Report
This report is an archived publication and may contain dated technical, contact, and link information
Publication Number: FHWA-RD-01-166
Date: November 2003

Structural Factors for Flexible Pavements—Initial Evaluation of The SPS-1 Experiment Final Report

APPENDIX B. SUMMARY OF CONSTRUCTION DATA

Appendix B contains a summary of the construction data available for each project.  The thickness data provided from these measurements come from three different sources.  The first source is the TST_L05B table and contains the values that are considered most representative of the material that was actually placed on the section.  The second source is the SPS1_LAYER table, which includes thicknesses that should be the same as those provided in the TST_L05B table.  However, in the majority of the data shown, these thicknesses are not the same.  The third source for thickness data is the SPS1_LAYER_THICKNESS table.  These data were obtained from elevation measurements taken on the projects after the placement of each layer.

Alabama (1)
101 102 103 104 105 106 107 108 109 110 111 112 161 162 163
Required Thickness
AC Surface
178
102
102
178
102
178
102
178
178
178
102
102
     
ATB
0
0
203
305
102
203
0
0
0
102
203
305
     
PATB
0
0
0
0
0
0
102
102
102
102
102
102
     
DGAB
203
305
0
0
102
102
102
203
305
0
0
0
     
L05B Thickness
AC Surface
                             
ATB
                             
PATB
                             
DGAB
                             
SPS Construction Thickeness
AC Surface
168
99
109
170
104
188
104
185
188
170
112
99
     
ATB
0
0
185
300
102
206
0
0
0
107
201
320
     
PATB
0
0
0
0
0
0
91
107
107
97
94
84
     
DGAB
201
302
0
0
102
91
104
201
302
0
0
0
     
Rod & Level
AC Surface
174
99
108
168
105
188
103
 
188
174
113
99
     
ATB
0
0
187
299
 
206
0
 
0
107
200
320
     
PATB
0
0
0
0
 
0
93
 
107
97
93
84
     
DGAB
201
302
0
0
 
95
104
200
303
0
0
0
     
Rod & Level Std Dev
AC Surface
6
8
8
11
13
7
7
 
9
6
7
10
     
ATB
   
9
9
 
9
     
10
10
6
     
PATB
           
10
 
10
12
12
10
     
DGAB
9
8
     
8
8
13
9
           
Rod & Level Min
AC Surface
163 81 89 147 86 173 89 0 170 165 102 74      
ATB
0 0 163 284 0 188 0 0 0 91 178 305      
PATB
0 0 0 0 0 0 71 0 81 76 71 64      
DGAB
188 287 0 0 0 79 86 170 277 0 0 0      
Rod & Level Max
AC Surface
183 112 122 193 127 208 124 0 213 188 132 119      
ATB
0 0 203 320 0 224 0 0 0 127 224 335      
PATB
0 0 0 0 0 0 117 0 127 122 112 102      
DGAB
218 323 0 0 0 112 122 226 320 0 0 0      
DGAB Material Requirements
< 50% Passing #4 Sieve
  47       48 33                
< 10 % Passing #200
  12       12 8                
LL < 25
                             
PI < 4
                             
Max Lift Thickness < 6
6 6     6 6 6 6 6            
ATB Material Requirements
Hveem
Swell < 0.7 mm
                             
Stability > 35
                             
Marshall 50-blow
Flow 2 - 5 mm
                             
Stability 4.4 kN
                             
Marshall 75-blow
Flow 3 - 7.6 mm
    3 3 3         3 3 3      
Stability 10 kN
    18 18 18 18       18 18 18      
First lift thickness < 6 inches
    2 3 3 2       1 2 3      
Sub lift thickness < 4
    3 3 1 3       2 2 3      
PATB Material Requirements
                             
< 2% Passing #200
                             
2 - 2.5% Ashpalt Content
                             
Roller type (Steel Wheel)
            STEEL WHL TANDEM      
Drainage Locations
3
3
3
3
3
3
1
1
1
1
1
1
     
