Appendix B contains a summary of the construction data available for each project as of the approximate time of this report, which was 1999-2000. Thickness data were from three sources. The first source was the TST_L05B table, which contained the values most representative of the material that was actually placed on the test section and the pre-existing pavement structure. The second was the SPS5_LAYER table, which included thicknesses that should be the same as those provided in the TST_L05B table. However, in most of the data shown, these thicknesses were not the same. The third source was the SPS5_LAYER_ THICKNESS table. These data were obtained from elevation measurements taken on the projects after the placement of each layer of overlay.
| Alabama (1) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 563 | 564 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | ||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | ||
| L05B Thickness | |||||||||||
| AC OVERLAY (mm) | |||||||||||
| MILLING (mm) | |||||||||||
| SPS Construction Thickness | |||||||||||
| AC OVERLAY (mm) | 33 | 102 | 112 | 36 | 76 | 142 | 145 | 81 | 36 | 28 | |
| Rod & Level | |||||||||||
| AC OVERLAY (mm) | 33 | 100 | 110 | 35 | 52 | 123 | 114 | 45 | 30 | ||
| MILLING (mm) | 25 | 18 | 29 | 35 | 36 | ||||||
| Rod & Level Std Dev | |||||||||||
| AC OVERLAY (mm) | 8 | 9 | 10 | 9 | 6 | 7 | 4 | 5 | 7 | ||
| MILLING (mm) | 7 | 7 | 5 | 8 | 6 | ||||||
| Rod & Level Min | |||||||||||
| AC OVERLAY (mm) | 18 | 84 | 89 | 18 | 41 | 104 | 104 | 33 | 15 | ||
| MILLING (mm) | 10 | 3 | 20 | 18 | 18 | ||||||
| Rod & Level Max | |||||||||||
| AC OVERLAY (mm) | 51 | 127 | 137 | 56 | 64 | 137 | 122 | 58 | 51 | ||
| MILLING (mm) | 43 | 30 | 41 | 56 | 48 | ||||||
| MILLING (mm) | 42 | 32 | 23 | 25 | 33 | 30 | |||||
| Lift Thicknessess | |||||||||||
| Maximum Lift Thickness<=75mm | 41 | 64 | 76 | 43 | 64 | 89 | 79 | 56 | 46 | 38 | |
| AC Material Requirements | |||||||||||
| Hveem stability (minimum 37)Air Voids 3-5 % | 3.9 | 4.2 | 3.6 | 3.6 | 3.6 | 3.6 | 4.2 | 4.2 | 3.6 | 3.9 | |
| Virgin Mix | |||||||||||
| Aggregate Pass #4<40% | |||||||||||
| RAP | |||||||||||
| TOTAL AC | |||||||||||
| NEW AC | |||||||||||
| % AC OF SALVAGED MIX | |||||||||||
| % NEW AGG.MATERIAL | |||||||||||
| % RAP | |||||||||||
| New Aggregate | |||||||||||
| Aggregate Pass #4 <40% | |||||||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Arizona (4) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 559 | 560 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| L05B Thickness | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| AC OVERLAY (mm) | 69 | 119 | 122 | 71 | 132 | 173 | 165 | 99 | 152 | 56 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| MILLING (mm) | 23 | 20 | 18 | 23 | 48 | 66 | 69 | 71 | 86 | 23 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| SPS Construction Thickness | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| AC OVERLAY (mm) | 69 | 119 | 122 | 71 | 43 | 104 | 104 | 38 | 76 | 56 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Rod & Level | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| AC OVERLAY (mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| MILLING (mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Rod & Level Std Dev | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| AC OVERLAY (mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| MILLING (mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Rod & Level Min | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| AC OVERLAY (mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| MILLING (mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Rod & Level Max | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| AC OVERLAY (mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| MILLING (mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| MILLING (mm) | 27 | 18 | 27 | 33 | 72 | 69 | 69 | 64 | 99 | 25 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Lift Thicknessess | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Maximum Lift Thickness<=75mm | 64 | 76 | 74 | 74 | 74 | 81 | 76 | 71 | 109 | 66 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| AC Material Requirements | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Hveem stability (minimum 37) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Air Voids 3-5 % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Virgin Mix | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Aggregate Pass #4<40% | 64 | 57 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| RAP | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL AC | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| NEW AC | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| % AC OF SALVAGED MIX | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| % NEW AGG.MATERIAL | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| % RAP | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| New Aggregate | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Aggregate Pass #4 <40% | 53 | 53 | 53 | 53 | 53 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note: The number after the state name is the state’s numeric code in the LTPP date base.
