I-5/South 38th Street Interchange

LocationTacoma
StateWA
Completion Date2001
Contact PersonJoseph Merth P.E.
Washington State Department of Transportation
Phone: (360) 705-7166
Email: merthjo@wsdot.wa.gov
DescriptionTo reduce construction time and minimize traffic disruption, the Washington State Department of Transportation chose precast stay-in-place deck panels in the design of this two-span, 325-foot replacement bridge over I-5 in Tacoma. The new post-tensioned box girder bridge uses precast tub girder segments. With no need to construct and remove conventional deck forms, lane closures on I-5 were greatly reduced. Leveling screws were used to adjust camber on the 3-1/2-inch-thick precast pretensioned panels, and all 766 panels were placed within a week of limited nighttime I-5 lane closures.
PhotoPhoto of construction of I-5/South 38th Street Interchange bridge. Click image for larger view.
Prefabricated Elementsfull
Other KeywordsPrecast stay-in-place deck panels; precast post-tensioned tub girders,full-depth deck panels
AdvantagesMinimized traffic disruption by reducing construction time.
Photo CreditsWashington State Department of Transportation
Updated: 09/27/2011