Drainage Type
1
1
1
1
1
1
6
6
6
6
6
6
     
HMAC Binder Material Requirements
Marshall
75 blows
75
75
75
75
75
75
75
75
75
75
75
75
     
Min Stability
14
14
14
14
14
14
14
14
14
14
14
14
     
Flow 2 mm - 4 mm
3
3
3
3
3
3
3
3
3
3
3
3
     

Arizona (4) 113 114 115 116 117 118 119 120 121 122 123 160 161 162 163
Required Thickness
AC Surface
102 178 178 102 178 102 178 102 102 102 178 178      
ATB
0 0 203 305 102 203 0 0 0 102 203 305      
PATB
0 0 0 0 0 0 102 102 102 102 102 102      
DGAB
203 305 0 0 102 102 102 203 305 0 0 0      
L05B Thickness
AC Surface
114 173 168 104 193 102 160 102 104 107 073 170      
ATB
0 0 216 307 107 196 0 0 0 102 201 297      
PATB
0 0 0 0 0 0 114 109 107 117 97 104      
DGAB
191 305 0 0 107 104 107 193 300 140 0 0      
SPS Construction Thickeness
AC Surface
107 180 163 94 180 94 157 107 107 102 170 173      
ATB
0 0 216 300 99 196 0 0 0 109 198 292      
PATB
0 0 0 0 0 0 114 109 107 117 97 104      
DGAB
191 305 0 0 107 109 112 185 310 0 0 0      
Rod & Level
AC Surface
107 181 163 95 180 95 157 103 106 100 170 174      
ATB
0 0 216 299 100 196 0 0 0 108 199 293      
PATB
0 0 0 0 0 0 114 109 106 116 96 105      
DGAB
191 304 0 0 108 109 113 186 311 0 0 0      
Rod & Level Std Dev
AC Surface
11 21 5 6 8 7 8 9 7 8 5 7      
ATB
    9 11 9 5       7 7 7      
PATB
            13 12 9 9 11 6      
DGAB
12 24     10 8 19 16 11            
Rod & Level Min
AC Surface
89 163 152 86 170 81 135 81 94 76 163 163      
ATB
0 0 196 284 71 183 0 0 0 97 180 274      
PATB
0 0 0 0 0 0 66 76 86 109 76 91      
DGAB
165 241 0 0 89 91 79 155 290 0 0 0      
Rod & Level Max
AC Surface
137 249 178 122 198 122 180 132 119 119 183 188      
ATB
0 0 241 338 112 208 0 0 0 117 213 310      
PATB
0 0 0 0 0 0 140 124 122 137 117 119      
DGAB
216 378 0 0 135 127 152 224 335 0 0 0      
DGAB Material Requirements
< 50% Passing #4 Sieve
          49 67 49   80          
< 10 % Passing #200           8 12 7   17          
LL < 25
                             
PI < 4
          NP NP NP   NP          
Max Lift Thickness < 6
5 7     5 5 5 5 7            
ATB Material Requirements
Hveem
Swell < 0.7 mm
                             
Stability > 35
                             
Marshall 50-blow
Flow 2 - 5 mm
    3 3 3 3         3 3      
Stability 4.4 kN
    19 19 19 19         19 19      
Marshall 75-blow
Flow 3 - 7.6 mm
                             
Stability 10 kN
                             
First lift thickness < 6 inches
    4 4 4 4       4 4 4      
Sub lift thickness < 4
    4 4   4         4 4      
PATB Material Requirements
                             
< 2% Passing #200
            3     2   3      
2 - 2.5% Ashpalt Content
            3     3   3      
Roller type (Steel Wheel)
            STEEL WHL TANDEM      
Drainage Locations
3
3
3
3
3
3
1
1
1
1
1
1
     
Drainage Type
1
1
1
1
1
1
6
6
6
6
6
6
     
HMAC Binder Material Requirements
Marshall
75 blows
                             
Min Stability
                             
Flow 2 mm - 4 mm
                             


Arkansas (4)
113 114 115 116 117 118 119 120 121 122 123 124
Required Thickness
AC Surface
102 178 178 102 178 102 178 102 102 102 178 178
ATB
0 0 203 305 102 203 0 0 0 102 203 305
PATB
0 0 0 0 0 0 102 102 102 102 102 102
DGAB
203 305 0 0 102 102 102 203 305 0 0 0
L05B Thickness
AC Surface
                       
