Alabama |
AL190 |
4-Laning of Airport Road, Gadsden, AL |
475,000 |
475,000 |
|
475,000 |
|
Alabama |
AL191 |
Church Street Overpass, AL |
950,000 |
950,000 |
|
950,000 |
|
Alabama |
AL192 |
City of Tuscaloosa Downtown Revitalization Project -University Blvd and Greensboro Avenue, AL |
3,800,000 |
3,800,000 |
|
3,800,000 |
|
Alabama |
AL193 |
Design and Planning of the North Perimeter Transportation Corridor, Opelika, AL |
213,750 |
213,750 |
|
213,750 |
|
Alabama |
AL194 |
Highway 75 Revitalization Project, AL |
237,500 |
237,500 |
|
237,500 |
|
Alabama |
AL195 |
Holmes Avenue Bridge Overpass, AL |
475,000 |
475,000 |
|
475,000 |
|
Alabama |
AL196 |
Pedestrian Bridge Over State Hwy 21 at Jacksonville State University, Jacksonville, AL |
237,500 |
237,500 |
|
237,500 |
|
Alabama |
AL197 |
Roadway improvements to Winston County Industrial Park Road, Winston County, AL |
95,000 |
95,000 |
|
95,000 |
|
Alabama |
AL198 |
US Hwy 43 Lighting Upgrades, Thomasville, AL |
380,000 |
380,000 |
|
380,000 |
|
Alabama |
AL199 |
West Veterans Boulevard Auburn, AL |
237,500 |
237,500 |
|
237,500 |
|
Alabama |
AL200 |
Widening of County Road 222, Cullman, AL |
285,000 |
285,000 |
|
285,000 |
|
Alabama |
|
|
|
|
7,386,250 |
|
7,386,250 |
Arkansas |
AR139 |
Bella Vista Bypass (Arkansas portion), Bella Vista, AR |
380,000 |
380,000 |
|
380,000 |
|
Arkansas |
AR140 |
Design and Engineering for the Western and Eastern Rail Trolley Extension, Fort Smith, AR |
237,500 |
237,500 |
|
237,500 |
|
Arkansas |
AR141 |
Interstate 430-630 Interchange Improvements, Little Rock, AR |
1,900,000 |
1,900,000 |
|
1,900,000 |
|
Arkansas |
AR142 |
Overpass, Marion, AR |
950,000 |
950,000 |
|
950,000 |
|
Arkansas |
|
|
|
|
3,467,500 |
|
3,467,500 |
California |
CA834 |
Alameda Corridor East Grade Separations, Riverside County, CA |
570,000 |
570,000 |
|
570,000 |
|
California |
CA835 |
Alameda Corridor East Grade Separations, San Gabriel Valley, CA |
570,000 |
570,000 |
|
570,000 |
|
California |
CA836 |
Assessment of Transit-Oriented Development Along Phase II of the Gold Line Foothill Extension, Monrovia, CA |
237,500 |
237,500 |
|
237,500 |
|
California |
CA837 |
Avenue 52 Grade Separation, over Union Pacific Railroad tracks and Grapefruit Blvd, Coachella, CA |
380,000 |
380,000 |
|
380,000 |
|
California |
CA838 |
Cesar Chavez Blvd/Calexico-West Port of Entry Congestion Improvements, CA |
2,850,000 |
2,850,000 |
|
2,850,000 |
|
California |
CA839 |
Garfield Avenue at Slauson Avenue Intersection, Commerce, CA |
475,000 |
475,000 |
|
475,000 |
|
California |
CA840 |
Harney Way Roadway Improvements, CA |
475,000 |
475,000 |
|
475,000 |
|
California |
CA841 |
Intersection Modernization, Synchronization, and Re-pavement, Bell, CA |
427,500 |
427,500 |
|
427,500 |
|
California |
CA842 |
Lenwood Road Grade Separation Project, CA |
237,500 |
237,500 |
|
237,500 |
|
California |
CA843 |
Monterey Bay Sanctuary Scenic Trail, CA |
475,000 |
475,000 |
|
475,000 |
|
California |
CA844 |
Potrero Boulevard/SR 60 Interchange, Beaumont, CA |
855,000 |
855,000 |
|
855,000 |
|
California |
CA845 |
Rancho Vista Blvd (Ave P) Project, Palmdale, CA |
