Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

FHWA > Every Day Counts > Accelerating Technology > Prefabricated Bridge Elements and Systems > Innovative Projects > All Projects

Prefabricated Bridge Elements and Systems

Main Street over Metro North Railroad

LocationTuckahoe
StateNY
Completion Date2000
Contact PersonGeorge A. Christian P.E.
Acting Director
Structures Design and Construction Division
New York State Department of Transportation
State Campus Building 5, 6th Floor
1220 Washington Avenue
Albany NY 12232
Phone: (518) 457-6827
Fax: (518) 485-7826
Email: Gchristian@gw.dot.state.ny.us
DescriptionReplacement of a through-girder bridge over a busy commuter railroad in the village of Tuckahoe presented challenges for NYSDOT: maintaining two way traffic, conducting all work between 2 and 4 AM on weekends to limit disruptions for rail commuters and adjacent stores, maintaining utility lines while relocating them on the new bridge, and raising the railroad vertical clearance five inches without affecting the street profile. NYSDOT chose a commercial system of precast prestressed concrete/steel composite superstructure modules that allowed for smaller beams than conventional construction, which helped attain the increased vertical clearance and had a short installation time.
PhotoMain Street over Metro North Railroad. Click image for larger view.
Prefabricated Elementssuperstructure
Other KeywordsPrecast prestressed concrete and steel composite superstructure units,precast prestressed deck composite units,prefabricated total superstructure,total superstructure prefabrication
AdvantagesImproved constructibility by allowing staged construction over a busy commuter railroad, Minimized traffic disruption.
Photo CreditsNew York State Department of Transportation