| California (6) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 559 | 560 | 561 | 562 | 563 | 564 | 565 | 566 | 567 | 568 | 569 | 570 | 571 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | ||||||||||||||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | |||||||||||||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | |||||||||||||
| L05B Thickness | ||||||||||||||||||||||
| AC OVERLAY (mm) | 46 | 76 | 166 | 146 | 91 | 109 | 170 | 168 | 112 | 208 | 109 | 107 | 112 | 102 | 109 | 109 | 109 | 102 | 152 | 183 | 183 | 248 |
| MILLING (mm) | 30 | 38 | 36 | 30 | 43 | 48 | 46 | 51 | 76 | 58 | 58 | 58 | 58 | 66 | 58 | 58 | 58 | 58 | 66 | 91 | 91 | |
| SPS Construction Thickness | ||||||||||||||||||||||
| AC OVERLAY (mm) | 46 | 76 | 166 | 145 | 91 | 109 | 170 | 114 | 112 | 152 | 109 | 107 | 107 | 102 | 102 | 109 | 109 | 102 | 152 | 183 | 183 | 244 |
| Rod & Level | ||||||||||||||||||||||
| AC OVERLAY (mm) | ||||||||||||||||||||||
| MILLING (mm) | ||||||||||||||||||||||
| Rod & Level Std Dev | ||||||||||||||||||||||
| AC OVERLAY (mm) | ||||||||||||||||||||||
| MILLING (mm) | ||||||||||||||||||||||
| Rod & Level Min | ||||||||||||||||||||||
| AC OVERLAY (mm) | ||||||||||||||||||||||
| MILLING (mm) | ||||||||||||||||||||||
| Rod & Level Max | ||||||||||||||||||||||
| AC OVERLAY (mm) | ||||||||||||||||||||||
| MILLING (mm) | ||||||||||||||||||||||
| MILLING (mm) | ||||||||||||||||||||||
| Lift Thicknessess | ||||||||||||||||||||||
| Maximum Lift Thickness<=75mm | 64 | 69 | 107 | 102 | 71 | 81 | 69 | 74 | 71 | 122 | 0 | 71 | 71 | 81 | 89 | 74 | 76 | 71 | 157 | 53 | 51 | 48 |
| AC Material Requirements | ||||||||||||||||||||||
| Hveem stability (minimum 37) | ||||||||||||||||||||||
| Air Voids 3-5 % | ||||||||||||||||||||||
| Virgin Mix | ||||||||||||||||||||||
| Aggregate Pass #4<40% | ||||||||||||||||||||||
| RAP | ||||||||||||||||||||||
| TOTAL AC | ||||||||||||||||||||||
| NEW AC | ||||||||||||||||||||||
| % AC OF SALVAGED MIX | ||||||||||||||||||||||
| % NEW AGG.MATERIAL | ||||||||||||||||||||||
| % RAP | ||||||||||||||||||||||
| New Aggregate | ||||||||||||||||||||||
| Aggregate Pass #4 <40% | 48 | 48 | 48 | 48 | ||||||||||||||||||
Note: The number after the state name is the state’s numeric code in the LTPP date base.
| Colorado(8) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 559 | 560 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | ||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | ||
| L05B Thickness | |||||||||||
| AC OVERLAY (mm) | 33 | 97 | 137 | 147 | 81 | 112 | 173 | 201 | 107 | 168 | 155 |
| MILLING (mm) | 0 | 0 | 0 | 0 | 0 | 51 | 51 | 71 | 51 | 0 | 0 |
| SPS Construction Thickness | |||||||||||
| AC OVERLAY (mm) | 33 | 97 | 145 | 147 | 81 | 94 | 175 | 201 | 109 | 175 | 157 |
| Rod & Level | |||||||||||
| AC OVERLAY (mm) | 89 | 135 | 154 | 74 | 65 | 149 | 132 | 65 | 172 | 151 | |
| MILLING (mm) | |||||||||||
| Rod & Level Std Dev | |||||||||||
| AC OVERLAY (mm) | 13 | 18 | 17 | 21 | 28 | 19 | 25 | 16 | 30 | 20 | |
| MILLING (mm) | |||||||||||
| Rod & Level Min | |||||||||||
| AC OVERLAY (mm) | 66 | 97 | 94 | 0 | 0 | 97 | 0 | 20 | 76 | 117 | |
| MILLING (mm) | |||||||||||
| Rod & Level Max | |||||||||||
| AC OVERLAY (mm) | 112 | 196 | 180 | 109 | 102 | 188 | 168 | 97 | 234 | 196 | |
| MILLING (mm) | |||||||||||
| MILLING (mm) | 52 | 52 | 55 | 52 | |||||||
| Lift Thicknessess | |||||||||||
| Maximum Lift Thickness<=75mm | 30 | 79 | 89 | 107 | 74 | 64 | 71 | 84 | 64 | 114 | 64 |
| AC Material Requirements | |||||||||||
| Hveem stability (minimum 37) | |||||||||||
| Air Voids 3-5 % | |||||||||||
| Virgin Mix | |||||||||||
| Aggregate Pass #4<40% | 60 | 62 | |||||||||
| RAP | |||||||||||
| TOTAL AC | |||||||||||
| NEW AC | |||||||||||
| % AC OF SALVAGED MIX | |||||||||||
| % NEW AGG.MATERIAL | |||||||||||
| % RAP | |||||||||||
| New Aggregate | |||||||||||