475,000 |
475,000 |
|
475,000 |
|
California |
CA846 |
Santa Clarita Cross Valley Connector, Santa Clarita, CA |
570,000 |
570,000 |
|
570,000 |
|
California |
CA847 |
SR-91 Improvements, Orange and Riverside Counties, CA |
475,000 |
475,000 |
|
475,000 |
|
California |
|
|
|
|
9,072,500 |
|
9,072,500 |
Connecticut |
CT175 |
Edison Road Extension Project Orange, CT |
237,500 |
237,500 |
|
237,500 |
|
Connecticut |
CT176 |
Hockanum River Linear Park Trail Extension, East Hartford, CT |
475,000 |
475,000 |
|
475,000 |
|
Connecticut |
CT177 |
Quinnipiac River Linear Trail Wallingford, CT |
1,425,000 |
1,425,000 |
|
1,425,000 |
|
Connecticut |
CT178 |
Reconstruction of Riverside Drive, CT |
950,000 |
950,000 |
|
950,000 |
|
Connecticut |
CT179 |
Route 1 and Route 34 Connector, CT |
475,000 |
475,000 |
|
475,000 |
|
Connecticut |
CT180 |
Route 20-Route 75 Interchange Reconfiguration, Windsor Locks, CT |
475,000 |
475,000 |
|
475,000 |
|
Connecticut |
CT181 |
Storrs Center Downtown Infrastructure, CT |
712,500 |
712,500 |
|
712,500 |
|
Connecticut |
CT182 |
Stratford Greenway Project, Stratford, CT |
285,000 |
285,000 |
|
285,000 |
|
Connecticut |
|
|
|
|
5,035,000 |
|
5,035,000 |
Florida |
FL362 |
Blind Pass Road Reconstruction, St. Pete Beach, FL |
175,750 |
175,750 |
|
175,750 |
|
Florida |
FL363 |
Design and Construction of the John Young Parkway/Pleasant Hill Road Intersection Improvements, Osceola County, FL |
95,000 |
95,000 |
|
95,000 |
|
Florida |
FL364 |
Grand Lagoon Bridge Replacement and Thomas Drive Widening Project, FL |
332,500 |
332,500 |
|
332,500 |
|
Florida |
FL365 |
Heckscher Drive Widening and Bridge Replacement, Jacksonville, FL |
190,000 |
190,000 |
|
190,000 |
|
Florida |
FL366 |
Lemon Street Reconstruction and Street Enhancements, FL |
380,000 |
380,000 |
|
380,000 |
|
Florida |
FL367 |
North Access Road at Jacksonville International Airport, FL |
570,000 |
570,000 |
|
570,000 |
|
Florida |
FL368 |
Palm Bay Parkway, FL |
712,500 |
712,500 |
|
712,500 |
|
Florida |
FL369 |
Rails-to-Trails Project Connecting US 1 to Colbert, Flagler County, FL |
237,500 |
237,500 |
|
237,500 |
|
Florida |
FL370 |
Street Rehabilitation, Doral, FL |
237,500 |
237,500 |
|
237,500 |
|
Florida |
FL371 |
US 19 at Enterprise Road Partially Controlled Access Construction, Pinellas County, FL |
855,000 |
855,000 |
|
855,000 |
|
Florida |
FL372 |
US Highway 90 East Widening Project, FL |
380,000 |
380,000 |
|
380,000 |
|
Florida |
|
|
|
|
4,165,750 |
|
4,165,750 |
Illinois |
IL568 |
Milwaukee Avenue Rehabilitation, IL |
950,000 |
950,000 |
|
950,000 |
|
Illinois |
IL569 |
75th and 79th Street Improvements, IL |
237,500 |
237,500 |
|
237,500 |
|
Illinois |
IL570 |
North Lake Shore Drive Rehabilitation, IL |
1,425,000 |
1,425,000 |
|
1,425,000 |
|
Illinois |
IL571 |
Village of Franklin Park Street Rehabilitation, IL |
950,000 |
950,000 |
|
950,000 |
|
Illinois |
|
|
|
|
3,562,500 |
|
3,562,500 |
Indiana |
IN251 |
146th Street Corridor Extension from the Hamilton County Line to I-65, Boone County, IN |
855,000 |
855,000 |
|
855,000 |
|
Indiana |
IN252 |
Bike and Pedestrian Trails, City of Whiting, IN |
475,000 |
