DEPARTMENT OF TRANSPORTATION [4910-22-P]
Federal Highway Administration
23 CFR Parts 635, 710, and 810
[Docket No. FHWA-2014-0026]
RIN 2125-AF62
Right-of-Way and Real Estate
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Final rule.
SUMMARY: The FHWA is revising its regulations governing the acquisition, management, and disposal of real property for transportation programs and projects receiving funds under title 23, United States Code. The revisions are prompted by enactment of the Moving Ahead for Progress in the 21st Century Act(MAP-21). Section 1302 of MAP-21 includes new early acquisition flexibilities that can be used by State departments of transportation (SDOT) and other grantees of title 23 Federal-aid highway program funds. This final rule addresses the use of those new early acquisition flexibilities. The FHWA is also updating the real estate regulations to reflect the agency’s experience with the Federal-aid highway program since the last comprehensive rulemaking for part 710, which occurred more than a decade ago. The update clarifies the Federal-State partnership, streamlines processes to better meet current Federal-aid highway program needs, and eliminates duplicative and outdated regulatory language. The enactment of the Fixing America’s Surface Transportation (FAST) Act had a minimal effect on this rule.
DATES: This final rule is effective [INSERT DATE 30 DAYS AFTER PUBLICATION IN FEDERAL REGISTER].
FOR FURTHER INFORMATION CONTACT: Arnold Feldman, Office of Real Estate Services, (202) 366-2028, e-mail address: Arnold.Feldman@dot.gov; or Robert Black, Office of the Chief Counsel, (202) 366-1359, e-mail address: Robert.Black@dot.gov; Federal Highway Administration, 1200 New Jersey Avenue, SE., Washington, DC, 20590. Office hours are from 7:30 a.m. to 5:00 p.m., e.t., Monday through Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION:
Table of Contents for Supplementary Information
III. Rulemaking Analyses and Notices
Electronic Access and Filing
This document and all comments received may be viewed online through the Federal eRulemaking portal at http://www.regulations.gov. The Web site is available 24 hours each day, 365 days each year. An electronic copy of this document may also be downloaded by accessing the Office of the Federal Register’s home page at: https://www.federalregister.gov.
The FHWA published a Notice of Proposed Rulemaking (NPRM) on November 24, 2014 (79 FR 69998), proposing to amend regulations governing the acquisition, management, and disposal of real property for transportation programs and projects receiving funds under title 23, United States Code.
Since the publication of the NPRM, the FAST Act was enacted into law on December 4, 2015. The FAST Act has minimal effect on this rule. The FAST Act at section 1109 repealed the Transportation Alternatives Program (TAP) (23 U.S.C. 213) and replaced it with a set-aside of Surface Transportation Block Grant (STBG) program funding for transportation alternatives (TA). The final rule has been changed to reflect the new program name.
This final rule retains the major NPRM provisions without change. In particular, this final rule adds new authorities for early acquisition of property to part 710 and clarifies the Federal-aid eligibility of a broad range of real property interests that constitute less than full fee ownership. It streamlines program requirements, clarifies the Federal-State partnership, and provides a comprehensive update of part 710. Related regulations in 23 CFR parts 635 and 810 were also updated to ensure consistency with the part 710 changes. The updates to 23 CFR parts 635, 710, and 810 better align the language of the regulations with current program needs and best practices.
As proposed in the NPRM, important changes in the final rule include:
As part of the NPRM, FHWA estimated the incremental costs associated with the new requirements proposed in the NPRM that represented a change to current practices for State DOTs and Metropolitan Planning Organizations. The FHWA believes that the expected qualitative and quantitative benefits from the use of the early acquisition flexibilities alone will exceed the cost of implementing the rule. In addition, FHWA believes that significant benefits may accrue because this rule will clarify and streamline additional requirements including property management requirements, stewardship and oversight requirements, and Federal Land transfer requirements. The FHWA did not receive comments on its cost estimates or discussion of benefits.
All comments received in response to the NPRM have been considered in adopting this final rule. Comments were received from 18 entities. The commenters included: 14 SDOTs, the American Association of State Highway Transportation Officials (AASHTO), one Federal Agency, one consultant, and one private citizen.
The following discussion summarizes the comments submitted to the docket on the NPRM, notes changes that have been made to the final rule, and states why certain recommendations or suggestions have not been incorporated into the final rule.
General Discussion of Comments.
In general, most of the commenters expressed support and appreciation for the revisions and concurred that the rule will improve efficiency, effectiveness, and accountability in the delivery of transportation programs and projects receiving funds under title 23 of the United States Code. Three commenters asked that FHWA include provisions for Construction Manager General Contractor (CMGC) and appraisal valuation waiver limits. Several commenters proposed that additional flexibilities be included in this final rule and also requested additional guidance or regulatory language on implementation of several provisions.
The FHWA has responded to each comment received during the comment period and has made changes to the final rule where necessary. The FHWA is developing an implementation guide and a set of frequently asked questions to assist with the implementation of the final rule.
Comments on Construction Manager/General Contractor.
Two commenters, both from the California DOT (Caltrans), proposed to include CMGC in the final rule. One commenter suggested referencing it in the regulation at 23 CFR 635.309, the section on authorization of ROW and the other commenter suggested developing a new section of the regulation on CMGC. Also, Caltrans noted that CMGC methods are no longer a demonstration project but rather an alternative method of project delivery and as such, should be referenced by this section (23 CFR part 635).
The FHWA does not believe that incorporating CMGC by reference in 23 CFR 635.309 will effectively address all issues pertinent to CMGC. The FHWA also does not believe that addressing CMGC is within the scope of this final rule on real estate acquisition, as CMGC is a broader topic focused primarily on contracting and project development issues. Although CMGC will not be further addressed in this final rule, FHWA published an NPRM on CMGC on June 29, 2015, at 80 FR 36939.
Comments on Right-of-Way Certification.
Several commenters (AASHTO, New York State DOT (NYSDOT), Oklahoma DOT (ODOT), and Washington State DOT (WSDOT)) supported providing additional flexibility in the use of conditional ROW certifications.
The AASHTO suggested that a ROW certification should not be required as early as the submittal of Plans, Specifications, and Estimates (PS&E) to FHWA, but States should instead be allowed to provide this certification as late as 30 days prior to issuance of the Notice to Proceed (NTP).
The FHWA does not believe that a standard allowing submission of a ROW certificate 30 days prior to issuance of a NTP is consistent with the purpose, intent, and timing of the ROW certificate. In part, a standard allowing submission of a certificate 30 days prior to the NTP may introduce uncertainty in the bid process, give rise to contractor delay claims, and may cause property owners to be more frequently in the path of construction. The FHWA believes that requiring a ROW certification at the time of PS&E, coupled with the flexibility to utilize conditional ROW certifications to allow advertising the project for bid while continuing to clear the ROW, strikes the appropriate balance between advancing a project while also ensuring property owners’ rights are protected.
The NYSDOT noted that it might be clearer to use terminology other than NTP since it is typically associated with design-build projects, not design/bid/build projects, and inquired whether the intent of this rule was to apply only to design-build projects. Also, NYSDOT suggested that it might be clearer to add the phrase “or award” to clarify that these provisions apply to either NTP or award.
The FHWA clarifies in this final rule that the ROW certification requirements apply both to design-build projects and design/bid/build projects. The certification requirements for design-build projects are specifically addressed in § 635.309(p). The FHWA does not believe that adding “or award” would be appropriate, as this addition could be interpreted as allowing construction to begin in instances where all properties have not been secured as a normal part of the process. This final rule clarifies that allowing construction to begin before all properties have been cleared should only be done in exceptional circumstances where it is in the public interest to proceed with construction before acquisition activities are complete.
The ODOT expressed concern that the statement in the conditional ROW certification that the FHWA will approve the request unless it finds that it will not be in the public interest to proceed with the bidding before acquisition activities are complete,may be subject to misinterpretation. Instead, ODOT suggested that if comparable housing is available for displaced persons, the requirements for approving a conditional ROW certification should be deemed to be met for all requests.
The FHWA appreciates that the determination that comparable housing is available is an important milestone to ensure that displaced persons’ rights are protected. However, ensuring that comparable housing is available is only one of several factors FHWA will consider in making such a determination. The SDOTs should work directly with their FHWA Division Office to develop additional details relevant to the use, consideration, and approval of conditional ROW certifications in their ROW manuals. In addition, the SDOT’s Stewardship and Oversight agreement may serve to document approval authorities and reduce any uncertainty as to process.
The WSDOT requested clarification on FHWA’s expectation regarding the requirement to provide an updated notification prior to issuing an NTP when there are excepted parcels. It asked if there was an expectation that the ROW certificate be updated after bid opening, but prior to issuing the NTP.
The final rule at § 635.309(c)(3)(iv), states that “Prior to the State issuing a notice to proceed with construction to the contractor, the State shall provide an updated notification to FHWA identifying all locations where right of occupancy and use has not been obtained along with a realistic date when physical occupancy and use is anticipated.” The updated notification must be provided to FHWA prior to issuing an NTP. Updating the ROW certificate may be sufficient; however, FHWA leaves it to the discretion of the FHWA Division office to determine the type of form used to document the updated notification. The procedure must be documented in the State ROW manual.
Comment on Increasing the Threshold for an Appraisal and a Waiver.
One public agency, the U.S. Fish and Wildlife Service, requested that the threshold for an appraisal and a waiver valuation be increased.
The FHWA believes that making the suggested changes would require changes to the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (Public Law 91–646, 84 Stat. 1894; primarily codified in 42 U.S.C. 4601 et seq;) (Uniform Act) regulation, which is outside of the scope of this rulemaking.
