DescriptionAfter the contract had been let and work started, it became clear that formwork for the proposed cast-in-place cap would interfere with traffic and require closing of the ramp for an estimated 7 days. With TxDOT's approval, the contractor instead precast the straddle bent cap at the work site and lifted it into position. When it was in place, workers post-tensioned bars and grouted the cap-to-column connections. The time necessary for closure of the ramp was reduced from an estimated 7 days to 4 hours.
PhotoPhoto of construction on US 290 Ramp G. Click image for larger view
Prefabricated ElementsBent caps
Other KeywordsPrecast bent cap,precast bent caps
AdvantagesMinimized traffic disruption: The time necessary for closure of the ramp was reduced from an estimated 7 days to 4 hours.
Photo CreditsTexas Department of Transportation

Events

More Information

Contact

Reggie Holt
Office of Bridge Technology
202-366-4596
E-mail Reggie

 
 
This page last modified on 05/12/08
 

FHWA
United States Department of Transportation - Federal Highway Administration