475,000 |
|
475,000 |
|
Indiana |
IN253 |
Cline Avenue Extension, East Chicago, IN |
950,000 |
950,000 |
|
950,000 |
|
Indiana |
IN254 |
Clinton Street Bridge Replacement, Fort Wayne, IN |
712,500 |
712,500 |
|
712,500 |
|
Indiana |
IN255 |
Improvements to 61st Avenue, City of Hobart, IN |
475,000 |
475,000 |
|
475,000 |
|
Indiana |
IN256 |
Improvements to Central Avenue, City of Portage, IN |
475,000 |
475,000 |
|
475,000 |
|
Indiana |
|
|
|
|
3,942,500 |
|
3,942,500 |
Iowa |
IA226 |
Highway 100 Extension from Edgewood Road to Highway 30, Cedar Rapids, IA |
950,000 |
950,000 |
|
950,000 |
|
Iowa |
IA227 |
Hwy 169 Corridor Project Environmental Assessment, Preliminary Engineering and Planning, Humboldt, IA |
760,000 |
760,000 |
|
760,000 |
|
Iowa |
IA228 |
SE Connector, SE 6th Street to SE 14th Street (US 69), Des Moines, IA |
1,662,500 |
1,662,500 |
|
1,662,500 |
|
Iowa |
IA229 |
Southwest Arterial, Dubuque, IA |
950,000 |
950,000 |
|
950,000 |
|
Iowa |
IA230 |
U.S. Highway 20 Construction, Calhoun and Webster Counties, IA |
855,000 |
855,000 |
|
855,000 |
|
Iowa |
IA231 |
Wapsi Great Western Line Trail, Mitchell County, IA |
570,000 |
570,000 |
|
570,000 |
|
Iowa |
|
|
|
|
5,747,500 |
|
5,747,500 |
Kansas |
KS126 |
159th and US 69 Interchange Improvements, Overland Park, KS |
950,000 |
950,000 |
|
950,000 |
|
Kansas |
KS127 |
21st Street North Railroad Overpass (Broadway to I-135), Wichita, KS |
380,000 |
380,000 |
|
380,000 |
|
Kansas |
KS128 |
K-7 Corridor Study from 183rd St to 119th Street in Olathe, KS |
712,500 |
712,500 |
|
712,500 |
|
Kansas |
KS129 |
Noise Abatement Along K96, I-235 and Meridian Avenue, Wichita, KS |
237,500 |
237,500 |
|
237,500 |
|
Kansas |
|
|
|
|
2,280,000 |
|
2,280,000 |
Kentucky |
KY182 |
Edward T. Breathitt (Pennyrile) Parkway Extension Project, KY |
2,280,000 |
2,280,000 |
|
2,280,000 |
|
Kentucky |
KY183 |
Morehead/Rowan County Airport Access Road, KY |
902,500 |
902,500 |
|
902,500 |
|
Kentucky |
|
|
|
|
3,182,500 |
|
3,182,500 |
Louisiana |
LA202 |
4-Laning of Hwy 84 from Vidalia to Toledo Bend, LA |
285,000 |
285,000 |
|
285,000 |
|
Louisiana |
LA203 |
Bossier Parish Congestion Relief Plan, LA |
950,000 |
950,000 |
|
950,000 |
|
Louisiana |
LA204 |
Delta Highway 65 Study/Expansion, LA |
142,500 |
142,500 |
|
142,500 |
|
Louisiana |
LA205 |
El Camino East/West Corridor, Winnfield, LA |
475,000 |
475,000 |
|
475,000 |
|
Louisiana |
LA206 |
Isabel Swamp Road, Washington Parish, LA |
427,500 |
427,500 |
|
427,500 |
|
Louisiana |
LA207 |
LA 28, Vernon Parish, LA |
1,900,000 |
1,900,000 |
|
1,900,000 |
|
Louisiana |
LA208 |
Peters Road Extension, Plaquemines Parish, LA |
617,500 |
617,500 |
|
617,500 |
|
Louisiana |
LA209 |
Lake Charles Riverfront Development Plan |
237,500 |
237,500 |
|
237,500 |
|
Louisiana |
|
|
|
|
5,035,000 |
|
5,035,000 |
Maine |
ME080 |
Bayside Promenade, ME |
760,000 |
760,000 |
|
760,000 |
|
Maine |
|
|
|
|
760,000 |
|
760,000 |
Maryland |
MD164 |
MD 246- MD 235 to Saratoga Drive, MD |
712,500 |
712,500 |
|
712,500 |
|
Maryland |
MD165 |
U.S. 301 Improvements, MD |
712,500 |
712,500 |
|
712,500 |
|
Maryland |
|
|
|
|
1,425,000 |
|