Comment on the Length of Occupancy Requirements.
The Connecticut DOT commentedthat because the length of occupancy requirements changed under MAP-21 (for home-owners it was reduced from 180 to 90 days), it would seem logical that the “valid lien” requirement period for the determination of Mortgage Differential Payments would have been reduced to 90 days as well.
The FHWA believes that making the suggested changes would require changes to the Uniform Act regulation, which is outside of the scope of this rulemaking.
Comments on New Terminology – Grantee/Subgrantee at § 710.103 and definition of Grantee at § 710.105.
Three commenters, AASHTO, South Dakota DOT (SDDOT), and Colorado DOT (CDOT) expressed concern that the specific terms (including grantee, subgrantee, SDOT, and State) and the definition of grantee used to describe to whom and when the requirements of this rule apply, are unclear. In part, the commenters noted that they are primarily attempting to comply with eligibility requirements to receive reimbursement and do not believe that the use of grantee or other similar descriptors is an accurate use of the terms.
In addition, Caltrans noted that the terms “title 23 funds,” “title 23 grant funds,” “grant funds provided under title 23,” and “grant funds,” are used interchangeably in the regulations and suggested that for purposes of clarity only one term be used to describe these funds.
The FHWA acknowledges that the regulations cover a broad range of subjects and entities. The FHWA continues to believe that the scope of the regulations, the many parties referred to in the regulations, and the nature of each reference make it impractical to use a general definition and description. Doing so would lead to uncertainty about the applicability of provisions of this rule. As a result, this final rule will continue to include definitions for the terms “grantee” and “subgrantee.” The term “grantee” is used to refer to all parties directly receiving title 23 grant funding. The term “subgrantee” is used to refer to parties receiving funding indirectly.
Comment on the Removal of “Air Rights” and “Air Space” Definition—§ 710.105.
The WSDOT and a private citizen commented on the removal of the definition of air space. The WSDOT noted that the definition, although proposed to be deleted, was used in the regulations as a part of the definition for real property and real property interest. Also, the private citizen was concerned that eliminating the concepts of air space and air rights and instead using a ROW Use Agreement will mask the intent of the regulation and remove transparency.
The FHWA recognizes that the term “airspace” is used in sections 111(a) and 142(f) of title 23, U.S.C., as well as in FHWA regulations. The FHWA notes that the terms airspace and air rights are still valid description of a real property right; however, these terms are now referred to under a comprehensive title—“real property interest.” The FHWA believes that the terms “air rights” and “airspace” are describing interests that do not need separate definitions. As defined in the current rule, air rights means real property interests defined by agreement, and conveyed by deed, lease, or permit for the use of airspace. Airspace is defined as that space located above and/or below a highway or other transportation facility’s established grade line, lying within the horizontal limits of the approved right-of-way project boundaries. The FHWA believes that describing and granting requests using a singular comprehensive description rather than several definitions will ensure clarity within the regulation. Real property interests will no longer be granted by an air rights agreement; rather, FHWA will now use a blanket agreement called a “ROW use agreement.” The FHWA does not believe that using this type of agreement will result in any misuse because the requirements for considering and approving a proposed use have not changed. The intent is not to mask or to remove transparency, but rather to streamline this process by eliminating redundant terms and more effectively focus on the various highway uses and the impact on the facilities.
Comment on Mitigation Definition – § 710.105 (b).
The Caltrans noted that including mitigation in the definition of ROW may result in delaying a ROW certification until all mitigation commitments are purchased. The Caltrans stated that these transactions are often between other States and/or Federal agencies and any significant time delay could impact construction advertisement and financial expenditures.
The FHWA does not believe that the inclusion of the term “mitigation” in the definition of ROW requires that all real property interests in mitigation properties necessary for the project be secured at the time of ROW certification or that it will necessarily cause other delays. The FHWA believes that real property interests in mitigation parcels needed for the project, to the extent practicable, should be secured and included in the ROW certification statement.
Notification that real property interests in mitigation parcels needed for the project have not been secured at the time of ROW certification must be provided in the bid proposals identifying that work to ensure the contractor is aware that the process for acquiring the necessary real property interests will be underway concurrently with the highway construction. Consequently, proceeding with construction while attempting to secure real property interests needed for mitigation may create exposure to delay claims and other risks to the SDOT. While the FHWA does not believe that such risks will be great, SDOTs should carefully consider the risks.
Comment on Option Definition—§ 710.105 (b).
The CDOT agreed with the addition of the definition of “option” and the use of the term as it will ensure that eligibility requirements for reimbursement when an option is used are understood.
The FHWA appreciates the comment and agrees that the definition is needed. Comment on the RAMP (Real Estate Acquisition Plan) Definition—§ 710.105 (b).
The NYSDOT requested that in addition to the definition of a RAMP in the final rule, a sample of a RAMP and what it includes should be added to the final rule.
The FHWA does not believe that it is practical to provide samples of a RAMP or a list of what should be included in a RAMP in a way that addresses each SDOT’s needs. The SDOTs should work with their respective FHWA Division office partners to develop updates to their ROW manual which lists requirements for a RAMP, and the process to be followed in requesting, reviewing, and approving a RAMP.
The WSDOT stated that the definition of a RAMP included in the final rule should include information captured in the NPRM summary, which in part stated that the use of a RAMP is appropriate for a subgrantee, non-SDOT grantee, or design-build contractor if that party infrequently carries out title 23 programs or projects, the program or project is non-controversial, and the project is not complex.
The FHWA agrees with the comment that adding the information discussing the appropriate parties who may use a RAMP at § 710.201(d)(3) will provide needed details on appropriate use of RAMPs. The FHWA has incorporated the language in this final rule.
Comment on ROW Use Agreement Definition—§ 710.105 (b).
Pennsylvania DOT (PennDOT) commented that the definition of a ROW use agreement should not include a highway occupancy permit because a highway occupancy permit is not a real property interest. The PennDOT expressed concern that the definition may lead to future ROW damage claims when the utility is required to relocate as a result of a highway project.
The FHWA notes that the final rule definition does not specifically include highway occupancy permits, but instead focuses more broadly on non-highway uses. The final rule addresses utility permits at § 710.405(a)(2), which lists a number of exceptions that do not apply to the ROW use agreement, including utilities and railroads (which are governed by other sections of this title), bikeways, and pedestrian walkways.
Comment on Legal Settlement Definition—§ 710.105 (b).
Caltrans noted that this section references an “authorized legal representative.” Caltrans suggested deleting this reference and using instead the same statement found in § 710.305(c), a “responsible official of the acquiring agency.” They commented that the term “legal” seems to imply that the delegated representative must be an attorney.
The FHWA agrees that a minor change is necessary to ensure that the applicability and meaning of this section is clear. The final rule now references a “responsible official.” The definition of “legal settlement”in the final ruleis a settlement reached by an authorized legal representative or a responsible official of the acquiring agency that has the legal power vested in him or her by State law.
Comment on ROW manual requirements—§ 710.201(c).
Caltrans suggested that the final rule include “legal settlements” in the list of ROW functions and procedures to be described in the ROW manual.
The FHWA agrees that adding “legal settlements” to this list adds clarity and has made the change in this final rule. However, the requirements in this part of the regulation are not meant to be an exhaustive list of functions and procedures that must be described in the ROW manual, but rather a list that illustrates several of the functions and procedures. The FHWA believes that each SDOT should determine the appropriate functions to list in its ROW manual.
Comments on ROW Manual Alternative (RAMP)—§ 710.201(d).
Six commenters (AASHTO, SDDOT, Caltrans, ODOT, Georgia DOT (GDOT), and Wisconsin DOT (WisDOT)), supported the requirement that a State ROW manual be used by all agencies in a State. The AASHTO and SDDOT voiced concern about the proposed allowance for use of alternatives to a State ROW manual, and noted that permitting the use of alternatives to the State ROW manual does not seem compatible with the statement in the NPRM that FHWA believes that it is necessary to ensure that other grantees of title 23 funds meet the same requirements that the SDOT currently meets.
Caltrans commented that the oversight required to review alternatives to an approved SDOT ROW manual would be “devastating” because Caltrans is not sufficiently staffed to conduct these reviews. Several commenters (ODOT, GDOT and WisDOT), voiced similar concerns about the administrative effort necessary to review and approve alternatives to SDOT ROW manuals.
The ODOT noted that FHWA anticipated in the NPRM that the number of non-State DOT grantees will continue to increase, and that the role of non-State DOT parties in title 23 projects and programs will continue to evolve and grow. The ODOT further noted that additional funding for increased oversight was not addressed in the proposed rulemaking and that it supports this measure, but only if the proper structure is put in place for the program to succeed.
The GDOT commented that it believes that the creation of separate, local, right-of-way manuals and utilization of RAMPS that may conflict with SDOT manuals could create challenges as SDOTs provide oversight and issue ROW certifications.
The FHWA appreciates the insight provided in the comments regarding the potential difficulties and costs of allowing alternatives to the use of an approved SDOT ROW manual. However, a number of the commenters incorrectly assumed that the use of an alternative to SDOT ROW manuals did not require SDOT permission. If an SDOT subgrantee would like to use an alternative to an SDOT ROW manual, it must first gain the SDOT’s permission to do so. The FHWA has added language to this section clarifying that the ROW manual options can only be used with SDOT approval. The FHWA understands that not all SDOTs will permit the use of alternatives to the SDOT ROW manual. In developing a SDOT ROW manual, the SDOT must clearly state whether it will allow alternatives. If allowed, the manual must also include the SDOTs process for considering use of an alternative to the SDOT ROW manual and that the review and approval process for that alternative must be clearly documented.
