire length of highway in PA (Designated Round 1) I-80: EV Ready: Between DuBois and Clarion
I-80: EV Pending: Between DuBois and PA/NJ border
I-80: EV Pending: Between Clarion and PA/OH border
I-376: CNG Pending: Between Monroeville, PA (at the intersection of I-76) and West Middlesex, PA (at the intersection with I-80) (Designated Round 2) I-376: CNG Ready: Between Newcastle and Pittsburgh
I-376: CNG Pending: Between Pittsburgh and the I-376/I-76 interchange in Monroeville
I-376: CNG Pending: Between New Castle and the I-376/I-80 interchange in West Middlesex
South Carolina I-26: EV Ready: Between Columbia and Orangesburg (Designated Round 1)
I-26: EV Ready: Between North Charleston and Charleston (Designated Round 1)
I-26: EV Pending: Between SC/NC border to Columbia (Designated Round 1)
I-26: EV Pending: Between Orangeburg and North Charleston (Designated Round 1)
I-26: EV Ready: Between Irmo and Orangesburg
I-26: EV Ready: Between Ladson and Charleston
I-26: EV Pending: Between SC/NC border to Irmo
I-26: EV Pending: Between Orangeburg and Ladson
I-26: CNG Pending: Entire length of highway in SC (Designated Round 1) I-26: CNG Ready: Between SC/NC border and Spartanburg
I-26: CNG Pending: Between Spartanburg and Charleston
I-77: CNG Pending: Entire length of highway in SC (Designated Round 1) I-77: CNG Ready: Between SC/NC border and Rock Hill
I-77: CNG Pending: Between Rock Hill and the I-77/I-26 interchange in Cayce
Tennessee I-24: EV Ready: Entire length - from TN/KY border to TN/GA border (at interchange with I-75) (Designated Round 2)
I-24: EV Ready: Between TN/KY border and Nashville
I-24: EV Pending: Between Nashville and the I-24/I-75 interchange in Chattanooga
I-40: CNG Pending: Entire length of highway in TN (Designated Round 1) I-40: CNG Ready: Between TN/NC border and the I-40/I-75/I-640 interchange in Knoxville
I-40: CNG Ready: Between Nashville and Dickson
I-40: CNG Pending: Between the I-40/I-75/I-640 interchange in Knoxville and Nashville
I-40: CNG Pending: Between Dickson and the TN/AR border
I-40: EV Ready: Between Dandridge and Nashville (Designated Round 1)
I-40: EV Pending: Between TN/AR border and Nashville (Designated Round 1)
I-40: EV Pending: Between Dandridge and TN/NC border (Designated Round 1)
I-40: EV Ready: Between Dandridge and Lenoir City
I-40: EV Pending: Between Dandridge and TN/NC border
I-40: EV Pending: Between TN/AR border and Lenoir City
I-40: LPG Pending: Entire length of highway in TN (Designated Round 1) I-40: LPG Ready: Between TN/AR border and TN/NC border
I-75: EV Ready: Between Knoxville and TN/GA border (Designated Round 2)
I-75: EV Pending: Between Knoxville and TN/KY border (Designated Round 2)
I-75: EV Ready: Between Knoxville and Lenoir City
I-75: EV Ready: Between Ooltewah and TN/GA border
I-75: EV Pending: Between Lenoir City and Ooltewah
I-75: EV Pending: Between Knoxville and TN/KY border (NO CHANGE)
I-81: EV Pending: Between the I-81/I-40 interchange in Dandridge and the TN/VA border (Designated Round 4) I-81: EV Ready: Between the I-81/I-40 interchange in Dandridge and the TN/VA border
Texas I-10: EV Ready: Between Baytown and Katy (Designated Round 1)
I-10: EV Ready: Between San Antonio and Kerrville (Designated Round 1)
I-10: EV Pending: Between TX/LA border and Baytown (Designated Round 1)
I-10: EV Pending: Between Katy and San Antonio (Designated Round 1)
I-10: EV Pending: Between Kerrville and TX/NM border (Designated Round 1)
I-10: EV Ready: Between TX/LA border and Vidor
I-10: EV Ready: Between Baytown and Columbus
I-10: EV Ready: Between San Antonio and Junction
I-10: EV Pending: Between Vidor and Baytown
I-10: EV Pending: Between Columbus and San Antonio
I-10: EV Pending: Between Junction and TX/NM border
I-10: LPG Ready: Between Houston and San Antonio (Designated Round 1)
I-10: LPG Pending: Between TX/LA border and Houston (Designated Round 1)
I-10: LPG Pending: Between San Antonio and TX/NM border (Designated Round 1)
I-10: LPG Ready: Between Houston and Ingram
I-10: LPG Ready: Between Socorro and the TX/NM border
I-10: LPG Pending: Between the TX/LA border and Houston
I-10: LPG Pending: Between Ingram and Socorro
I-10: LNG Ready: Between Baytown and San Antonio (Designated Round 1)
I-10: LNG Pending: Between TX/LA border and Baytown (Designated Round 1)
I-10: LNG Pending: Between San Antonio and TX/NM border (Designated Round 1)
I-10: LNG Ready: Between TX/LA border and San Antonio
I-10: LNG Pending: Between San Antonio and TX/NM border
I-20: CNG Ready: Between Midland and Sweetwater, and Weatherford and the TX/LA border (Designated Round 1)
I-20: CNG Pending: Between the I-20/I-10 interchange in Fort Davis and Midland, and between Sweetwater and Weatherford (Designated Round 1)
I-20: CNG Ready: Between Midland and the TX/LA border