1,425,000 |
Massachusetts |
MA250 |
Clippership Linear Pedestrian Path and Bikeway, City of Medford, MA |
475,000 |
475,000 |
|
475,000 |
|
Massachusetts |
MA251 |
College of the Holy Cross-McKeon Road Safety and Gateway Improvement, MA |
475,000 |
475,000 |
|
475,000 |
|
Massachusetts |
MA252 |
Commonwealth Avenue Improvements, Boston, MA |
475,000 |
475,000 |
|
475,000 |
|
Massachusetts |
MA253 |
Landscape Connectivity Study for Massachusetts, UMass-Amherst, MA |
285,000 |
285,000 |
|
285,000 |
|
Massachusetts |
MA254 |
Mass. Ave. Construction, Town of Arlington, MA |
475,000 |
475,000 |
|
475,000 |
|
Massachusetts |
MA255 |
Morse Street Bridge Construction and Renovation, Norwood, MA |
665,000 |
665,000 |
|
665,000 |
|
Massachusetts |
MA256 |
Planning, Design and Engineering Study for the I-495/Route 9 Interchange, Westborough, MA |
285,000 |
285,000 |
|
285,000 |
|
Massachusetts |
MA257 |
Replacement of Retaining Walls on Route 116, Ashfield and Conway, MA |
1,615,000 |
1,615,000 |
|
1,615,000 |
|
Massachusetts |
MA258 |
Routes 10 and 202 Improvements, Southwick, MA |
237,500 |
237,500 |
|
237,500 |
|
Massachusetts |
MA259 |
Spring and Elliot Street Improvements, Springfield, MA |
950,000 |
950,000 |
|
950,000 |
|
Massachusetts |
MA260 |
Community Transportation Association of America Nationwide JOBLINKS |
855,000 |
855,000 |
|
855,000 |
|
Massachusetts |
|
|
|
|
6,792,500 |
|
6,792,500 |
Michigan |
MI311 |
Allen Creek Greenway, Ann Arbor, MI |
237,500 |
237,500 |
|
237,500 |
|
Michigan |
MI312 |
Ann Arbor-Detroit Regional Rail Project, MI |
950,000 |
950,000 |
|
950,000 |
|
Michigan |
MI313 |
Crooks Road Widening and Concrete Replacement, Clawson and Royal Oak, MI |
570,000 |
570,000 |
|
570,000 |
|
Michigan |
MI314 |
Northwestern Roundabouts in West Bloomfield Township and Farmington Hills, MI |
712,500 |
712,500 |
|
712,500 |
|
Michigan |
|
|
|
|
2,470,000 |
|
2,470,000 |
Minnesota |
MN251 |
City of Isanti Pedestrian Bridge over TH 65, Isanti, MN |
950,000 |
950,000 |
|
950,000 |
|
Minnesota |
MN252 |
Highway 14, Waseca to Owatonna, MN |
2,375,000 |
2,375,000 |
|
2,375,000 |
|
Minnesota |
MN253 |
Snelling Avenue Pedestrian Median, St. Paul, MN--Improving Pedestrian Safety, MN |
475,000 |
475,000 |
|
475,000 |
|
Minnesota |
MN254 |
TH 610 Roadway Improvements from 169 in Brooklyn Park to I-94, Maple Grove, MN |
1,520,000 |
1,520,000 |
|
1,520,000 |
|
Minnesota |
MN255 |
TH 8 in Lindstrom, Lindstrom, MN |
950,000 |
950,000 |
|
950,000 |
|
Minnesota |
MN256 |
TH 95 Bridge Project, North Branch, MN |
1,425,000 |
1,425,000 |
|
1,425,000 |
|
Minnesota |
MN257 |
TH-13 / CR 5 Interchange, MN |
950,000 |
950,000 |
|
950,000 |
|
Minnesota |
|
|
|
|
8,645,000 |
|
8,645,000 |
Mississippi |
MS202 |
Anchor Lake Project, MS |
950,000 |
950,000 |
|
950,000 |
|
Mississippi |
MS203 |
Artesia Road Bypass, MS |
950,000 |
950,000 |
|
950,000 |
|
Mississippi |
MS204 |
Highway 9 Improvements, MS |
2,850,000 |
2,850,000 |
|
2,850,000 |
|
Mississippi |
MS205 |
N.A. Sandifer Highway, MS |
299,250 |
299,250 |
|
299,250 |
|
Mississippi |
MS206 |
Northside Drive, MS |
1,900,000 |
1,900,000 |
|
1,900,000 |
|
Mississippi |