The WisDOT requested that FHWA ensure that under the final rule SDOT’s would have the authority to approve any RAMP or ROW Manual agreements developed by an entity that requires WisDOT oversight. The WisDOT was concerned about reviewing, approving, and cataloging the many RAMPs that local public agencies (LPA) may submit. It noted that WisDOT has drafted and maintained a LPA ROW manual which municipalities are already required to use and they felt that this process would be consistent with the rule’s flexibility.
The FHWA agrees that the final rule does not require the use of alternatives to the SDOT ROW manual and thus ensures that an SDOT will have the discretion to decide whether or not to permit the use of a RAMP or other alternative to a ROW manual.
Comment on Assignment of FHWA Approval Actions to a SDOT—§ 710.201(h).
The Idaho Transportation Department (ITD) and WSDOT expressed concern regarding FHWA’s proposed revisions pertaining to SDOT assumption of some of FHWA’s approvals and property related oversight. They noted that the current regulation states that the SDOT and the FHWA will agree on the scope of property related oversight and approval actions that the FHWA will be responsible for. The NPRM proposed changing this language to provide that FHWA will be responsible for “any action not expressly assigned to the State DOT” in the Stewardship/Oversight Agreement between the State DOT and FHWA. The commenters requested that FHWA expand on this statement to clarify its intent.
After considering these comments, FHWA is retaining the language with one clarifying change. The FHWA inserted “approval” into the sentence so that it now reads as follows: “The FHWA retains responsibility for any approval action not expressly assigned to the SDOT in the Stewardship/Oversight Agreement.” This change clarifies that only the FHWA approvals and property-related oversight that FHWA transfers to the SDOT must be in the Stewardship/Oversight Agreement. The FHWA notes that in accordance with long-standing policy and the provisions of 23 U.S.C. 106(c), FHWA uses the Stewardship/Oversight Agreement executed between FHWA and the SDOT to document the transfer of responsibility for an array of project decisions from FHWA to the SDOT. This policy of using the Stewardship/Oversight Agreement as the vehicle for transferring FHWA decisionmaking authority to the SDOT applies across the Federal-aid highway program, except in certain limited instances where stand-alone agreements are contemplated by statute (such as the assignment of environmental review responsibilities to States under 23 U.S.C. 327 and programmatic categorical exclusion agreements under Section 1318(d)(3) of MAP-21).
Accordingly, approvals and property-related oversight that will be made by the SDOT instead of FHWA must be documented in the applicable Stewardship/Oversight Agreement. The SDOT ROW manual cannot be used to assign or delegate decisionmaking authority to the SDOT, or to expand decisionmaking authority transferred to the SDOT under the Stewardship/Oversight Agreement. Any decisionmaking action not expressly given to the SDOT under the Stewardship/Oversight Agreement is retained by FHWA. There are many ROW oversight and project development activities that SDOTs carry out that do not involve an approval or property related oversight under the law (including regulations). Those other types of actions are documented in the SDOT ROW manual, which details how such responsibilities will be carried out by the SDOT, but will not typically be included in the Stewardship/Oversight Agreement.
The WSDOT inquired about programmatic agreements and whether a programmatic agreement would override a Stewardship/Oversight agreement.
As noted in response to the previous comment, any transfer of FHWA decisionmaking responsibilities for real estate matters to the SDOT must be through the applicable Stewardship/Oversight Agreement. Any other agreements and the SDOT ROW manual must be consistent with the Stewardship/Oversight Agreement.
Comments on the List of Activities Allowed Prior to NEPA (National Environmental Policy Act)—§ 710.203(a)(3).
The ODOT commented that it strongly endorses the revisions regarding the preparation of appraisals, appraisal reviews, and appraisal waivers that can occur prior to completion of a NEPA decision for a project subject to title 23. It estimates that this change will reduce the preconstruction phase by up to 3 months. The WSDOT also requested that preliminary relocation planning activities be added as an eligible activity in 23 CFR 710.203(a)(3) and as an eligible expense in § 710.203(b).
The final rule states that contact with potentially affected property owners is permissible for the purposes of developing an appraisal of real property. All negotiations and interviews with potentially displaced persons must be deferred until after the NEPA decision, except in two cases: 1) early acquisitions under § 710.501; and 2) hardship or protective acquisitions under § 710.503. However, FHWA agrees that certain relocation planning activities and associated expenses which do not require personal contact or interviews with those who may be displaced should be eligible activities prior to a NEPA decision. The final rule allows eligibility for these preliminary relocation planning activities including, but not limited to, costs associated with developing a list of comparables, identifying replacement neighborhoods, and documenting available public services. This list is not exclusive.
Comments on Including Closing and other Acquisition Cost—§ 710.203(b).
The CDOT provided comments supporting the inclusion of closing and other acquisition-related costs as eligible for reimbursement. The ITD welcomed the discussion and explanation of eligible costs. Three commenters (AASHTO, CDOT, and NYSDOT) commented that the subsection of the final rule allowing the costs associated with administrative settlements (in accordance with 49 CFR section 24.102(i)), legal settlements, court awards, and costs incidental to the condemnation process, should specifically include the phrase “closing and other acquisition-related costs” so that it would be clear that these costs are also officially eligible for reimbursement.
The FHWA agrees that adding language from the NPRM preamble which directly addressed eligibility for these costs to the regulation will help to further clarify that costs associated with closing and costs of finalizing the ROW acquisition are direct eligible costs. The FHWA included a provision in this final rule at § 710.203(b)(1)(vi) which states that ordinary and reasonable costs in closing and finalizing the acquisition are reimbursable. However, FHWA does not believe that including an exhaustive list of eligible costs in this regulation, which would include costs associated with closing or finalizing the acquisition, is practical or necessary. Each grantee is expected to determine and document in its SDOT ROW manual what are considered customary and usual costs in that State.
Comments on Reimbursement of Attorney Fees—§ 710.203(b)(1)(iv).
The AASHTO supported including agency attorney fees and excluding other attorney fees, unless required by State law or approved by FHWA.
Two commenters, CDOT and NYSDOT, provided comments on reimbursement of attorney’s fees. The CDOT stated that it supports including reimbursement of the acquiring agency’s attorney fees and excluding other attorney fees unless required by State law or approved by FHWA. The NYSDOT asked whether the regulations should also include a provision for reimbursement of attorney fees for other parties (i.e., property owner).
The FHWA appreciates CDOT’s support of the reimbursement of acquiring agency’s attorney fees. As a result no changes were made. Also, FHWA is aware that several States have statutes requiring reimbursement of a property owner’s attorney fees, but notes that a number of States have no such statute. The FHWA agrees that a decision to provide for reimbursement of a property owner’s attorney fees is appropriately left to State law and is more appropriately addressed and documented in the SDOT ROW manual.
Comment on Waiver Evaluation instead of Appraisal Waiver —§ 710.203(b)(1)(v).
The AASHTO and CDOT commented that the use of the term “waiver valuation” instead of “appraisal waiver” is an improvement and that it relates more closely to the language in 49 CFR part 24.
The FHWA appreciates the comment and agrees that “waiver valuation” is a more appropriate term. As a result, the final rule now uses the term wavier valuation.
Comment on Alternate Access Point Eligible Expense—§ 710.203(b)(6)(ii).
The AASHTO and CDOT commented that adding a reference to “alternate access points” in this section and making expenses related to the provision of “alternate access points” outside the ROW an eligible expense for reimbursement was appreciated.
The FHWA appreciates the comment and agrees. No additional changes were made to this section of the regulation.
Comment on Non-State DOT Grantee Projects—§ 710.307(b).
The ITD requested clarification of the last sentence of § 710.307(b). It felt that the sentence was too general and it was not clear whether FHWA would review the subgrantee projects done through our oversight and administration.
The definition of a “grantee” found at § 710.105(b) states that grantee is a “party that directly receives title 23 funds and is accountable to the FHWA for the use of such funds and for compliance with applicable Federal requirements.” As a result, a non-State DOT grantee would be a recipient of Federal funds directly from FHWA, thereby requiring FHWA to provide review and approval of ROW availability statements, certifications, and other project documentation in accordance with applicable law. Subgrantees are not direct recipients of Federal funds since they receive their funds through the SDOT. The direct recipient of Federal funds in this rule is referred to as the SDOT, who in turn provides the Federal funds to the subrecipient. As such, the SDOT, not FHWA, is required to provide oversight and administration to the subrecipient.
Comments on Design-builder use of ROW Manual or RAMP—§ 710.309(d)(1).
Several commenters expressed appreciation for clarification of the design-build requirements. However, four commenters (AASHTO, Caltrans, GDOT and PennDOT) noted that all projects should be required to use the SDOT ROW manual and should not be allowed to use a RAMP. The PennDOT was concerned that allowing the use of a RAMP would effectively supersede the SDOT’s oversight role.
The FHWA understands that several of the commenters interpreted the new RAMP flexibility within this final rule as allowing either FHWA or a subgrantee to approve use of a RAMP. The FHWA appreciates the question and clarified in the regulation that an SDOT or other grantee that is responsible for oversight must first make a determination that it will allow the use of a RAMP by its subgrantee. The SDOTs may choose one of three procedures to demonstrate that the FHWA-approved ROW procedures will be followed. According to §§ 710.201(d)(1) through (3), an acquiring agency may use: 1) the FHWA-approved SDOT ROW manual; 2) its own ROW manual which must be approved by the reviewing agency that it meets Federal and State requirements; or 3) a RAMP setting forth the procedures the acquiring agency will follow which must be approved by the reviewing agency. The decision as to which procedure is allowed is ultimately left to the discretion of the SDOT for all programs which use Federal-aid funds supplied by the SDOT.