ATB
                       
PATB
                       
DGAB
                       
SPS Construction Thickeness
AC Surface
102 165 180 102 173 102 163 97 107 112 180 175
ATB
0 0 188 290 99 198 0 0 0 99 203 287
PATB
0 0 0 0 0 0 97 86 89 102 91 91
DGAB
208 132 0 0 104 89 107 206 312 0 0 0
Rod & Level
AC Surface
64 133 123 74 129 74 135 68 62 72 147 151
ATB
0 0 184 290 98 197 0 0 0 97 202 284
PATB
0 0 0 0 0 0 97 88 89 100 91 91
DGAB
208 132 0 0 103 88 108 208 313 0 0 0
Rod & Level Std Dev
AC Surface
6 9 2 5 6 6 10 8 5 5 9 6
ATB
    10 8 6 7       12 10 10
PATB
            8 9 10 8 5 5
DGAB
8 16     7 9 13 11 15      
Rod & Level Min
AC Surface
48 102 117 64 117 64 119 48 48 61 127 135
ATB
0 0 152 269 86 180 0 0 0 25 178 262
PATB
0 0 0 0 0 0 79 51 71 86 79 76
DGAB
188 104 0 0 89 74 79 188 284 0 0 0
Rod & Level Max
AC Surface
74 152 127 89 147 86 155 89 71 81 165 165
ATB
0 0 203 302 107 208 0 0 0 112 218 300
PATB
0 0 0 0 0 0 112 109 109 119 104 102
DGAB
226 173 0 0 112 107 135 229 351 0 0 0
DGAB Material Requirements
< 50% Passing #4 Sieve
                       
< 10 % Passing #200
                       
LL < 25
                       
PI < 4
                       
Max Lift Thickness < 6
4
4
   
4
4
4
4
4
     
ATB Material Requirements
Hveem
Swell < 0.7 mm
                       
Stability > 35
                       
Marshall 50-blow
Flow 2 - 5 mm
   
2
2
2
2
     
2
2
2
Stability 4.4 kN
   
11
11
11
11
     
11
11
11
Marshall 75-blow
Flow 3 - 7.6 mm
                       
Stability 10 kN
                       
First lift thickness < 6 inches
   
4
4
4
4
     
4
4
4
Sub lift thickness < 4
   
4
4
 
4
       
4
4
PATB Material Requirements
                       
< 2% Passing #200
           
3
   
2
 
3
2 - 2.5% Ashpalt Content
           
3
   
3
 
3
Roller type (Steel Wheel)
            DOUBLE-DRUM VIBR.
Drainage Locations
3
3
3
3
3
3
1
1
1
1
1
1
Drainage Type
1
1
1
1
1
1
6
6
6
6
6
6
HMAC Binder Material Requirements
Marshall
75 blows
75
75
75
75
75
75
75
75
75
75
75
75
Min Stability
8
8
8
8
8
8
8
8
8
8
8
8
Flow 2 mm - 4 mm
2
2
2
2
2
2
2
2
2
2
2
2

Delaware (10)
101
102
103
104
105
106
107
108
109
110
111
112
159
160
Required Thickness
AC Surface
178
102
102
178
102
178
102
178
178
178
102
102
   
ATB
0
0
203
305
102
203
0
0
0
102
203
305
   
PATB
0
0
0
0
0
0
102
102
102
102
102
102
   
DGAB
203
305
0
0
102
102
102
203
305
0
0
0
   
L05B Thickness
AC Surface
180 104 122 170 112 170 122 178 185 183 94 114    
ATB
0 0 203 305 112 216 0 0 0 104 221 312    
PATB
0 0 0 0 0 0 97 94 107 91 99 86    
DGAB
206 300 0 0 86 99 99 185 307 0 0 0    
SPS Construction Thickeness
AC Surface
173
114
122
170
112
173
160
183
188
185
91
112
   