MS207 |
South Entrance Interchange at Mississippi State University, MS |
950,000 |
950,000 |
|
950,000 |
|
Mississippi |
MS208 |
West Point Defense Facility Access Improvements, MS |
950,000 |
950,000 |
|
950,000 |
|
Mississippi |
MS209 |
Western Beltway Transportation Infrastructure Plan, MS |
475,000 |
475,000 |
|
475,000 |
|
Mississippi |
|
|
|
|
9,324,250 |
|
9,324,250 |
Missouri |
MO221 |
Bland Street Improvements, Bland, MO |
285,000 |
285,000 |
|
285,000 |
|
Missouri |
MO222 |
Chester Bridge Deck Repair and Rehabilitation, Perry County, MO |
475,000 |
475,000 |
|
475,000 |
|
Missouri |
MO223 |
Improvements to the Route 60 Bridges over the James River, MO |
1,187,500 |
1,187,500 |
|
1,187,500 |
|
Missouri |
MO224 |
Joplin Downtown Revitalization, MO |
950,000 |
950,000 |
|
950,000 |
|
Missouri |
MO225 |
Page Extension Phase II, MO |
950,000 |
950,000 |
|
950,000 |
|
Missouri |
MO226 |
Route 150, MO |
950,000 |
950,000 |
|
950,000 |
|
Missouri |
MO227 |
Route 160 Safety and Roadway Improvements, Taney County, MO |
665,000 |
665,000 |
|
665,000 |
|
Missouri |
MO228 |
Route 5 Improvements in Laclede and Camden Counties, MO |
950,000 |
950,000 |
|
950,000 |
|
Missouri |
MO229 |
Route 60/65 Interchange Improvements, Greene Cnty, MO |
237,500 |
237,500 |
|
237,500 |
|
Missouri |
MO230 |
Route 67--Poplar Bluff Industrial Park Bypass, Butler County, MO |
665,000 |
665,000 |
|
665,000 |
|
Missouri |
MO231 |
Route 76 Bridge Rehabilitation at Lake Taneycomo, MO |
427,500 |
427,500 |
|
427,500 |
|
Missouri |
MO232 |
Upgrade Rt 94 (Page Extension Phase 2), St Charles County, MO |
190,000 |
190,000 |
|
190,000 |
|
Missouri |
|
|
|
|
7,932,500 |
|
7,932,500 |
Montana |
MT064 |
Railroad Grade Separation Undercrossing, Livingston, MT |
332,500 |
332,500 |
|
332,500 |
|
Montana |
MT065 |
Shiloh Road, MT |
4,750,000 |
4,750,000 |
|
4,750,000 |
|
Montana |
|
|
|
|
5,082,500 |
|
5,082,500 |
Nevada |
NV086 |
Bonneville/Clark One-Way Couplet, NV |
475,000 |
475,000 |
|
475,000 |
|
Nevada |
NV087 |
Lake Mead Parkway, Phase 2, NV |
237,500 |
237,500 |
|
237,500 |
|
Nevada |
NV088 |
ReTrac Project Enhancements, Reno, NV |
237,500 |
237,500 |
|
237,500 |
|
Nevada |
NV089 |
V and T Railroad Reconstruction Project, NV |
475,000 |
475,000 |
|
475,000 |
|
Nevada |
|
|
|
|
1,425,000 |
|
1,425,000 |
New Hampshire |
NH081 |
Town of Tamworth, Chocorua Village Safety Project, NH |
475,000 |
475,000 |
|
475,000 |
|
New Hampshire |
|
|
|
|
475,000 |
|
475,000 |
New Jersey |
NJ294 |
Route 22 Sustainable Corridor Plan, NJ |
570,000 |
570,000 |
|
570,000 |
|
New Jersey |
|
|
|
|
570,000 |
|
570,000 |
New Mexico |
NM093 |
Plaza del Sol Project, Village of Angel Fire, NM |
216,125 |
216,125 |
|
216,125 |
|
New Mexico |
|
|
|
|
216,125 |
|
216,125 |
New York |
NY747 |
Campus Loop Road Extension for St. John Fisher College, NY |
475,000 |
475,000 |
|
475,000 |
|
New York |
NY748 |
Downtown Streetscape Improvement, White Plains, NY |
285,000 |
285,000 |
|
285,000 |
|
New York |
NY749 |
Establishment of Railroad Quiet Zones in the Town of Hamburg, NY |
475,000 |
475,000 |
|
475,000 |
|
New York |
NY750 |
Jefferson Avenue Rehabilitation Project, NY |