Comment on Park and Ride Lots and Air Rights—§ 710.403(b).
The AASHTO was concerned that § 710.403(b) could possibly be interpreted as restricting beneficial non-highway uses, such as parking within the Interstate ROW, which could have a negative impact on Park and Ride lots and air space leases.
Park and Ride lots continue to be subject to the requirements and conditions of 23 U.S.C. 137 and 23 CFR 810.106. The FHWA does not believe that the requirements of 23 CFR 710.403(b) can be read as prohibiting park and ride lots or creating additional conditions for permitting them. In order to clarify this point, FHWA has added language to the final rule referencing 23 U.S.C. 137 and 23 CFR 810.106.
Comments on Determining Excess Property in ROW Manual or RAMP—§ 710.403(c).
The ITD requested that the section begin with the following statement: “The purpose of this section is….” It commented that the section is new and believed that the additional language would help to better provide insight into the purpose of the section.
The FHWA appreciates the suggestion but believes that the first sentence adequately states the subject of the paragraph—that grantees shall specify their procedures in their approved ROW manual or RAMP.
The NYSDOT strongly preferred keeping the list of organizational units with whom the grantee must coordinate to make a determination of excess property in the regulations. It feared that once the final rule is published, it may appear that the requirements for coordination among organization units had been reduced, which would diminish the importance of following the prescribed process of circulating an excess determination request through the organizational units.
The FHWA understands the commenter’s concern. However, the removal of the list of organizational units was not intended to reduce the requirements. Each State has its own internal structure and processes that differ. The FHWA believes SDOTs are best qualified to determine what type of internal coordination is appropriate. The FHWA notes that the process used and the determination of which organizational units should be contacted are to be documented in the State ROW manual, which FHWA approves.
Comments on Charging Fair Market Value—§ 710.403(e).
The PennDOT requested that § 710.403(e) be revised to include the following statement: “…submitted to FHWA in writing and may be approved by FHWA (if not assigned to SDOT) in the following situations….”
The FHWA uses the Stewardship/Oversight Agreement executed between FHWA and the SDOT to document the transfer of responsibility for an array of project decisions from FHWA to the SDOT. However, making an exception to the requirement to charge fair market value is not an action that FHWA may delegate or assign. The FHWA retains that approval authority. As a result, no change was made to the language.
The NYSDOT requested clarification of the phrase “must be in the public interest.” It asked whether that phrase would preclude the SDOT from issuing an Alternate Use and Occupancy permit for fair market value unless it makes a public interest determination.
The FHWA requires a public interest determination if the real property interest lies within the ROW limits, even though fair market value is charged. A public interest determination is needed in the following cases: 1) Proposing to use the existing ROW for a non-highway, alternate use (with the exception of permits issued for construction of a highway project such as utility permits.) (See §§ 710.405(a)(1)(2)); and 2) If real property interests inside or outside the ROW limits are sold or leased for less than fair market value (See § 710.403(e)). The FHWA does not require a public interest determination if the property is located outside of the ROW and sold or leased for fair market value.
The PennDOT also requested further explanation of what information would be acceptable to provide assurance that the public receives benefit to justify less than fair market value.
As stated in the preamble of the NPRM, the criteria for determining whether adequate social, environmental, or economic benefits are present must be clearly and unambiguously detailed in the approved ROW manual in order to clearly document the specific positive benefits that the grantee and public will be receiving as a result of the proposed disposal. The FHWA believes this final rule provides the SDOT and the FHWA Division Office the flexibility to determine and document the criteria necessary to justify whether adequate social, environmental, or economic benefits are present to determine a fair return.
Comments on ROW Use Agreements for Non-highway Use—§ 710.405(a).
The ITD requested a definition for ROW use agreement and was unsure of what uses can be included in the agreement, and also asked where bikeway and pedestrian walkways issues are explained in the final rule. The ODOT expressed concern that ROW use agreement is too broadly applied in this rule and may impact future permitting activities, such as utility permits, which are not properly the subject of ROW use agreements.
To address these comments, FHWA added clarifying language to this part (“except for the Interstate highways”) to ensure that the delegation questions above are clearly addressed for the Interstate. The FHWA provides a definition of the ROW use agreement in the final rule at § 710.105(b). To determine if a non-highway use is allowed within the ROW limits, the request must meet the terms and conditions outlined in § 710.405. However, there are exceptions where the ROW use agreement does not apply, including railroads, public utilities, bikeways and pedestrian walkways (see § 710.405(a)(2)). Although the previous terms, “air rights or air space,” have been replaced with “real property interests,” the FHWA fully expects the SDOT evaluation process to embody the same considerations for protecting the transportation facility that the current regulation calls for in its air space, air rights agreements, and leasing provisions.
Comments on Information Needed to Protect Federal Interest in Facilities.—
§ 710.405(b).
The PennDOT requested a revision to the language at 23 CFR part 710.405(b)(7) to add “if not assigned to SDOT” when requiring FHWA approval if the agreement affects a Federal-aid highway.
The FHWA agrees and made the requested revision in order to clarify this sentence.
The PennDOT also requested that FHWA delete the references to a guidance document for additional terms and conditions appropriate for inclusion in the ROW use agreements. The PennDOT requested that any regulatory requirements for ROW use agreements be listed directly in the regulation. It reasoned that guidance can be revised outside the regulatory review process. If this reference remains in the regulation, the SDOT requested that the language be clarified so that it is clear that the other terms and conditions listed in the guidance are not mandatory requirements.
The FHWA referenced the air rights guidance to provide additional terms that SDOTs might employ in ROW use agreements, as needed. As such, the reference to air rights will remain. However, language will be added to clarify that the terms and conditions in the guidance document are not mandatory requirements.
In addition, PennDOT suggested that § 710.405(d) be revised if it is applied to the disposition of excess ROW since it should not have to conform to the current design and safety criteria. However, if there are proposed changes to the highway as a result of the proposed use of the excess ROW, then PennDOT agrees it would require compliance with current design and safety criteria.
The FHWA believes that in a situation where property within the project limits is determined by the SDOT to be in excess of its needs, the SDOT and FHWA Division office must ensure the proposed use and improvement to the excess ROW is in the public need and/or interest.
Comments on Application Requirements for use of ROW Interests—§ 710.405(e).
The CDOT asked for clarification and guidance on how to document that the ROW use agreement is in the public interest.
The purpose of the phrase “public interest” is to require the development of a determination of whether the proposed use is consistent with public need and/or interest. The final rule does not require a specific standard or require that indicators be considered. Each SDOT should set the standards for documenting public interest in its ROW manual. Measures that might be used may include a benefit to the public expected from the proposed use, addressing a long standing public need, a financial benefit to the public from the use, or a social or environmental benefit from the use.
The Caltrans, NYSDOT, and PennDOT questioned whether the use of 3D plans should be necessary in all cases and also pointed out that 3D plans were not defined.
The FHWA or the grantee may require 3D plans or presentations on major projects such as air rights involving highway tunnels, subway tunnels, railroad tunnels, above and underground parking decks, etc. However, if the real property interest is used as vacant land, leisure activities (such as walking or biking), beautification, parking of motor vehicles, public mass transit facilities which do not require subsurface construction, excavation or other disturbance (such as a bus shelter) and similar uses, then 3D plans normally would not be required. The FHWA added the language “if required by FHWA or the Grantee” to add clarity. The FHWA does not believe that a definition of 3D plans is necessary because, as used in this rule, there is no one single standard that may be used. The FHWA expects that when 3D presentations are necessary, that the 3D plans will adequately depict the proposed use and its impacts.
Comments on Disposal of Excess Property—§ 710.409.
The Colorado DOT and PennDOT were concerned that a request for disposal must comply with some of the criteria required for ROW use agreements. They reasoned that if a property is determined to be excess, then it should be subject only to the requirement that the SDOT receive fair market value for its disposal and that any potential use of the property need not be considered.
The FHWA has reviewed the regulation and agrees that applying all of the requirements and criteria applicable to a lease or other temporary ROW use agreement to a disposal action is overly broad. The FHWA has revised this section and eliminated the specific references to requirements in §§ 710. 403 and 710.405, which are focused on ROW use agreement actions.
Comment on Property Acquisition Alternatives—§ 710.501.
The CDOT noted that the proposed regulations provide a process for approving early acquisitions which gives an additional tool to deliver projects efficiently and effectively.
The FHWA appreciates the comment. No changes were made to this section of the regulation.
Comment on State Funded Early Acquisition Eligible for Future Credit—§ 710.501(c).
The ITD asked if a SDOT can acquire property using State funds and be credited toward its non-Federal share of the project cost up to the maximum limit of its financial involvement.
The FHWA has not included a change in the final rule to allow for what amounts to a method to apply excess credit to another project. The allowance for a credit continues to be a credit for costs of acquiring property for the project as part of the agency’s non-Federal share. Any costs which exceed the non-Federal share for that project are not creditable in most instances.
Comment on Timing of FHWA Concurrence—§ 710.501(c)(5).
The PennDOT asked for clarification on “the timing of obtaining FHWA concurrence during the project development process for early acquisitions.”