ATB
0
0
203
305
112
216
0
0
0
104
218
312
   
PATB
0
0
0
0
0
0
97
94
107
91
102
86
   
DGAB
206
300
0
0
86
99
99
185
307
0
0
0
   
Rod & Level
AC Surface
176
104
121
171
113
175
122
178
186
183
95
114
   
ATB
0
0
203
306
111
216
0
0
0
105
222
313
   
PATB
0
0
0
0
0
0
96
94
107
92
99
86
   
DGAB
206
299
0
0
86
99
100
186
308
0
0
0
   
Rod & Level Std Dev
AC Surface
10
19
12
6
16
8
11
7
6
11
9
10
   
ATB
   
10
9
9
13
     
8
9
10
   
PATB
           
11
10
8
9
10
11
   
DGAB
14
15
   
11
17
20
20
19
         
Rod & Level Min
AC Surface
152
58
46
157
79
152
102
152
173
147
79
102
   
ATB
0
0
178
287
81
193
0
0
0
89
198
290
   
PATB
0
0
0
0
0
0
74
71
86
74
79
61
   
DGAB
168
262
0
0
64
61
56
135
277
0
0
0
   
Rod & Level Max
AC Surface
196
127
137
183
137
196
147
185
201
213
112
137
   
ATB
0
0
226
323
132
244
0
0
0
127
246
338
   
PATB
0
0
0
0
0
0
127
119
124
109
127
124
   
DGAB
229
333
0
0
117
132
140
218
356
0
0
0
   
DGAB Material Requirements
< 50% Passing #4 Sieve
                           
< 10 % Passing #200
                           
LL < 25
                           
PI < 4
                           
Max Lift Thickness < 6
4
4
   
4
4
4
5
4
         
ATB Material Requirements
Hveem
Swell < 0.7 mm
                           
Stability > 35
                           
Marshall 50-blow
Flow 2 - 5 mm
   
3
 
4
3
     
4
4
4
   
Stability 4.4 kN
   
10
 
11
9
     
8
8
8
   
Marshall 75-blow
Flow 3 - 7.6 mm
     
3
                   
Stability 10 kN
     
11
                   
First lift thickness < 6 inches
   
4
6
5
5
     
4
5
6
   
Sub lift thickness < 4
   
4
6
 
5
     
2
6
5
   
PATB Material Requirements
                           
< 2% Passing #200
                           
2 - 2.5% Ashpalt Content
           
2
   
2
       
Roller type (Steel Wheel)
           
STEEL WHL TANDEM
   
Drainage Locations
3
3
3
3
3
3
1
1
1
1
1
1
   
Drainage Type
1
1
1
1
1
1
2
2
2
6
6
6
   
HMAC Binder Material Requirements
Marshall
75 blows
75
75
75
75
75
75
75
75
75
75
75
75
75
75
Min Stability
11
11
10
13
11
10
9
9
8
10
10
10
   
