Significant Progress Determination Summary Table - Massachusetts

FHWA determines significant progress for the NHPP and NHFP measures after the mid-point and end of each performance period. A State has met or made significant progress toward target achievement if “actual” condition/performance is equal to or better than the established two-year target or “actual” condition/performance is better than baseline performance 23 CFR 490.109(e). As provided in 23 CFR 490.107(b)(2)(ii)(A), baseline condition/performance is derived from the latest data collected through the beginning date of the performance period. FHWA will classify the assessment of progress toward the achievement of an individual 2-year or 4-year target as “progress not determined” if a State provides the extenuating circumstance information required in 23 CFR 490.109(e)(5), and FHWA accepts the information.
This table summarizes FHWA’s most recent determination for all NHPP and NHFP measures.

Massachusetts 2020 Mid Performance Period Significant Progress Determination Results
Measure Area Measures Baseline Target Actual Better than Baseline? Achieved Target? Made Significant Progress? Consequences [23 CFR 490.109(f)]
The condition of pavements on the National Highway System (NHS) (excluding the Interstate) Percentage of pavements of the non-Interstate NHS in Good condition Based only on IRI 32.9 30 34.1 Yes Yes Yes Additional reporting
Based on Full Distress + IRI --- --- --- --- ---
Percentage of pavements of the non-Interstate NHS in Poor condition Based only on IRI 31.4 30 31.4 No No No
Based on Full Distress + IRI --- --- --- --- ---
The condition of bridges on the National Highway System Percentage of NHS bridges classified as in Good condition 15.1 15 15.6 Yes Yes Yes Additional reporting
Percentage of NHS bridges classified as in Poor condition 13.1 13 13.5 No No No
The performance of the Interstate System Interstate Travel Time Reliability measure 70 68 69.1 No Yes Yes None
Freight movement on the Interstate System Freight Reliability measure 1.84 1.85 1.86 No No No Additional reporting
Updated: 11/30/2022
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000