The FHWA emphasizes that State funded early acquisition continues to be an at-risk acquisition for the SDOT. To be eligible for Federal-aid participation, the concurrence provided for in this section requires that the environmental review process for the transportation project be completed and that each of the six criteria in this section are determined to have been met. Each SDOT should specify the process and timing for seeking a credit in its ROW manual. A ROW certification would be one appropriate milestone for requesting a credit; other milestones might include when the project reaches a specified percentage of project completion or when the project is determined to have been completed.
Comments on State Funded Early Acquisition Eligible for Future Reimbursement—§ 710.501(d).
The PennDOT commented that it would like the regulation to list the terms and conditions of 23 U.S.C. 108(c)(3) rather than just reference the statute.
The FHWA agrees that this change will make it easier for the user of this regulation and has added the terms and conditions found at 23 U.S.C. 108(c)(3) to the regulatory text.
The WisDOT commented that it has concerns about the requirement that a State must have a mandatory comprehensive and coordinated land use, environment, and transportation planning process under State law and that the acquisition be certified by the Governor. The WisDOT was also concerned about meeting the requirements of statewide and nonmetropolitan planning as a part of this requirement. Further, WisDOT asked for clarification on meeting the requirements of this part and inquired about the possibility of getting a waiver for this requirement.
The FHWA does not have legal authority to issue a waiver for this statutory requirement. However, FHWA is completing a research project to examine several States that have processes that may be consistent with these requirements. The FHWA will share the research findings on its Web site as soon as the final report is completed. The FHWA believes that providing examples of processes will give interested SDOTs a starting point in determining if they have a process that meets the requirements for statewide and nonmetropolitan planning contained in 23 U.S.C. 108(c)(3).
Comments on Federally-Funded Early Acquisition—§ 710.501(e).
Several commenters (AASHTO, GDOT, CDOT, ITD, and WisDOT) provided comments on various parts of this section. The AASHTO and GDOT both welcomed the new authority for federally funded early acquisitions, but expressed concerns that procedural and documentation requirements could deter States from taking advantage of this new flexibility. They encouraged FHWA to implement this new authority in a way that avoids unnecessary administrative burdens and provides a high degree of consistency and predictability in FHWA’s decisions.
The FHWA agrees that it is important to ensure that unnecessary administrative burdens do not deter the implementation of these flexibilities. The FHWA believes that SDOTs can develop and provide the required documents with the least administrative burden that is practical. The FHWA will continue to work with the SDOTs to ensure that FHWA’s decisionmaking process is transparent, efficient, and reasonable.
The AASHTO and the CDOT commented that the factors listed in the preamble which address what FHWA may consider when deciding whether to approve a federally funded early acquisition are above and beyond the list of factors that must be covered in the State’s certification under 23 CFR 710.501(e)(1) through (e)(4).
As noted in the NPRM, FHWA does not believe that it is practical to try to capture in the regulation every scenario for complying with the requirements in 23 U.S.C. 108(d)(3)(B). The preamble discussion did not create a list of factors that will be applied to every decision, but rather factors that it may consider and that SDOTs should also consider when carrying out federally funded early acquisition. The FHWA noted in the preamble that it expects to wait until it has more experience administering the certification process before considering issuing implementation guidance. This continues to be FHWA’s position. In the interim, FHWA will work directly with SDOTs considering a federally funded early acquisition to address any questions that may arise about the discretionary factors to ensure that SDOTs can use these flexibilities.
Comment on Allowing 4(f) Property Acquisition—§ 710.501(e)(2)(ii).
The AASHTO, CDOT, and GDOT requested that FHWA reconsider the requirement in § 710.501(e)(2)(ii) that federally funded early acquisitions may “not involve land described in 23 U.S.C. 138.” Such lands are commonly known as “Section 4(f) property,” which is defined in 23 CFR 774.17 as “publicly owned land of a public park, recreation area, or wildlife and waterfowl refuge of national, State, or local significance, or land of an historic site of national, State, or local significance.” The commenters suggested a more flexible approach, such as one that would allow for a case-by-case determination regarding early acquisition for Section 4(f) properties. Specifically, they suggested that the involvement of Section 4(f) resources could be listed as one of the factors that the FHWA considers in deciding whether to approve Federal funds for an early acquisition. They felt that this flexibility may be especially helpful when the Section 4(f) status of a property is uncertain, as would be the case with some historic properties.
The FHWA revised the final rule to provide additional flexibility by clarifying that the acquisition of a Section 4(f) property itself is prohibited but that all acquisitions that may involve a Section 4(f) property are not expressly prohibited. For example, if all of the other provisions in § 710.501(e) are met, a property that is adjacent to a Section 4(f) property could be acquired. Section 701.501(e)(2)(i) now states that the acquisition of the real property interest does not require FHWA approval under 23 CFR 774.3.
The FHWA did not adopt the request for case-by-case exceptions for early acquisition of a Section 4(f) property because the Section 4(f) regulation does not include such an exception. In addition, the regulations implementing Section 106 of the National Historic Preservation Act, 36 CFR Part 800, do not contain an exception from consultation when the eligibility of a property is undetermined. However, as noted in the NPRM, the option of acquiring a Section 4(f) property early by using hardship acquisition and protective buying remains a viable alternative for SDOTs should the need arise. This alternative is more appropriate because a hardship acquisition or protective buying occurs when the proposed transportation project, for which the property would be needed, has progressed into the NEPA phase when more specific information is available about the location, design, alternatives, and other factors. This information is necessary to determine what the requisite Section 4(f) determination and Section 106 consultation requirements are. Therefore, hardship acquisition and protective buying continue to be the only options that FHWA believes are appropriate for early Section 4(f) property acquisition.
Comments on Acquiring by Negotiation—§ 710.501(e)(2)(viii).
The WisDOT commented that it supports allowing a “friendly condemnation” to clear or quiet the title for real property interests acquired as part of a federally funded early acquisition project. In part of its comment, it referenced complex acquisitions as being a determining factor in the use of condemnation to clear title.
The FHWA is not proposing that a complex acquisition would necessarily be a requirement for using condemnation to clear title, but rather condemnation to clear title would be used in cases where the property owner and the agency have a binding agreement of sale, but cannot clear title for any number of reasons.
Early Acquisition Project included as a Project in STIP/TIP —§ 710.501(e)(3).
The AASHTO, GDOT, CDOT, and ITD asked about the definition of an early acquisition project in this part of the regulation and asked FHWA to clarify in either the preamble or rule that compliance with this requirement does not necessarily mean that each individual acquisition be included as a separate project in the Transportation Improvement Plan(TIP). They requested that the final rule clarify that a package of related acquisitions - e.g., all acquisitions for a project or portion of a project - can be included as a single line item within a TIP. In addition, ITD asked if there could be a generic project named “early acquisition.”
A generic project named “early acquisition” would not meet the requirements. This final rule includes language which in part requires that each federally funded early acquisition project must be added as a separate project in the TIP or State Transportation Improvement Plan (STIP). Since a number of conditions and issues surround each early acquisition project, transparency is essential to provide proper management of these projects.
The AASHTO, CDOT, and GDOT correctly note that “…all acquisitions for a project or portion of a project can be included as a single line item within a TIP.” The NPRM and this final rule include a definition of early acquisition project which states: “Early Acquisition Project means a project for the acquisition of real property interests prior to the completion of the environmental review process for the transportation project into which the acquired property will be incorporated, as authorized under 23 U.S.C. 108 and implemented under § 710.501. It may consist of the acquisition of real property interests in a specific parcel, a portion of a transportation corridor, or an entire transportation corridor.” In most cases, acquisition of parcels unrelated to a specific project or portion of a project does not meet the definition or requirements of an early acquisition project in this regulation. A generic project or a statewide project for all early acquisitions would not, therefore, meet the requirements of this final rule.
Comments on Prohibited Activity—§ 710.501(f).
The AASHTO, GDOT, ITD, and WisDOT commented on the prohibited activities described in this part. The AASHTO and Georgia DOT agreed with the language stating that a State may carry out limited clearing and demolition activity, if the activities are necessary to protect the public health or safety and are considered during the environmental review of the Early Acquisition Project. They felt that this language helps to clarify that the statute’s prohibition against “developing” property acquired as part of an early acquisition project does not prevent the State from taking actions necessary to protect the public health and safety.
The ITD asked if their assumption is correct that a SDOT can take ownership of real property before the completion of the NEPA process for the transportation project but not allow a change to the property’s use or configuration in any way that might impact the NEPA process (except for the certain health and welfare reasons).
The FHWA agrees that ITD’s understanding is correct. The NPRM preamble provided a detailed discussion of prohibited activities which, in part, states that this new acquisition authority is premised on a “buy and hold” concept, in which the acquisition activity results only in a change in ownership of the real property interest, but otherwise typically maintains the pre-acquisition uses and conditions. The State agency, as part of the environmental review of the federally assisted early acquisition project, must include an appropriate analysis of the impacts of the acquisition, including relocation, and any interim activity planned for the real property interests until the property is used for the proposed transportation project (such as property maintenance to maintain the existing condition of the property, or demolition for public safety reasons). This analysis will be used to determine whether the early acquisition project's impacts are acceptable.
The FHWA believes this “buy and hold” approach is consistent with the limitation in 23 U.S.C. 108(d)(6). That provision does not allow real property interests acquired as part of a federally assisted early acquired project to be developed in anticipation of the proposed transportation project until the NEPA review process for the proposed transportation project is concluded. The language in the final rule provides direction on what “developed in anticipation of a project” means. Prohibited activities include demolition, site preparation, clearing and grubbing, and construction that may have an adverse environmental impact or cause a change in the use or character of the real property. There may be very limited instances in which development activities may be appropriate.