Flow 2 mm - 4 mm
3
3
3
3
3
3
3
3
3
3
3
3
   

Florida (12)
101 102 103 104 105 106 107 108 109 110 111 112 161
Required Thickness
AC Surface
178 102 102 178 102 178 102 178 178 178 102 102  
ATB
0 0 203 305 102 203 0 0 0 102 203 305  
PATB
0 0 0 0 0 0 102 102 102 102 102 102  
DGAB
203 305 0 0 102 102 102 203 305 0 0 0  
L05B Thickness
AC Surface
173 99 104 173 99 183 99 163 180 185 99 99  
ATB
0 0 203 305 102 211 0 0 0 104 211 312  
PATB
0 0 0 0 0 0 104 102 104 104 102 99  
DGAB
206 307 0 0 102 102 104 201 297 0 0 0  
SPS Construction Thickeness
AC Surface
173 102 104 173 104 185 91 163 183 188 99 87  
ATB
0 0 206 305 104 203 0 0 0 99 211 310  
PATB
0 0 0 0 0 0 104 102 104 104 102 99  
DGAB
206 307 0 0 102 102 104 201 297 0 0 0  
Rod & Level
AC Surface
168 93 101 175 97 178 93 162 181 177 99 101  
ATB
0 0 203 309 103 204 0 0 0 98 199 301  
PATB
0 0 0 0 0 0 104 102 103 104 103 97  
DGAB
206 307 0 0 102 102 103 201 297 0 0 0  
Rod & Level Std Dev
AC Surface
4 4 5 4 5 6 7 6 4 6 6 7  
ATB
    5 6 5 6       7 5 6  
PATB
            4 6 4 5 5 4  
DGAB
5 15     11 6 8 5 7        
Rod & Level Min
AC Surface
157 86 89 168 89 165 79 152 173 163 86 89  
ATB
0 0 196 295 94 193 0 0 0 86 185 287  
PATB
0 0 0 0 0 0 91 86 94 91 89 86  
DGAB
196 208 0 0 79 86 86 193 287 0 0 0  
Rod & Level Max
AC Surface
178 109 107 183 107 193 109 173 188 185 112 119  
ATB
0 0 218 323 117 218 0 0 0 112 216 315  
PATB
0 0 0 0 0 0 112 117 109 112 112 109  
DGAB
218 333 0 0 124 117 124 213 310 0 0 0  
DGAB Material Requirements
< 50% Passing #4 Sieve
53                        
< 10 % Passing #200
10                        
LL < 25
0                        
PI < 4
NP                        
Max Lift Thickness < 6
6 7     6 6 6 6 9        
ATB Material Requirements
Hveem
Swell < 0.7 mm
                         
Stability > 35
                         
Marshall 50-blow
Flow 2 - 5 mm
                         
Stability 4.4 kN
                         
Marshall 75-blow
Flow 3 - 7.6 mm
                         
Stability 10 kN
                         
First lift thickness < 6 inches
    3 3 2 3       2 3 4  
Sub lift thickness < 4
    3 3 2 3       2 3 4  
PATB Material Requirements
                         
< 2% Passing #200
            3            
2 - 2.5% Ashpalt Content
            3            
Roller type (Steel Wheel)
           
PNEUMATIC TIRED
 
Drainage Locations
3
3
3
3
3
3
1
1
1
1
1
1
 
Drainage Type
1
1
1
1
1
1
2
2
2
6
6
6
 
HMAC Binder Material Requirements
Marshall
75 blows
75 75 75 75 75 75 75 75 75 75 75 75  
Min Stability
                         
Flow 2 mm - 4 mm
                         

Iowa (19)
101 102 103 104 105 106 107 108 109 110 111 112 159
Required Thickness
AC Surface
178
102
102
178
102
178
102
178
178
178
102
102
 
ATB
0
0
203
305
102
203
0
0
0
102
203
305
 
PATB
0
0
0
0
0
0
102
102
102
102
102
102
 
DGAB
203
305
0
0
102
102
102
203
305
0
0
0
 
L05B Thickness
AC Surface
203
 
97
178
89
173
86
 
191
201
112
117
 
ATB
0
0
213
315
   
0
0
0
       
PATB
0
0
0
0
0
0
     
112
109
104
 
DGAB
203
305
0
0
102
102
102
203
305
0
0
0
 
SPS Construction Thickeness
AC Surface
203
130
97
178
89
173
86
152
191
201
112
114
 