I-20: CNG Pending: Between the I-20/I-10 interchange in Fort Davis and Midland
I-20: LPG Ready: Between Longview and Fort Worth (Designated Round 1)
I-20: LPG Pending: Between TX/LA border to Longview (Designated Round 1)
I-20: LPG Pending: Between Fort Worth to intersection w/I-10 (Designated Round 1)
I-20: LPG Ready: Between TX/LA border and Monahans
I-20: LPG Pending: Between Monahans and the I-20/I-10 interchange in Fort Davis
I-20: LNG Pending: Between From TX/LA border to intersection w/I-10 (Designated Round 1) I-20: LNG Ready: Between Fort Worth and Dallas
I-20: LNG Pending: Between the intersection w/I-10 and Fort Worth
I-20: LNG Pending: Between Dallas and the TX/LA border
I-30: LNG Ready: Between Dallas and Sulphur Springs (Designated Round 1)
I-30: LNG Pending: Between the I-20/I-30 interchange in Aledo and Dallas (Designated Round 1)
I-30: LNG Pending: Between Sulphur Springs and the TX/AR border (Designated Round 1)


I-30: LNG Pending: Between the I-20/I-30 interchange in Aledo and the TX/AR border
I-30: LPG Ready: Between Mesquite TX and Fort Worth (Designated Round 1)
I-30: LPG Pending: Between TX/AR border and Mesquite (Designated Round 1)
I-30: LPG Pending: Between Fort Worth and intersection w/I-20 (Designated Round 1)
I-30: LPG Ready: Between TX/AR border and Fort Worth
I-30: LPG Pending: Between between Fort Worth and the I-30/I-20 interchange in Aledo (NO CHANGE)
I-35: EV Ready: Between San Antonio and the I-35/I-35E/I-35W southern interchange in Hillsboro (Designated Round 1)
I-35: EV Pending: Between San Antonio and TX/Mexico border (Designated Round 1)
I-35: EV Pending: Between the I-35/I-35E/I-35W northern interchange in Denton and the TX/OK border (Designated Round 1)
I-35: EV Ready: Between the I-35/I-35E/I-35W northern interchange in Denton and the TX/OK border
I-35: EV Ready: Between San Antonio and the I-35/I-35E/I-35W southern interchange in Hillsboro (NO CHANGE)
I-35: EV Pending: Between San Antonio and TX/Mexico border (NO CHANGE)
I-35: LPG Ready: Between the southern intersection of I-35E/I-35W to San Antonio (Designated Round 1)
I-35: LPG Pending: Between Denton and TX/OK border (Designated Round 1)
I-35: LPG Pending: Between San Antonio and TX/Mexico border (Designated Round 1)
I-35: LPG Ready: Between Natalia and the I-35/I-35E/I-35W southern interchange in Hillsboro
I-35: LPG Ready: Between the I-35/I-35E/I-35W northern interchange in Denton and TX/OK border
I-35: LPG Pending: Between Natalia and TX/Mexico border
I-40: LPG Pending: Between TX/NM border and TX/OK border (Designated Round 2) I-40: LPG Ready: Between TX/NM border and TX/OK border
I-45: EV Ready: Between Huntsville and the southern end of I-45 (Galveston) (Designated Round 1)
I-45: EV Pending: Between Dallas and Huntsville (Designated Round 1)
I-45: EV Ready: Between the northern terminus in Dallas and Ennis
I-45: EV Ready: Between Madisonville and the southern terminus in Galveston
I-45: EV Pending between Ennis and Madisonville
I-45: LPG Pending: Entire highway from Dallas to Galveston (Designated Round 1) I-45: LPG Ready: Between Hutchins and League City
I-45: LPG Pending: Between the northern terminus in Dallas and Hutchins
I-45: LPG Pending: Between League City and the southern terminus in Galveston
I-635: LPG Pending: Entire length from Grapevine to Balch Springs at the I-635/I-20 interchange  (Designated Round 3) I-635: LPG Ready: Between the I-635/SR-121 in Grapevine and the I-635/I-20 interchange in Balch Springs
US-75/US-69: CNG Ready: Between Dallas and McKinney (Designated Round 2)
US-75/US-69: CNG Pending: Between McKinney and the TX/OK border (Designated Round 2)
US-75/US-69: CNG Ready: Between Dallas and the TX/OK border
Utah I-15: EV Pending: Between UT/AZ border and Springville (Designated Round 1)
I-15: EV Ready: Between Springville and Ogden (Designated Round 1)
I-15: EV Pending: Between Ogden and UT/ID border (Designated Round 1)
I-15: EV Ready: Between AZ/UT border and Scipio
I-15: EV Pending: Between Scipio and Santaquin
I-15: EV Ready: Between Santaquin and Perry
I-15: EV Pending: Between Perry and UT/ID border
I-80: LPG Pending: Between Salt Lake City and UT/WY border (Designated Round 1)
I-80: LPG Ready: Between Salt Lake City and UT/WY border
Virginia I-95: LPG Ready: From Washington DC to Ashland (Designated Round 1)
I-95: LPG Pending: From Ashland to VA/NC border (Designated Round 1)
I-95: LPG Ready: Between VA/DC border to Chester
I-95: LPG Pending: Between Chester and VA/NC border
West Virginia I-70: LPG Pending: Between WV/PA border and WV/OH border (Designated Round 3) I-70: LPG Ready: Between WV/PA border and WV/OH border
Updated: 12/7/2020
HEP Home Planning Environment Real Estate
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000