The WisDOT was concerned that it would not be allowed to perform demolition or site preparation on properties it purchases as an early acquisition with Federal funding until the environmental review is done. It noted that depending on how long the review takes, there are concerns with vandalism on the property and the cost of managing (maintenance, snow removal, grass cutting, etc.) the property until such time the environmental review is finished. It stated that certain activities are allowed to protect public safety, but that it would need guidance and clarification on that.
The FHWA agrees that there will be costs associated with managing and maintaining real property interests acquired as a federally funded early acquisition. The WisDOT is also correct that certain activities necessary to protect the public health or safety which were considered during the environmental review for the early acquisition project can be carried out. The FHWA will consider developing additional guidance to further answer questions that may arise about prohibited activities for real property interest acquired as part of a federally funded early acquisition project.
Comment on Reimbursement—§ 710.501(g).
The ITD commented that the definition of “offset” in this section was not clear and asked if “offset” and “local match” are the same, and requested clarification on both the intent and purpose for this section.
Local match and offset are not the same concepts. Local match allows for a credit based on contributions made towards the local share of the cost of a project. As explained in the NPRM, this section requires that when Federal-aid reimbursement has been made for early acquired real property, the real property must be incorporated into a project eligible for surface transportation funds within the 20-year time period allowed by 23 U.S.C. 108(a)(2). If the State agency does not meet this requirement, FHWA will offset the amount reimbursed against funds apportioned to the State. Offset in this context means a reduction in the States apportionment of title 23 funds. However, a local match refers to the Federal matching requirement on federally funded or assisted project or program funds—i.e. the portion of the total project cost that a State or local is required to contribute is commonly called the local match. The use of FHWA funds on a project typically requires a 10 percent or 20 percent local match of funds.
Comment on Relocation Assistance Eligibility—§ 710.501(h).
The AASHTO and GDOT commented that the language in the rule helps to ensure that relocation assistance can be provided at the time early acquisition occurs and need not wait until project construction.
The FHWA appreciates the comment and believes it is important to reiterate that the purpose of this provision is to establish relocation eligibility when there is a binding written agreement between the acquiring agency and the property owner for the early acquisition of the real property interests.
Comments on Protective Buying and Hardship Acquisition—§ 710.503.
Two SDOTs and one private citizen commented on this section of the regulation. The ITD commented that the definition of “project” in this section is not clear. They requested clarification of what would need to be in the TIP or whether the early acquisition would need to be in the TIP itself.
The FHWA agrees that the term “transportation project” should be used in this section to clarify which activities the regulation is referring and what must be included in the TIP. The FHWA has revised the regulatory text accordingly. Transportation project as used in this regulation is defined in part as excluding early acquisition projects. In order to request reimbursement of hardship or protective buying costs (referred to as early acquisitions in the question) one of the requirements for this part is that the transportation project be included in the currently approved STIP. Hardship and Protective Buying is not early acquisition as used in this regulation. One private citizen requested that the use of option purchase contracts be added in addition to the protective buying and hardship acquisition approaches. The private citizen believes that this would be consistent with the intent of changes in MAP-21 related to advocating enhanced program delivery initiatives.
The FHWA recognizes the need to enhance program delivery initiatives as established by the expanded definition of real property interests. The expanded definition includes the use of option purchase contracts as a tool to acquire or preserve an interest in land. This rule does allow for the purchase of real property interests which by definition at § 710.105(b) does include options. Therefore, options could be used as a tool to acquire or preserve an interest in land when necessary.
The WisDOT commented that it was pleased that there was a possibility for reimbursement of funds spent on early acquisitions, but were generally concerned about the scope of the requirements of this part and the early acquisition part.
The FHWA believes that this rule balances the need to provide specific requirements for reimbursement against the need to provide flexibility. The FHWA is planning the development of an implementation guide and Frequently Asked Questions, which will address these two topics in more detail.
Comments on Real Property Donations—§ 710.505.
The ITD and NYSDOT provided comments on this section. The ITD asked about a timeframe for determining fair market value, citing concerns about frequent changes in the real estate market and project influences on value. Further, it requested that FHWA establish a timeframe for determining fair market value in the regulation.
The FHWA believes the regulatory language in 23 CFR 710.507(b) addresses both questions. Specifically, the language requires that the credit to the State’s matching share for donated property be based on fair market value established on the earlier date, either the date on which the donation becomes effective, or the date on which equitable title to the property vests in the State. Also, the fair market value may not include increases or decreases in value caused by the project.
The NYSDOT commented that it would like language added to § 710.505(a) to ensure that it’s clear that Federal and State requirements on property donation must be followed.
The FHWA added “subject to applicable state laws” to this section of the regulatory text. However, FHWA cannot give a blanket approval of State laws, rules, and regulations since there may be some that conflict with Federal law.
Comment on State and Local Contributions—§ 710.507.
The NYSDOT raised a question about whether credits for State and local contribution under this regulation would be subject to different rules. It believes the NPRM supports this interpretation because the NPRM stated in part that the provisions for credit for real property interests contributed to a project are not the same for State and local governments. It recommends that the wording in § 710.507 be changed to say that the real property can be used as a credit toward “the State’s or local government’s matching share.”
The FHWA reviewed the NPRM and does not agree that the NPRM preamble creates separate standards for State and local credit. The FHWA notes that the NPRM stated that, “The provisions governing credit for real property interests contributed to a project are now the same for State and local governments.” The FHWA agrees that a clarification describing to whom these credit provisions apply would improve the regulation. The FHWA changed the wording in § 710.507 from “State” to “Grantee or Subgrantee” to more clearly describe the party receiving a credit for the State or local government contribution.
Comment on Functional Replacement—§ 710.509.
The NYSDOT asked whether local public agencies would be eligible for providing functional replacements if they acquired real property interests from a publicly owned facility unless a State law prohibits it, and whether the SDOT could decide not to provide a functional replacement.
The FHWA holds SDOTs responsible for ensuring that activities by subgrantees (local public agencies in the context of this question), and contractors on Federal-aid projects are carried out in compliance with State and Federal legal requirements. Because SDOTs are responsible for oversight and stewardship of activities carried out by subgrantees (local public agencies in the context of this question), each SDOTs ROW manual must clearly detail the process for considering requests for functional replacements including whether State law, regulation, or policy allow local public agencies to carry out functional replacements.
Comment on Transportation Alternatives (TA)—§ 710.511.
On December 4, 2015, the FAST Act was signed into law. The FAST Act eliminated the MAP-21 Transportation Alternatives Program (TAP) and replaced it with a set-aside of Surface Transportation Block Grant (STBG) program funding for transportation alternatives (TA). As a result of these changes, references to the program name in this section of the final rule have been updated so that they are consistent with the FAST Act.
The AASHTO commented on Transportation Alternatives that “States support the provision of having all property subject to the same requirements.”
The FHWA agrees that properties on TA projects should be subject to the Uniform Act and Federal-aid highway requirements under title 23.
Comment on Federal Land Transfers—§ 710.601(b) and (e).
The FHWA has made a clarification to § 710.601(b) by adding the phrase (“SDOTs and their Nominees”) to the end of this section. The FHWA believes that this will addresses comments which, in part, asked for clarification regarding which entities the regulation was referring to in this section.
The AASHTO, CDOT, PennDOT, and SDDOT all requested that a Federal land management agency (FLMA) should have a maximum period of 4 months, or less, in order to respond to a Federal land transfer request and ensure timely ROW clearance and project delivery.
The FHWA appreciates the importance of timely project delivery while allowing sufficient time for a FLMA to review the request and determine conditions necessary for the adequate protection and utilization of the reserve; or to determine whether the proposed appropriation is contrary to the public interest or inconsistent with the reserved purposes. The FHWA is unable to make the requested change because 23 U.S.C. 317(b) requires 4 months for the FMLA to process the Federal land transfer request. The FHWA believes that the 4-month timeframe is sufficient for the FLMA’s review of the request.
Comment on Direct Federal Acquisition—§ 710.603(a).
The WSDOT commented that it believes the word “not” should be removed from the first sentence of this section. “The provisions of this paragraph may be applied to any real property that is not owned by the United States and is….”
The FHWA does not agree that the word “not” should be removed. The authority provided by this section does not allow for condemnation of Federal Government real estate. The authority and process for acquiring real property owned by the Federal Government is provided in the Federal Land Transfers section at § 710.601. The first sentence has not been modified by deleting the word “not.”
III. Rulemaking Analyses and Notices
The FHWA considered all comments received before the close of business on the extended comment closing date indicated above, and the comments are available for examination in the docket (FHWA-2014-0026) at Regulations.gov. The FHWA also considered comments received after the comment closing date to the extent practicable.
Executive Orders 12866 and 13563 (Regulatory Planning and Review) and DOT Regulatory Policies and Procedures
Executive Orders 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). The FHWA has determined that this action would not be a significant regulatory action under section 3(f) of Executive Order 12866 and would not be significant within the meaning of DOT’s regulatory policies and procedures (44 FR 11032). Executive Order 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. It is anticipated that the economic impact of this rulemaking will be minimal. The changes in this rule are requirements mandated by MAP-21 which add new authorities for early acquisition of property to part 710, and clarify the Federal-aid eligibility of a broad range of real property interests that constitute less than full fee ownership. This final rule also streamlines program requirements, clarifies the Federal-State partnership, and carries out a comprehensive update of part 710. Corresponding revisions have been made to related regulations in 23 CFR parts 635 and 810 to help ensure consistency in interpretation of title 23 requirements, and to better align the language of the regulations with current program needs and best practices. This final rule implements changes identified by the public in response to the DOT’s initiative on Implementation of Executive Order 13563, Retrospective Review and Analysis of Existing Rules. The FHWA believes that the streamlining and updating in this final rule will result in a reduction of Federal requirements and will afford the States new flexibilities to more efficiently acquire real property.