| Aggregate Pass #4 <40% | 58 | 58 | 58 | 58 | |||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Florida (12) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 560 | 561 | 562 | 563 | 564 | 565 | 566 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | ||||||||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | |||||||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | |||||||
| L05B Thickness | ||||||||||||||||
| AC OVERLAY (mm) | 64 | 127 | 130 | 51 | 76 | 165 | 178 | 107 | ||||||||
| MILLING (mm) | 38 | 36 | 64 | |||||||||||||
| SPS Construction Thickness | ||||||||||||||||
| AC OVERLAY (mm) | 53 | 135 | 122 | 48 | 102 | 168 | 180 | 107 | ||||||||
| Rod & Level | ||||||||||||||||
| AC OVERLAY (mm) | 50 | 134 | 123 | 50 | 65 | 111 | 113 | 65 | ||||||||
| MILLING (mm) | . | . | . | . | 35 | 55 | 67 | 42 | ||||||||
| Rod & Level Std Dev | ||||||||||||||||
| AC OVERLAY (mm) | 9 | 7 | 8 | 4 | 4 | 6 | 7 | 5 | ||||||||
| MILLING (mm) | . | . | . | . | 6 | 5 | 4 | 10 | ||||||||
| Rod & Level Min | ||||||||||||||||
| AC OVERLAY (mm) | 25 | 112 | 102 | 38 | 58 | 102 | 94 | 53 | ||||||||
| MILLING (mm) | . | . | . | . | 20 | 46 | 61 | 20 | ||||||||
| Rod & Level Max | ||||||||||||||||
| AC OVERLAY (mm) | 61 | 150 | 145 | 58 | 74 | 122 | 124 | 71 | ||||||||
| MILLING (mm) | . | . | . | . | 43 | 66 | 76 | 71 | ||||||||
| MILLING (mm) | 22 | 11 | 25 | 69 | 62 | 70 | 72 | |||||||||
| Lift Thicknessess | ||||||||||||||||
| Maximum Lift Thickness =75mm | 38 | 69 | 58 | 38 | 81 | 76 | 84 | 53 | ||||||||
| AC Material Requirements | ||||||||||||||||
| Hveem stability (minimum 37) | ||||||||||||||||
| Air Voids 3-5 % | ||||||||||||||||
| Virgin Mix | ||||||||||||||||
| Aggregate Pass #4<40% | 79 | 60 | 69 | |||||||||||||
| RAP | ||||||||||||||||
| TOTAL AC | ||||||||||||||||
| NEW AC | ||||||||||||||||
| % AC OF SALVAGED MIX | ||||||||||||||||
| % NEW AGG.MATERIAL | ||||||||||||||||
| % RAP | ||||||||||||||||
| New Aggregate | ||||||||||||||||
| Aggregate Pass #4 <40% | 72 | 62 | 62 | 72 | ||||||||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Georgia (13) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 560 | 561 | 562 | 563 | 564 | 565 | 566 | 567 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | ||||||||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | ||||||||
| L05B Thickness | |||||||||||||||||
| AC OVERLAY (mm) | 41 | 130 | 135 | 51 | 107 | 160 | 170 | 97 | 56 | 74 | 89 | 56 | 58 | 127 | 137 | ||
| MILLING (mm) | 30 | 38 | 41 | 46 | 74 | 53 | 53 | 58 | 30 | 20 | 25 | 76 | 58 | 25 | 56 | ||
| SPS Construction Thickness | |||||||||||||||||
| AC OVERLAY (mm) | 23 | 127 | 130 | 41 | 99 | 168 | 175 | 99 | |||||||||
| Rod & Level | |||||||||||||||||
| AC OVERLAY (mm) | 23 | 125 | 128 | 42 | 48 | 119 | 123 | 43 | |||||||||
| MILLING (mm) | |||||||||||||||||
| Rod & Level Std Dev | |||||||||||||||||
| AC OVERLAY (mm) | 8 | 4 | 7 | 9 | 4 | 15 | 5 | 6 | |||||||||
| MILLING (mm) | . | . | . | . | 52 | 47 | 49 | 57 | |||||||||
| Rod & Level Min | |||||||||||||||||
| AC OVERLAY (mm) | 5 | 119 | 119 | 33 | 43 | 109 | 109 | 30 | |||||||||
| MILLING (mm) | . | . | . | . | 7 | 12 | 3 | 6 | |||||||||
| Rod & Level Max | |||||||||||||||||
| AC OVERLAY (mm) | 36 | 132 | 142 | 81 | 58 | 185 | 132 | 51 | |||||||||
| MILLING (mm) | . | . | . | . | 41 | 0 | 41 | 48 | |||||||||
| MILLING (mm) | 18 | 27 | 30 | 61 | 38 | 65 | 41 | ||||||||||
| Lift Thicknessess | |||||||||||||||||
| Maximum Lift Thickness =75mm | 28 | 64 | 58 | 46 | 64 | 114 | 114 | 71 | |||||||||
| AC Material Requirements | |||||||||||||||||
| Hveem stability (minimum 37) | |||||||||||||||||
| Air Voids 3-5 % | |||||||||||||||||
| Virgin Mix | |||||||||||||||||
| Aggregate Pass #4<40% | 64 | 66 | |||||||||||||||
| RAP | |||||||||||||||||
| TOTAL AC | |||||||||||||||||
| NEW AC | |||||||||||||||||
| % AC OF SALVAGED MIX | |||||||||||||||||
| % NEW AGG.MATERIAL | |||||||||||||||||
| % RAP | |||||||||||||||||
| New Aggregate | |||||||||||||||||
