U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
Federal Highway Administration Research and Technology
Coordinating, Developing, and Delivering Highway Transportation Innovations
REPORT |
This report is an archived publication and may contain dated technical, contact, and link information |
|
Publication Number: FHWA-HRT-17-008 Date: December 2017 |
Publication Number: FHWA-HRT-17-008 Date: December 2017 |
This appendix presents the interview guide used when contacting respondents to the online survey.
– Follow-up: seed, live plants, bare root trees, container stock? Mulch: none, straw, blankets, hydro, other? Temporary cover crop used? (If applicable), what type of hard armor or erosion material was used (e.g., mechanically stabilized earth (mse) walls, soil encapsulated lifts, gabion baskets, coir logs, erosion blankets)?
– Follow-up: Did it change any specifications based on Roadside Revegetation (e.g., regarding minimum compaction, topsoil, timing, watering, and mulch)?
– Follow-up: Can you provide any cost information?
– Follow-up: Did the contract specify maintenance or monitoring? If so, was this part of a permit condition?
– Follow-up: E.g., timing (i.e., strict installation dates), costs, access to material, contractor experience/knowledge; agency information (e.g., did you need more/different information)?
– Follow-up: In what ways did your agency observe these benefits, or did your agency or another organization quantify these benefits?