ATB
0
0
224
318
122
234
0
0
0
081
191
315
 
PATB
0
0
0
0
0
0
114
117
124
112
109
102
 
DGAB
203
305
0
0
102
102
102
203
305
0
0
0
 
Rod & Level
AC Surface
                         
ATB
                         
PATB
                         
DGAB
                         
Rod & Level Std Dev
AC Surface
                         
ATB
                         
PATB
                         
DGAB
                         
Rod & Level Min
AC Surface
                         
ATB
                         
PATB
                         
DGAB
                         
Rod & Level Max
AC Surface
                         
ATB
                         
PATB
                         
DGAB
                         
DGAB Material Requirements
< 50% Passing #4 Sieve
48
           
50
46
       
< 10 % Passing #200
7
           
8
8
       
LL < 25
                         
PI < 4
             
NP
NP
       
Max Lift Thickness < 6
6
6
   
6
6
6
6
9
       
ATB Material Requirements
Hveem
Swell < 0.7 mm
                         
Stability > 35
                         
Marshall 50-blow
Flow 2 - 5 mm
                         
Stability 4.4 kN
                         
Marshall 75-blow
Flow 3 - 7.6 mm
                         
Stability 10 kN
                         
First lift thickness < 6 inches
                         
Sub lift thickness < 4
                         
PATB Material Requirements
< 2% Passing #200
                         
2 - 2.5% Ashpalt Content
           
2
2
2
2
2
2
 
Roller type (Steel Wheel)
               
Drainage Locations
                         
Drainage Type
                         
HMAC Binder Material Requirements
Marshall
75 blows
                         
Min Stability
                         
Flow 2 mm - 4 mm
                         

 

Kansas (20)
101 102 103 104 105 106 107 108 109 110 111 112 159 160 161 162 163 164
Required Thickness
AC Surface
178
102
102
178
102
178
102
178
177
178
102
102
           
ATB
0
0
203
305
102
203
0
0
0
102
203
305
           
PATB
0
0
0
0
0
0
102
102
102
102
102
102
           
DGAB
203
305
0
0
102
102
102
203
305
0
0
0
           
L05B Thickness
AC Surface
193
102
91
173
99
185
104
193
178
178
102
127
           
ATB
0
0
1096
307
97
185
0
0
0
97
216
305
           
PATB
0
0
0
0
0
0
104
91
91
99
91
91
           
DGAB
216
312
0
0
104
102
94
201
302
0
0
0
           
SPS Construction Thickeness
AC Surface
107 102 102 178 102 178 102 178 178 102 178 102            
ATB
0 0 203 305 102 203 0 0 0 102 203 305            
PATB
0 0 0 0 0 0 102 102 102 102 102 102            
DGAB
203 305 0 0 102 102 102 203 305 0 0 0            
Rod & Level
AC Surface
171
96
108
188
102
173
109
183
189
191
97
105
           
ATB
0
0
194
308
107
195
0
0
0
97
217
317
           
PATB
0
0
0
0
0
0
97
95
91
100
94
95
           
DGAB
213
310
0
0
98
100
101
197
304
0
0
0
           
Rod & Level Std Dev
AC Surface
10
9
10
7
11
7
5
8
9
7
7
6
           
ATB
   
7
8
5
10
     
8
11
8
           
PATB
           
5
6
7
8
8
8
           
DGAB
11
8
   
7
6
10
8
8
                 
Rod & Level Min
AC Surface
152 81 86 173 71 152 94 165 165 173 81 91            
ATB
0 0 180 290 97 183 0 0 0 79 201 305            
PATB
0 0 0 0 0 0 86 81 76 79 76 76            
DGAB
178 290 0 0 86 89 79 185 279 0 0 0            
Rod & Level Max
AC Surface
193
122
132
198
119
188
119
196
203
201
112
119
           
ATB
0
0
216
320
122
224
0
0
0
112
249
338
           
PATB
0
0
0
0
0
0
107
107
109
122
112
112
           
DGAB
231
325
0
0
119
112
122
216
318
0
0
0
           
DGAB Material Requirements
< 50% Passing #4 Sieve
                                   
< 10 % Passing #200
                                   
LL < 25
                                   
PI < 4
                                   
Max Lift Thickness < 6
4 4     4 4 4 4 4                  
ATB Material Requirements
Hveem
Swell < 0.7 mm
                                   
Stability > 35
                                   
Marshall 50-blow
Flow 2 - 5 mm
                                   
Stability 4.4 kN
                                   
Marshall 75-blow
Flow 3 - 7.6 mm
                                   
Stability 10 kN
                                   
First lift thickness < 6 inches
                                   
Sub lift thickness < 4
                                   
PATB Material Requirements
                                   
< 2% Passing #200
                                   
2 - 2.5% Ashpalt Content
                                   
Roller type (Steel Wheel)
                         