| Aggregate Pass #4 <40% | |||||||||||||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Maine(23) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 559 |
|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | ||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | |
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | |
| L05B Thickness | ||||||||||
| AC OVERLAY (mm) | 91 | 140 | 145 | 69 | 104 | 198 | 173 | 97 | ||
| MILLING (mm) | 38 | 43 | 30 | 38 | ||||||
| SPS Construction Thickness | ||||||||||
| AC OVERLAY (mm) | 86 | 142 | 142 | 61 | 102 | 183 | 175 | 94 | ||
| Rod & Level | ||||||||||
| AC OVERLAY (mm) | 91 | 140 | 144 | 69 | 54 | 133 | 121 | 52 | ||
| MILLING (mm) | . | . | . | . | 50 | 57 | 52 | 43 | ||
| Rod & Level Std Dev | ||||||||||
| AC OVERLAY (mm) | 9 | 9 | 10 | 9 | 6 | 6 | 6 | 5 | ||
| MILLING (mm) | . | . | . | . | 7 | 7 | 5 | 6 | ||
| Rod & Level Min | ||||||||||
| AC OVERLAY (mm) | 76 | 122 | 122 | 51 | 41 | 122 | 107 | 36 | ||
| MILLING (mm) | . | . | . | . | 30 | 46 | 41 | 30 | ||
| Rod & Level Max | ||||||||||
| AC OVERLAY (mm) | 114 | 155 | 165 | 84 | 66 | 145 | 140 | 66 | ||
| MILLING (mm) | . | . | . | . | 66 | 76 | 61 | 56 | ||
| MILLING (mm) | 43 | 47 | 37 | 38 | ||||||
| Lift Thicknessess | ||||||||||
| Maximum Lift Thickness<=75mm | 61 | 58 | 58 | 38 | 58 | 89 | 81 | 58 | ||
| AC Material Requirements | ||||||||||
| Hveem stability (minimum 37) | ||||||||||
| Air Voids 3-5 % | ||||||||||
| Virgin Mix | ||||||||||
| Aggregate Pass #4<40% | 45 | 52 | 46 | 52 | 48 | 44 | ||||
| RAP | ||||||||||
| TOTAL AC | ||||||||||
| NEW AC | ||||||||||
| % AC OF SALVAGED MIX | ||||||||||
| % NEW AGG.MATERIAL | ||||||||||
| % RAP | ||||||||||
| New Aggregate | ||||||||||
| Aggregate Pass #4 <40% | 47 | 39 | 39 | 39 | ||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Maryland(24) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 559 | 560 | 561 | 562 | 563 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | ||||||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | |||||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | |||||
| L05B Thickness | ||||||||||||||
| AC OVERLAY (mm) | 53 | 135 | 135 | 53 | 91 | 191 | 168 | 97 | ||||||
| MILLING (mm) | 38 | 36 | 36 | 38 | ||||||||||
| SPS Construction Thickness | ||||||||||||||
| AC OVERLAY (mm) | 53 | 124 | 114 | 51 | 91 | 188 | 140 | 89 | ||||||
| Rod & Level | ||||||||||||||
| AC OVERLAY (mm) | 46 | 124 | 116 | 48 | 55 | 108 | 139 | 45 | ||||||
| MILLING (mm) | 45 | 44 | ||||||||||||
| Rod & Level Std Dev | ||||||||||||||
| AC OVERLAY (mm) | 7 | 8 | 9 | 6 | 5 | 6 | 6 | 4 | ||||||
| MILLING (mm) | 9 | 8 | ||||||||||||
| Rod & Level Min | ||||||||||||||
| AC OVERLAY (mm) | 28 | 109 | 97 | 36 | 46 | 97 | 127 | 33 | ||||||
| MILLING (mm) | 33 | 25 | ||||||||||||
| Rod & Level Max | ||||||||||||||
| AC OVERLAY (mm) | 58 | 140 | 140 | 64 | 66 | 124 | 150 | 51 | ||||||
| MILLING (mm) | 71 | 64 | ||||||||||||
| MILLING (mm) | 39 | 39 | 39 | 39 | ||||||||||
| Lift Thicknessess | ||||||||||||||
| Maximum Lift Thickness<=75mm | 61 | 61 | 66 | 64 | 64 | 64 | 57 | 64 | ||||||
| AC Material Requirements | ||||||||||||||
| Hveem stability (minimum 37) | ||||||||||||||
| Air Voids 3-5 % | ||||||||||||||
| Virgin Mix | ||||||||||||||
| Aggregate Pass #4<40% | 41 | 49 | ||||||||||||
| RAP | ||||||||||||||
| TOTAL AC | ||||||||||||||
| NEW AC | ||||||||||||||
| % AC OF SALVAGED MIX | ||||||||||||||
| % NEW AGG.MATERIAL | ||||||||||||||
| % RAP | ||||||||||||||
| New Aggregate | ||||||||||||||
| Aggregate Pass #4 <40% | ||||||||||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Minnesota (27) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 559 | 560 | 561 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | ||||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | |||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | |||
| L05B Thickness | ||||||||||||
| AC OVERLAY (mm) | 61 | 48 | 142 | |||||||||