The FHWA has had an ongoing dialog with stakeholders and has developed the final rule in a manner that balances stakeholders’ concerns and practical implementation issues to allow SDOTs to utilize the new flexibilities while minimizing their effects on existing requirements and procedures. The FHWA believes that this rule is non-controversial due to the scope and nature of the proposed additions and changes to the regulation.
Regulatory Flexibility Act
In compliance with the Regulatory Flexibility Act (Pub. L. 96-354, 5 U.S.C. §§ 60l-612), FHWA has evaluated the effects of this final rule on small entities and anticipates that this action will not have a significant economic impact on a substantial number of small entities which includes SDOTs, LPAs, and other State governmental agencies.
Unfunded Mandates Reform Act of 1995
This final rule will not impose unfunded mandates as defined by the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4,109 Stat.48). This final rule will not result in the expenditure by State, local, and tribal governments, in the aggregate, or by the private sector, of $148.1 million or more in any one year (2 U.S.C. 1532). Additionally, the definition of “Federal Mandate” in the Unfunded Mandates Reform Act excludes financial assistance of the type in which State, local, or tribal governments have authority to adjust their participation in the program in accordance with changes made in the program by the Federal Government.
Executive Order 13132 (Federalism Assessment)
Executive Order 13132 requires agencies to assure meaningful and timely input by State and local officials in the development of regulatory policies that may have a substantial, direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. This final action has been analyzed in accordance with the principles and criteria contained in Executive Order 13132, and FHWA has determined that this final action does not warrant the preparation of a federalism assessment. The FHWA has also determined that this final action would not preempt any State law or State regulation or affect any State’s ability to discharge traditional State governmental functions.
Executive Order 13175 (Tribal Consultation)
The FHWA has analyzed this action under Executive Order 13175 and believes that this final action does not have substantial direct effects on one or more Indian tribes, does not impose substantial direct compliance costs on tribal governments, and would not preempt tribal law. Therefore, a tribal summary impact statement is not required.
Executive Order 13211 (Energy Effects)
The FHWA has analyzed this action under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. The FHWA has determined that the final rule action is not a significant energy action under that order because it is not likely to have a significant adverse effect on the supply, distribution, or use of energy. Therefore, a Statement of Energy Effects under Executive Order 13211 is not required.
Executive Order 12372 (Intergovernmental Review)
The regulations implementing Executive Order 12372 regarding intergovernmental consultation on Federal programs and activities apply to this program. Local entities should refer to the Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction, for further information.
Paperwork Reduction Act
Under the Paperwork Reduction Act of 1995 (PRA) (44 U.S.C. 3501, et seq.), Federal agencies must obtain approval from the Office of Management and Budget (OMB) for collections of information they conduct, sponsor, or require through regulations. The PRA applies to Federal agencies’ collections of information imposed on 10 or more persons. “Persons” include a State, territorial, tribal, or local government, or branch thereof, or their political subdivisions.
This action is covered by the existing information collection requirements previously approved under OMB Control Number 2125-0586. The existing information collection is set to expire on September 30, 2016. As required by the PRA, any amendments resulting from this final will be incorporated into the existing information collection when it is renewed prior to expiration in September 2016.
Executive Order 12988 (Civil Justice Reform)
This action meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.
Executive Order 12898 (Environmental Justice)
Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, and DOT Order 5610.2(a) (the DOT Order), 91 FR 27534 (May 10, 2012) (available online at www.fhwa.dot.gov/enviornment/environmental_justice/ej_at_dot/order_56102a/index.cfm), require DOT agencies to achieve environmental justice (EJ) as part of their mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects, including interrelated social and economic effects, of their programs, policies, and activities on minority populations and low-income populations in the United States. The DOT Order requires DOT agencies to address compliance with Executive Order 12898 and the DOT Order in all rulemaking activities. In addition, FHWA has issued additional documents relating to administration of Executive Order 12898 and the DOT Order. On June 14, 2012, FHWA issued an update to its EJ order, FHWA Order 6640.23A, FHWA Actions to Address Environmental Justice in Minority Populations and Low Income Populations (the FHWA Order) (available online at www.fhwa.dot.gov/legsregs/directives/orders/664023a.htm).
The FHWA has evaluated this final rule under the Executive Order, the DOT Order, and the FHWA Order. The FHWA has determined that the final rule will not cause disproportionately high and adverse human health and environmental effects on minority or low income populations. This final rule establishes procedures and requirements for grantees and others when acquiring, managing, and disposing of real property interests. The EJ principles, in the context of acquisition, management, and disposition of real property, should be considered during the planning and environmental review processes for the particular proposal. The FHWA will consider EJ when it makes a future funding or other approval decision on a project-level basis.
Executive Order 13045 (Protection of Children)
The FHWA has analyzed this action under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. The FHWA certifies that this final rule will not concern an environmental risk to health or safety that might disproportionately affect children.
Executive Order 12630 (Taking of Private Property)
The FHWA does not anticipate that this final rule would effect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.
National Environmental Policy Act
Agencies are required to adopt implementing procedures for NEPA that establish specific criteria for, and identification of, three classes of actions: those that normally require preparation of an environmental impact statement; those that normally require preparation of an environmental assessment; and those that are categorically excluded from further NEPA review (40 CFR 1507.3(b)). This final rule adopts policies, procedures, and requirements for acquisition, management, and disposal of real property interests for Federal and federally assisted projects carried out under title 23, U.S.C. The final rule has no potential for environmental impacts until the regulations are applied at the project level. The FHWA would have an obligation to evaluate the potential environmental impacts of such a future project-level action if the action constitutes a major Federal action under NEPA.
This action qualifies for categorical exclusions under 23 CFR 771.117(c)(20) (promulgation of rules, regulations, and directives) and § 771.117(c)(1) (activities that do not lead directly to construction). The FHWA has evaluated whether the final rule would involve unusual circumstances or extraordinary circumstances and has determined that this final rule would not involve such circumstances. As a result, FHWA finds that this final rulemaking would not result in significant impacts on the human environment.
Regulation Identification Number
A Regulation Identification Number (RIN) is assigned to each regulatory action listed in the Unified Agenda of Federal Regulations. The Regulatory Information Service Center publishes the Unified Agenda in April and October of each year. The RIN contained in the heading of this document can be used to cross reference this action with the Unified Agenda.
List of Subjects
23 CFR Part 635
Construction and maintenance, Grant programs-transportation, Highways and roads, Reporting and recordkeeping requirements.
23 CFR Part 710
Grant programs-transportation, Highways and roads, Real property acquisition, Reporting and recordkeeping requirements, Rights-of-way.
23 CFR Part 810
Grant programs-transportation, Highways and roads, Mass transportation, Rights-of-way.
Issued on: August 8, 2016.
____________________________
Gregory G. Nadeau
Administrator
In consideration of the foregoing, FHWA amends title 23, Code of Federal Regulations, parts 635, 710, and 810 as follows:
PART 635 --CONSTRUCTION AND MAINTENANCE
1. The authority citation for part 635 continues to read as follows:
Authority: Sec. 1525 of Pub. L. 112-141, Sec. 1503 of Pub. L. 109-59, 119 Stat. 1144; 23 U.S.C. 101 (note), 109, 112, 113, 114, 116, 119, 128, and 315; 31 U.S.C. 6505; 42 U.S.C. 3334, 4601 et seq.; Sec. 1041(a), Pub. L. 102-240, 105 Stat. 1914; 23 CFR 1.32; 49 CFR 1.85(a)(1).
2. Section 635.309 is revised to read as follows:
§ 635.309 Authorization
Authorization to advertise the physical construction for bids or to proceed with force account construction thereof shall normally be issued as soon as, but not until, all of the following conditions have been met:
PART 710 -- RIGHT-OF-WAY AND REAL ESTATE
3. The authority citation for part 710 is revised to read as follows:
Authority: Secs.1302 and 1321, Pub. L. 112-141, 126 Stat. 405. Sec. 1307, Pub. L. 105-178, 112 Stat. 107; 23 U.S.C. 101(a), 107, 108, 111, 114, 133, 142(f), 156, 204, 210, 308, 315, 317, and 323; 42 U.S.C. 2000d et seq., 4633, 4651-4655; 2 CFR 200.311; 49 CFR 1.48(b) and (cc), parts 21 and 24; 23 CFR 1.32.
4. Revise subparts A through F to read as follows:
Subpart A--General
Sec.
710.101 Purpose.
710.103 Applicability.
710.105 Definitions.
Subpart B--Program Administration
710.201 Grantee and subgrantee responsibilities.
710.203 Title 23 funding and reimbursement.
Subpart C--Project Development
710.301 General.
710.303 Project authorization and agreements.
710.305 Acquisition.
710.307 Construction advertising.
710.309 Design-build projects.
Subpart D--Real Property Management
710.401 General.
710.403 Management.
710.405 ROW use agreements.
710.407 [Reserved]
710.409 Disposal of excess real property.
Subpart E--Property Acquisition Alternatives
710.501 Early acquisition.
710.503 Protective buying and hardship acquisition.
710.505 Real property donations.
710.507 State and local contributions.
710.509 Functional replacement of real property in public ownership.
710.511 Transportation Alternatives.
Subpart F--Federal Assistance Program
710.601 Federal land transfers.
710.603 Direct Federal acquisition.
Subpart A—General
§ 710.101 Purpose.