Drainage Locations
3
3
3
3
3
3
1
1
1
1
1
1
           
Drainage Type
1
1
1
1
1
1
6
6
6
6
6
6
           
HMAC Binder Material Requirements
Marshall
75 blows
                                   
Min Stability
                                   
Flow 2 mm - 4 mm
                                   


Louisiana (22)
113 114 115 116 117 118 119 120 121 122 123 124
Required Thickness
AC Surface
102 178 178 102 178 102 178 102 102 102 178 178
ATB
0 0 203 305 102 203 0 0 0 102 203 305
PATB
0 0 0 0 0 0 102 102 102 102 102 102
DGAB
203 305 0 0 102 102 102 203 305 0 0 0
L05B Thickness
AC Surface
                       
ATB
                       
PATB
                       
DGAB
                       
SPS Construction Thickeness
AC Surface
132
239
191
124
170
112
168
97
89
99
173
170
ATB
0
0
208
272
91
183
0
0
0
94
191
282
PATB
0
0
0
0
0
0
91
86
104
102
97
89
DGAB
206
290
0
0
135
104
112
206
335
0
0
0
Rod & Level
AC Surface
133
237
191
123
169
112
169
96
89
98
172
172
ATB
0
0
208
269
90
181
0
0
0
93
190
281
PATB
0
0
0
0
0
0
90
86
104
101
95
88
DGAB
204
289
0
0
135
102
111
207
333
0
0
0
Rod & Level Std Dev
AC Surface
9
10
9
7
16
11
7
7
6
6
6
9
ATB
   
12
12
3
14
     
10
10
19
PATB
           
10
13
9
11
11
6
DGAB
11
8
   
20
15
8
8
16
     
Rod & Level Min
AC Surface
117
216
168
97
142
76
155
84
76
86
155
155
ATB
0
0
180
231
61
147
0
0
0
76
168
234
PATB
0
0
0
0
0
0
71
56
74
76
71
74
DGAB
183
274
0
0
104
76
89
188
305
0
0
0
Rod & Level Max
AC Surface
152
259
211
137
201
132
183
112
102
112
183
196
ATB
0
0
241
295
112
211
0
0
0
122
203
310
PATB
0
0
0
0
0
0
112
112
119
124
117
107
DGAB
231
307
0
0
178
140
127
226
371
0
0
0
DGAB Material Requirements
< 50% Passing #4 Sieve
                       
< 10 % Passing #200
                       
LL < 25
                       
PI < 4
                       
Max Lift Thickness < 6
8
12
   
4
4
4
8
12
     
ATB Material Requirements
Hveem
Swell < 0.7 mm
                       
Stability > 35
                       
Marshall 50-blow
Flow 2 - 5 mm
    3 3 3 3       3 3 3
Stability 4.4 kN
    9 9 9 9       9 9 9
Marshall 75-blow
Flow 3 - 7.6 mm
                       
Stability 10 kN
                       
First lift thickness < 6 inches
    3 4 4 4       2 3 3
Sub lift thickness < 4
    3 4   4       2 3 3
PATB Material Requirements
                       
< 2% Passing #200
            3     2   3
2 - 2.5% Ashpalt Content
            3     3   3
Roller type (Steel Wheel)
           
DOUBLE-DRUM VIBR.
Drainage Locations
3
3
3
3
3
3
1
1
1
1
1
1
Drainage Type
1
1
1
1
1
1
2
2
2
6
6
6
HMAC Binder Material Requirements
Marshall
75 blows
50
50
50
50
50
50
50
50
50
50
50
50
Min Stability
10
10
10
10
10
10
10
10
10
10
10
10
Flow 2 mm - 4 mm
3
3
3
3
3
3
3
3
3
3
3
3

 

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000
Turner-Fairbank Highway Research Center | 6300 Georgetown Pike | McLean, VA | 22101