| MILLING (mm) | ||||||||||||
| SPS Construction Thickness | ||||||||||||
| AC OVERLAY (mm) | ||||||||||||
| Rod & Level | ||||||||||||
| AC OVERLAY (mm) | ||||||||||||
| MILLING (mm) | ||||||||||||
| Rod & Level Std Dev | ||||||||||||
| AC OVERLAY (mm) | ||||||||||||
| MILLING (mm) | ||||||||||||
| Rod & Level Min | ||||||||||||
| AC OVERLAY (mm) | ||||||||||||
| MILLING (mm) | ||||||||||||
| Rod & Level Max | ||||||||||||
| AC OVERLAY (mm) | ||||||||||||
| MILLING (mm) | ||||||||||||
| MILLING (mm) | ||||||||||||
| Lift Thicknessess | ||||||||||||
| Maximum Lift Thickness<=75mm | ||||||||||||
| AC Material Requirements | ||||||||||||
| Hveem stability (minimum 37) | ||||||||||||
| Air Voids 3-5 % | ||||||||||||
| Virgin Mix | ||||||||||||
| Aggregate Pass #4<40% | ||||||||||||
| RAP | ||||||||||||
| TOTAL AC | ||||||||||||
| NEW AC | ||||||||||||
| % AC OF SALVAGED MIX | ||||||||||||
| % NEW AGG.MATERIAL | ||||||||||||
| % RAP | ||||||||||||
| New Aggregate | ||||||||||||
| Aggregate Pass #4 <40% | ||||||||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Mississippi(28) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 560 | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | ||||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | |||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | |||
| L05B Thickness | ||||||||||||
| AC OVERLAY (mm) | 51 | 117 | 124 | 51 | ||||||||
| MILLING (mm) | 0 | 0 | 0 | 0 | ||||||||
| SPS Construction Thickness | ||||||||||||
| AC OVERLAY (mm) | 51 | 127 | 127 | 51 | 80 | 165 | 165 | 89 | ||||
| Rod & Level | ||||||||||||
| AC OVERLAY (mm) | ||||||||||||
| MILL REPLACEMENT (mm) | ||||||||||||
| Rod & Level Std Dev | ||||||||||||
| AC OVERLAY (mm) | ||||||||||||
| MILL REPLACEMENT (mm) | ||||||||||||
| Rod & Level Min | ||||||||||||
| AC OVERLAY (mm) | ||||||||||||
| MILL REPLACEMENT (mm) | ||||||||||||
| Rod & Level Max | ||||||||||||
| AC OVERLAY (mm) | ||||||||||||
| MILL REPLACEMENT (mm) | ||||||||||||
| MILLING (mm) | 38 | 38 | 38 | 38 | ||||||||
| Lift Thicknessess | ||||||||||||
| Maximum Lift Thickness<=75mm | 56 | 51 | 51 | 51 | 51 | 51 | 51 | 51 | ||||
| AC Material Requirements | ||||||||||||
| Hveem stability (minimum 37) | ||||||||||||
| Air Voids 3-5 % | ||||||||||||
| Virgin Mix | ||||||||||||
| Aggregate Pass #4<40% | ||||||||||||
| RAP | ||||||||||||
| TOTAL AC | ||||||||||||
| NEW AC | 4 | 4 | 4 | 4 | ||||||||
| % AC OF SALVAGED MIX | ||||||||||||
| % NEW AGG.MATERIAL | 70 | 70 | 70 | 70 | ||||||||
| % RAP | ||||||||||||
| New Aggregate | ||||||||||||
| Aggregate Pass #4 <40% | 67 | 67 | 67 | 67 | ||||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Missouri(29) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 |
|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 |
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 |
| L05B Thickness | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILLING (mm) | |||||||||
| SPS Construction Thickness | |||||||||
| AC OVERLAY (mm) | |||||||||
| Rod & Level | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILLING (mm) | |||||||||
| Rod & Level Std Dev | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILLING (mm) | |||||||||
| Rod & Level Min | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILLING (mm) | |||||||||
| Rod & Level Max | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILLING (mm) | |||||||||
| MILLING (mm) | |||||||||
| Lift Thicknessess | |||||||||
| Maximum Lift Thickness<=75mm | |||||||||
| AC Material Requirements | |||||||||
| Hveem stability (minimum 37) | |||||||||
| Air Voids 3-5 % | |||||||||
| Virgin Mix | |||||||||
| Aggregate Pass #4<40% | |||||||||
| RAP | |||||||||
| TOTAL AC | |||||||||
| NEW AC | |||||||||
| % AC OF SALVAGED MIX | |||||||||
| % NEW AGG.MATERIAL | |||||||||
| % RAP | |||||||||
| New Aggregate | |||||||||
