PBES Innovative Projects
Beaufort and Morehead Railroad Trestle Bridge |
| Location | Over Newport River between Morehead City and Radio Island |
| State | NC |
| Completion Date | 1999 |
| Contact Person | John Frye P.E. Project Group Engineer Structure Design Unit North Carolina Department of Transportation Phone: (919) 250-4049 Email: jfrye@dot.state.nc.us |
| Description | A design-build project consisting of ballasted, precast prestressed T-girders spanning transverse, precast reinforced concrete caps, supported on composite piles (24-inch steel pie piles protected by 36-inch concrete cylinder pile sleeves), this project replaced 2,298 feet of trestle-span approaches on existing alignment on each side of a single-leaf rolling bascule span. Trestle spans were replaced during weekly track outages of 4-day duration. The bridge was designed and constructed to AREMA standards and to meet NCDOT's highly-corrosive coastal environment criteria. All environmental documentation and permits, design, construction, and construction engineering and inspection were done by the design-build team. |
| Photo |  |
| Prefabricated Elements | Bent caps |
| Other Keywords | Steel pipe piles, concrete cylinder piles, prestressed girders,precast prestressed cylinder piles,prestressed 'tee' girders,speed of construction |
| Advantages | Speed of construction: The trestle was replaced while serving rail traffic, with individual spans replaced between scheduled trains, Minimized traffic disruption, Improved constructibility. |
| Contract Elements | Lump-sum design-build project |
| Related Document 1 | Photographs (PDF, 0.7 mb) HTML Version |
| Photo Credits | North Carolina Department of Transportation |
|