3. Flow Charts


Substructure Integral Abutment Design Flow Chart Text

Return to Flow Chart

  1. Generate applied dead load and live load for the abutment components. (Design Step 7.11)
  2. Determine controlling limit state. Factor the loads according to Table S3.4.1-1 to be applied for pile design (Design Step 7.1.2)
  3. Check pile compressive resistance (S6.15 and S6.9.2). Determine number of piles and corresponding spacing. (Design Step 7.1.3.1)
  4. Design pile cap reinforcement. Check flexure and shear. (Design Step 7.1.4)
  5. Check the flexure and shear resistance of the backwall. (Design Step 7.1.4.1)
  6. Design wingwall (Design Step 7.1.5)
  7. Design approach slab for flexure (Design Step 7.1.6)

END.