| Aggregate Pass #4 <40% | |||||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Montana (30) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 560 | 561 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | ||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | ||
| L05B Thickness | |||||||||||
| AC OVERLAY (mm) | 66 | 117 | 142 | 51 | 107 | 183 | 180 | 114 | |||
| MILLING (mm) | 20 | 28 | 33 | 15 | 69 | 71 | 71 | 66 | |||
| SPS Construction Thickness | |||||||||||
| AC OVERLAY (mm) | 66 | 117 | 142 | 51 | 107 | 191 | 180 | 114 | |||
| Rod & Level | |||||||||||
| AC OVERLAY (mm) | 27 | 101 | 92 | 37 | 28 | 95 | 89 | 28 | |||
| MILL REPLACEMENT (mm) | |||||||||||
| Rod & Level Std Dev | |||||||||||
| AC OVERLAY (mm) | 8 | 10 | 10 | 9 | 9 | 9 | 11 | 8 | |||
| MILL REPLACEMENT (mm) | |||||||||||
| Rod & Level Min | |||||||||||
| AC OVERLAY (mm) | 10 | 79 | 74 | 13 | 13 | 74 | 51 | 13 | |||
| MILL REPLACEMENT (mm) | |||||||||||
| Rod & Level Max | |||||||||||
| AC OVERLAY (mm) | 46 | 119 | 127 | 64 | 48 | 122 | 117 | 46 | |||
| MILL REPLACEMENT (mm) | |||||||||||
| MILLING (mm) | 25 | 25 | 25 | 25 | 79 | 77 | 77 | 76 | |||
| Lift Thicknessess | |||||||||||
| Maximum Lift Thickness<=75mm | 61 | 94 | 89 | 64 | 74 | 94 | 94 | 71 | |||
| AC Material Requirements | |||||||||||
| Hveem stability (minimum 37)Air Voids 3-5 % | |||||||||||
| Air Voids 3-5 % | |||||||||||
| Virgin Mix | |||||||||||
| Aggregate Pass #4<40% | 51 | 55 | |||||||||
| RAP | |||||||||||
| TOTAL AC | |||||||||||
| NEW AC | |||||||||||
| % AC OF SALVAGED MIX | |||||||||||
| % NEW AGG.MATERIAL | |||||||||||
| % RAP | |||||||||||
| New Aggregate | |||||||||||
| Aggregate Pass #4 <40% | 51 | 51 | 51 | 51 | |||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| New JerseY (34) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 509 | 560 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | ||
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | ||
| L05B Thickness | |||||||||||
| AC OVERLAY (mm) | 48 | 119 | 119 | 46 | 107 | 198 | 198 | 109 | |||
| MILLING (mm) | 0 | 0 | 0 | 0 | 51 | 51 | 51 | 51 | |||
| SPS Construction Thickness | |||||||||||
| AC OVERLAY (mm) | 51 | 127 | 127 | 127 | 102 | 178 | 178 | 102 | |||
| Rod & Level | |||||||||||
| AC OVERLAY (mm) | 43 | 114 | 118 | 53 | 49 | 56 | 123 | 41 | |||
| MILL REPLACEMENT (mm) | 54 | 56 | 55 | 64 | |||||||
| Rod & Level Std Dev | |||||||||||
| AC OVERLAY (mm) | 12 | 9 | 8 | 9 | 6 | 6 | 14 | 6 | |||
| MILL REPLACEMENT (mm) | 9 | 10 | 8 | 11 | |||||||
| Rod & Level Min | |||||||||||
| AC OVERLAY (mm) | 18 | 99 | 102 | 28 | 28 | 43 | 81 | 23 | |||
| MILL REPLACEMENT (mm) | 28 | 36 | 36 | 48 | |||||||
| Rod & Level Max | |||||||||||
| AC OVERLAY (mm) | 69 | 132 | 137 | 76 | 61 | 66 | 156 | 51 | |||
| MILL REPLACEMENT (mm) | 69 | 89 | 86 | 99 | |||||||
| MILLING (mm) | 74 | 53 | 58 | 64 | |||||||
| Lift Thicknessess | |||||||||||
| Maximum Lift Thickness<=75mm | 61 | 89 | 102 | 64 | 76 | 97 | 102 | 76 | |||
| AC Material Requirements | |||||||||||
| Hveem stability (minimum 37) | |||||||||||
| Air Voids 3-5 % | |||||||||||
| Virgin Mix | |||||||||||
| Aggregate Pass #4<40% | 53 | 55 | 61 | 52 | |||||||
| RAP | |||||||||||
| TOTAL AC | |||||||||||
| NEW AC | |||||||||||
| % AC OF SALVAGED MIX | |||||||||||
| % NEW AGG.MATERIAL | |||||||||||
| % RAP | |||||||||||
| New Aggregate | |||||||||||
| Aggregate Pass #4 <40% | |||||||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| New Mexico(35) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 |
|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 |
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 |
| L05B Thickness | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILLING (mm) | |||||||||
| SPS Construction Thickness | |||||||||
| AC OVERLAY (mm) | 56 | 107 | 117 | 64 | 109 | 188 | 188 | 107 | |
| Rod & Level | |||||||||
| AC OVERLAY (mm) | 48 | 56 | 107 | 117 | 63 | 55 | 133 | 132 | 53 |
| MILL REPLACEMENT (mm) | 54 | 56 | 56 | 53 | |||||
| Rod & Level Std Dev | |||||||||