The primary purpose of the requirements in this part is to ensure the prudent use of Federal funds under title 23, United States Code, in the acquisition, management, and disposal of real property. In addition to the requirements of this part, other real property related provisions apply and are found at 49 CFR part 24.
§ 710.103 Applicability.
§ 710.105 Definitions.
Access rights mean the right of ingress to and egress from a property to a public way.
Acquiring agency means a State agency, other entity, or person acquiring real property for title 23, United States Code, purposes. When an acquiring agency acquires real property interests that will be incorporated into a project eligible for title 23 grant funds, the acquiring agency must comply with Federal real estate and ROW requirements applicable to the grant.
Acquisition means activities to obtain an interest in, and possession of, real property.
Damages means the loss in the value attributable to remainder property due to the severance or consequential damages, as limited by State law, that arise when only part of an owner's real property is acquired.
Disposal means the transfer by sale or other conveyance of permanent rights in excess real property, when the real property interest is not currently or in the foreseeable future needed for highway ROW or other uses eligible for funding under title 23 of the United States Code. A disposal must meet the requirements contained in § 710.403(b) of this part. The term “disposal” includes actions by a grantee, or its subgrantees, in the nature of relinquishment, abandonment, vacation, discontinuance, and disclaimer of real property or any rights therein.
Donation means the voluntary transfer of privately owned real property, by a property owner who has been informed in writing by the acquiring agency of rights and benefits available to owners under the Uniform Act and this section, for the benefit of a public transportation project without compensation or with compensation at less than fair market value.
Early acquisition means acquisition of real property interests by an acquiring agency prior to completion of the environmental review process for a proposed transportation project, as provided under 23 CFR 710.501 and 23 U.S.C. 108.
Early Acquisition Project means a project for the acquisition of real property interests prior to the completion of the environmental review process for the transportation project into which the acquired property will be incorporated, as authorized under 23 U.S.C. 108 and implemented under § 710.501 of this part. It may consist of the acquisition of real property interests in a specific parcel, a portion of a transportation corridor, or an entire transportation corridor.
Easement means an interest in real property that conveys a right to use or control a portion of an owner's property or a portion of an owner's rights in the property either temporarily or permanently.
Excess real property means a real property interest not needed currently or in the foreseeable future for transportation purposes or other uses eligible for funding under title 23, United States Code.
Federal-aid project means a project funded in whole or in part under, or requiring an FHWA approval pursuant to provisions in chapter 1 of title 23, United States Code.
Federally assisted means a project or program that receives grant funds under title 23, United States Code.
Grantee means the party that is the direct recipient of title 23 funds and is accountable to FHWA for the use of the funds and for compliance with applicable Federal requirements.
Mitigation property means real property interests acquired to mitigate for impacts of a project eligible for funding under title 23.
Option means the purchase of a right to acquire real property within an agreed-to period of time for an agreed-to amount of compensation or through an agreed-to method by which compensation will be calculated.
Person means any individual, family, partnership, corporation, or association.
Real Estate Acquisition Management Plan (RAMP) means a written document that details how a non-State department of transportation grantee, subgrantee, or design-build contractor will administer the title 23 ROW and real estate requirements for its project or program of projects. The document must be approved by the SDOT, or by the funding agency in the case of a non-SDOT grantee, before any acquisition work may begin. It must lay out in detail how the acquisition and relocation assistance programs will be accomplished and any anticipated issues that may arise during the process. If relocations are reasonably expected as part of the title 23 projects or program, the Real Estate Acquisition Management Plan (RAMP) must address relocation assistance and related procedures.
Real property or real property interest means any interest in land and any improvements thereto, including fee and less-than-fee interests such as: temporary and permanent easements, air or access rights, access control, options, and other contractual rights to acquire an interest in land, rights to control use or development, leases, and licenses, and any other similar action to acquire or preserve ROW for a transportation facility. As used in this part, the terms “real property” and “real property interest” are synonymous unless otherwise specified.
Relinquishment means the conveyance of a portion of a highway ROW or facility by a grantee under title 23, United States Code, or its subgrantee, to another government agency for continued transportation use. (See part 620, subpart B of this chapter.)
Right-of-way (ROW) means real property and rights therein obtained for the construction, operation, maintenance, or mitigation of a transportation or related facility funded under title 23, United States Code.
ROW manual means an operations manual that establishes a grantee’s acquisition, valuation, relocation, and property management and disposal requirements and procedures, and has been approved in accordance with § 710.201(c).
ROW use agreement means real property interests, defined by an agreement, as evidenced by instruments such as a lease, license, or permit, for use of real property interests for non-highway purposes where the use is in the public interest, consistent with the continued operation, maintenance, and safety of the facility, and such use will not impair the highway or interfere with the free and safe flow of traffic (see also 23 CFR 1.23). These rights may be granted only for a specified period of time because the real property interest may be needed in the future for highway purposes or other purposes eligible for funding under title 23.
Settlement means the result of negotiations based on fair market value in which the amount of just compensation is agreed upon for the purchase of real property or an interest therein. This term includes the following:
State agency means: a department, agency, or instrumentality of a State or of a political subdivision of a State; any department, agency, or instrumentality of two or more States or of two or more political subdivisions of a State or States; or any person who has the authority to acquire property by eminent domain, for public purposes, under State law.
State department of transportation (SDOT) means the State highway department, transportation department, or other State transportation agency or commission to which title 23, United States Code, funds are apportioned.
Stewardship/Oversight Agreement means the written agreement between the SDOT and FHWA that defines the respective roles and responsibilities of FHWA and the State for carrying out certain project review, approval, and oversight responsibilities under title 23, including those activities specified by 23 U.S.C. 106(c)(3).
Subgrantee means a government agency or legal entity that enters into an agreement with a grantee to carry out part or all of the activity funded by title 23 grant funds. A subgrantee is accountable to the grantee for the use of the funds and for compliance with applicable Federal requirements.
Temporary development restriction means the purchase of a right to temporarily control or restrict development or redevelopment of real property. This right is for an agreed to time period, defines specifically what is restricted or controlled, and is for an agreed to amount of compensation.
Transportation project means any highway project, public transportation capital project, multimodal project, or other project that requires the approval of the Secretary. As used in this part, the term “transportation project” does not include an Early Acquisition Project as defined in this section.
Uneconomic remnant means a remainder property which the acquiring agency has determined has little or no utility or value to the owner.
Uniform Act means the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (Public Law 91–646, 84 Stat. 1894; primarily codified in 42 U.S.C. 4601 et seq.), and the implementing regulations at 49 CFR part 24.
Subpart B - Program Administration
§ 710.201 Grantee and subgrantee responsibilities.
§ 710.203 Title 23 funding and reimbursement.
Subpart C - Project Development
§ 710.301 General.
The project development process typically follows a sequence of actions and approvals in order to qualify for funding. The key steps in this process typically are planning, environmental review, project agreement/authorization, acquisition, construction advertising, and construction.
§ 710.303 Project authorization and agreements.
As a condition of Federal funding under title 23, the grantee shall obtain FHWA authorization in writing or electronically before proceeding with any real property acquisition using title 23 funds, including early acquisitions under § 710.501(e) and hardship acquisition and protective buying under § 710.503. For projects funded under chapter 1, title 23, United States Code, the grantee must prepare a project agreement in accordance with 23 CFR part 630, subpart A. Authorizations and agreements shall be based on an acceptable estimate for the cost of acquisition.
§ 710.305 Acquisition.
§ 710.307 Construction advertising.
§ 710.309 Design-build projects.
Subpart D - Real Property Management
§ 710.401 General.
This subpart describes the grantee’s responsibilities to control the use of real property acquired for a project in which Federal funds participated in any phase of the project. The grantee shall specify in its approved ROW manual or RAMP, the procedures for the maintenance, ROW use agreements, and disposal of real property interests acquired with title 23 funds. The grantee shall ensure that subgrantees, including local agencies, follow Federal requirements and approved ROW procedures as provided in § 710.201(c) and (d).
§ 710.403 Management.
§ 710.405 ROW use agreements.
§ 710.407 [Reserved]
§ 710.409 Disposal of excess real property.
Subpart E—Property Acquisition Alternatives
§ 710.501 Early acquisition.
§ 710.503 Protective buying and hardship acquisition.
§ 710.505 Real property donations.
§ 710.507 State and local contributions.
§ 710.509 Functional replacement of real property in public ownership.
§ 710.511 Transportation Alternatives.
Subpart F—Federal Assistance Programs
§ 710.601 Federal land transfers
§ 710.603 Direct Federal acquisition.
5. Revise §710.703(f) to read as follows:
§710.703 Definitions.
* * * * *
(f) Highway agency in this subpart means any SDOT or other public authority with jurisdiction over a federally funded highway.
* * * * *
PART 810 – MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS
6. The authority citation for part 810 continues to read as follows:
Authority: 23 U.S.C. 137, 142, 149 and 315; sec. 4 of Pub. L. 97-134, 95 Stat. 1699; secs. 118, 120, and 163 of Pub. L. 97-424, 96 Stat. 2097; 49 CFR 1.48(b) and 1.51(f).
7. Revise § 810.212 to read as follows:
§ 810.212 Use without charge.
The use and occupancy of the lands made available by the State to the publicly owned transit authority may be without charge. Costs incidental to making the lands available for mass transit shall be borne by the publicly owned mass transit authority.