| AC OVERLAY (mm) | 6 | 12 | 11 | 11 | 9 | 4 | 5 | 6 | 6 |
| MILL REPLACEMENT (mm) | 4 | 5 | 5 | 6 | |||||
| Rod & Level Min | |||||||||
| AC OVERLAY (mm) | 33 | 33 | 86 | 91 | 48 | 48 | 122 | 122 | 33 |
| MILL REPLACEMENT (mm) | 46 | 46 | 46 | 33 | |||||
| Rod & Level Max | |||||||||
| AC OVERLAY (mm) | 61 | 79 | 127 | 137 | 79 | 66 | 145 | 147 | 64 |
| MILL REPLACEMENT (mm) | 66 | 66 | 69 | 64 | |||||
| MILLING (mm) | 51 | 51 | 51 | 64 | 51 | ||||
| Lift Thicknessess | |||||||||
| Maximum Lift Thickness<=75mm | 76 | 76 | 102 | 76 | 64 | 76 | 76 | 76 | 76 |
| AC Material Requirements | |||||||||
| Hveem stability (minimum 37) | |||||||||
| Air Voids 3-5 % | |||||||||
| Virgin Mix | |||||||||
| Aggregate Pass #4<40% | 49 | 59 | 59 | 59 | |||||
| RAP | |||||||||
| TOTAL AC | |||||||||
| NEW AC | 5 | 5 | 5 | 5 | |||||
| % AC OF SALVAGED MIX | |||||||||
| % NEW AGG.MATERIAL | 45 | 45 | 45 | 45 | |||||
| % RAP | |||||||||
| New Aggregate | |||||||||
| Aggregate Pass #4 <40% | 43 | 43 | 43 | 43 | |||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Oklahoma (40) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 | 560 |
|---|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | ||||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 | |
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 | |
| L05B Thickness | ||||||||||
| AC OVERLAY (mm) | ||||||||||
| MILLING (mm) | ||||||||||
| SPS Construction Thickness | ||||||||||
| AC OVERLAY (mm) | 46 | 112 | 119 | 43 | 99 | 163 | 147 | 79 | ||
| Rod & Level | ||||||||||
| AC OVERLAY (mm) | 46 | 112 | 119 | 43 | 99 | 163 | 146 | 78 | ||
| MILL REPLACEMENT (mm) | ||||||||||
| Rod & Level Std Dev | ||||||||||
| AC OVERLAY (mm) | 8 | 13 | 13 | 7 | 13 | 11 | 13 | 9 | ||
| MILL REPLACEMENT (mm) | ||||||||||
| Rod & Level Min | ||||||||||
| AC OVERLAY (mm) | 25 | 79 | 79 | 20 | 74 | 145 | 124 | 56 | ||
| MILL REPLACEMENT (mm) | ||||||||||
| Rod & Level Max | ||||||||||
| AC OVERLAY (mm) | 64 | 140 | 142 | 56 | 124 | 188 | 170 | 97 | ||
| MILL REPLACEMENT (mm) | 41 | 30 | 36 | 43 | ||||||
| MILLING (mm) | ||||||||||
| Lift Thicknessess | ||||||||||
| Maximum Lift Thickness<=75mm | 64 | 89 | 89 | 64 | 102 | 102 | 102 | 102 | ||
| AC Material Requirements | ||||||||||
| Hveem stability (minimum 37) | ||||||||||
| Air Voids 3-5 % | ||||||||||
| Virgin Mix | ||||||||||
| Aggregate Pass #4<40% | 42 | 47 | 42 | 34 | ||||||
| RAP | ||||||||||
| TOTAL AC | ||||||||||
| NEW AC | ||||||||||
| % AC OF SALVAGED MIX | 1 | 1 | 1 | 1 | ||||||
| % NEW AGG.MATERIAL | 70 | 70 | 70 | 70 | ||||||
| % RAP | ||||||||||
| New Aggregate | ||||||||||
| Aggregate Pass #4 <40% | 59 | 59 | 59 | 59 | ||||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Texas(48) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 |
|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 |
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 |
| L05B Thickness | |||||||||
| AC OVERLAY (mm) | 56 | 135 | 135 | 51 | 99 | 178 | 185 | 109 | |
| MILLING (mm) | 0 | 0 | 0 | 0 | |||||
| SPS Construction Thickness | |||||||||
| AC OVERLAY (mm) | 58 | 124 | 124 | 97 | 114 | 175 | 168 | 102 | |
| Rod & Level | |||||||||
| AC OVERLAY (mm) | 58 | 123 | 122 | 59 | 59 | 120 | 116 | 54 | |
| MILL REPLACEMENT (mm) | 56 | 55 | 53 | 47 | |||||
| Rod & Level Std Dev | |||||||||
| AC OVERLAY (mm) | 8 | 19 | 9 | 10 | 7 | 7 | 7 | 11 | |
| MILL REPLACEMENT (mm) | 7 | 6 | 6 | 5 | |||||
| Rod & Level Min | |||||||||
| AC OVERLAY (mm) | 43 | 0 | 102 | 30 | 46 | 99 | 102 | 0 | |
| MILL REPLACEMENT (mm) | 41 | 38 | 43 | 33 | |||||
| Rod & Level Max | |||||||||
| AC OVERLAY (mm) | 74 | 145 | 145 | 79 | 76 | 135 | 127 | 71 | |
| MILL REPLACEMENT (mm) | 71 | 76 | 64 | 66 | |||||
| MILLING (mm) | 44 | 46 | 37 | 43 | |||||
| Lift Thicknessess | |||||||||
| Maximum Lift Thickness<=75mm | 58 | 53 | 48 | 58 | 58 | 56 | 48 | 53 | |
| AC Material Requirements | |||||||||
| Hveem stability (minimum 37) | |||||||||
| Air Voids 3-5 % | |||||||||
| Virgin Mix | |||||||||
| Aggregate Pass #4<40% | 55 | 55 | |||||||
| RAP | |||||||||
| TOTAL AC | |||||||||
| NEW AC | 3 | 3 | 3 | 3 | |||||
| % AC OF SALVAGED MIX | |||||||||
| % NEW AGG.MATERIAL | 65 | 65 | 65 | 65 | |||||
| % RAP | |||||||||
| New Aggregate | |||||||||
| Aggregate Pass #4 <40% | 71 | 71 | 71 | 71 | |||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Alberta (81) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 |
|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 |
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 |
| L05B Thickness | |||||||||
| AC OVERLAY (mm) | 53 | 127 | 122 | 94 | 163 | 178 | 84 | ||
| MILLING (mm) | 0 | 0 | 0 | 41 | 56 | 76 | 64 | ||
| SPS Construction Thickness | |||||||||
| AC OVERLAY (mm) | 53 | 127 | 122 | 53 | 94 | 160 | 178 | 84 | |
| Rod & Level | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILL REPLACEMENT (mm) | |||||||||
| Rod & Level Std Dev | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILL REPLACEMENT (mm) | |||||||||
| Rod & Level Min | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILL REPLACEMENT (mm) | |||||||||
| Rod & Level Max | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILL REPLACEMENT (mm) | |||||||||
| MILLING (mm) | 56 | 53 | 48 | 50 | |||||
| Lift Thicknessess | |||||||||
| Maximum Lift Thickness<=75mm | 58 | 74 | 76 | 58 | 61 | 71 | 74 | 61 | |
| AC Material Requirements | |||||||||
| Hveem stability (minimum 37) | |||||||||
| Air Voids 3-5 % | |||||||||
| Virgin Mix | |||||||||
| Aggregate Pass #4<40% | 64 | 64 | |||||||
| RAP | |||||||||
| TOTAL AC | |||||||||
| NEW AC | 4 | 4 | 4 | 4 | |||||
| % AC OF SALVAGED MIX | |||||||||
| % NEW AGG.MATERIAL | 70 | 70 | 70 | 70 | |||||
| % RAP | |||||||||
| New Aggregate | |||||||||
| Aggregate Pass #4 <40% | 64 | 64 | 64 | 64 | |||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
| Alberta (81) | 501 | 502 | 503 | 504 | 505 | 506 | 507 | 508 | 509 |
|---|---|---|---|---|---|---|---|---|---|
| Required Thickness | |||||||||
| AC OVERLAY (mm) | 0 | 51 | 127 | 127 | 51 | 51 | 127 | 127 | 51 |
| MILLING (mm) | 0 | <25.4 | <25.4 | <25.4 | <25.4 | 38–50 | 38–50 | 38–50 | 38–50 |
| L05B Thickness | |||||||||
| AC OVERLAY (mm) | 69 | 124 | 142 | 81 | 165 | 165 | 94 | ||
| MILLING (mm) | 0 | ||||||||
| SPS Construction Thickness | |||||||||
| AC OVERLAY (mm) | 64 | 140 | 127 | 51 | 89 | 165 | 165 | 89 | |
| Rod & Level | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILL REPLACEMENT (mm) | |||||||||
| Rod & Level Std Dev | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILL REPLACEMENT (mm) | |||||||||
| Rod & Level Min | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILL REPLACEMENT (mm) | |||||||||
| Rod & Level Max | |||||||||
| AC OVERLAY (mm) | |||||||||
| MILL REPLACEMENT (mm) | |||||||||
| MILLING (mm) | 38 | 38 | 38 | 38 | |||||
| Lift Thicknessess | |||||||||
| Maximum Lift Thickness<=75mm | 51 | 51 | 51 | 51 | 51 | 38 | 38 | 51 | |
| AC Material Requirements | |||||||||
| Hveem stability (minimum 37) | |||||||||
| Air Voids 3-5 % | 4.5 | 4.5 | 3.9 | 3.9 | 3.9 | 3.9 | 4.5 | 4.5 | |
| Virgin Mix | |||||||||
| Aggregate Pass #4<40% | |||||||||
| RAP | |||||||||
| TOTAL AC | |||||||||
| NEW AC | 5 | 5 | 5 | 5 | |||||
| % AC OF SALVAGED MIX | |||||||||
| % NEW AGG.MATERIAL | 70 | 70 | 70 | 70 | |||||
| % RAP | |||||||||
| New Aggregate | |||||||||
| Aggregate Pass #4 <40% | 62 | 62 | 62 | 62 | |||||
Note: The number after the state name is the state’s numeric code in the LTPP data base.
|
Topics: research, infrastructure, pavements and materials Keywords: Design factors, experimental design, HMAC, LTPP, performance trends, SPS-5, overlay TRT Terms: research, facilities, transportation, highway facilities, roads, parts of roads, pavements, pavements--United States, concrete--maintenance and repair, asphalt--maintenance and repair Updated: 04/23/2012
|
|
|