950,000 |
950,000 |
|
950,000 |
|
New York |
NY751 |
Midtown Redevelopment Transportation Infrastructure Improvements, NY |
950,000 |
950,000 |
|
950,000 |
|
New York |
NY752 |
New York State Route 12 |
475,000 |
475,000 |
|
475,000 |
|
New York |
NY753 |
North Brother Island Pathway Construction, Bronx, NY |
950,000 |
950,000 |
|
950,000 |
|
New York |
NY754 |
NY-02 Package Delivery Demonstration Project, NY |
712,500 |
712,500 |
|
712,500 |
|
New York |
NY755 |
Port of Oswego Connector Project, Oswego, NY |
237,500 |
237,500 |
|
237,500 |
|
New York |
NY756 |
South Bronx Initiative Streetscape/Distinctive Lighting Project, Bronx, NY |
855,000 |
855,000 |
|
855,000 |
|
New York |
NY757 |
Town Center Streetscape Improvements, Town of Eastchester, NY |
380,000 |
380,000 |
|
380,000 |
|
New York |
NY758 |
Town of Clarkstown, New City Hamlet, NY to revitalize South Main Street |
475,000 |
475,000 |
|
475,000 |
|
New York |
NY759 |
Traffic Safety and Congestion Improvements, Town of Harrison, NY |
285,000 |
285,000 |
|
285,000 |
|
New York |
NY760 |
Walkway over the Hudson, Poughkeepsie, NY |
475,000 |
475,000 |
|
475,000 |
|
New York |
|
|
|
|
7,980,000 |
|
7,980,000 |
North Dakota |
ND078 |
55th Street East Grade Separation, Minot, ND |
950,000 |
950,000 |
|
950,000 |
|
North Dakota |
|
|
|
|
950,000 |
|
950,000 |
Ohio |
OH390 |
Engineering Study for the Rickenbacker Intermodal East-West Connector, OH |
522,500 |
522,500 |
|
522,500 |
|
Ohio |
OH391 |
Great Miami Boulevard Extension, Dayton, OH |
570,000 |
570,000 |
|
570,000 |
|
Ohio |
OH392 |
Lake Metroparks Greenway Corridor Overhead Crossing of Norfolk and Southern Railroad, Painesville City, OH |
570,000 |
570,000 |
|
570,000 |
|
Ohio |
OH393 |
Pedestrian and Roadway Improvements to the North, Mill and Cleveland Streets Corridor, OH |
380,000 |
380,000 |
|
380,000 |
|
Ohio |
OH394 |
State Street Repaving, Zanesville, OH |
237,500 |
237,500 |
|
237,500 |
|
Ohio |
OH395 |
Traffic Signal Preemption System, Willoughby, OH |
85,500 |
85,500 |
|
85,500 |
|
Ohio |
|
|
|
|
2,365,500 |
|
2,365,500 |
Oklahoma |
OK149 |
Downtown Revitalization (I-44 to 2nd Street), Lawton, OK |
95,000 |
95,000 |
|
95,000 |
|
Oklahoma |
OK150 |
Midwest City I-40/Hudiburg Drive Beautification, OK |
475,000 |
475,000 |
|
475,000 |
|
Oklahoma |
OK151 |
St. John Medical Center--Broken Arrow Traffic Improvement, OK |
237,500 |
237,500 |
|
237,500 |
|
Oklahoma |
OK152 |
U.S. 169 Highway Widening Environmental Assessment, City of Owasso, OK |
1,045,000 |
1,045,000 |
|
1,045,000 |
|
Oklahoma |
|
|
|
|
1,852,500 |
|
1,852,500 |
Pennsylvania |
PA725 |
5th and Market Street Transportation Improvements, PA |
475,000 |
475,000 |
|
475,000 |
|
Pennsylvania |
PA726 |
Fraser Street Improvements, State College, PA |
475,000 |
475,000 |
|
475,000 |
|
Pennsylvania |
PA727 |
Freedom Road Transportation Improvement Project, PA |
1,662,500 |
1,662,500 |
|
1,662,500 |
|
Pennsylvania |
PA728 |
Mon/Fayette Expressway, Uniontown to Brownsville, Fayette County, PA |
760,000 |
760,000 |
|
760,000 |
|
Pennsylvania |
PA729 |
Realignment and Intersection Improvements on PA Route 248, Bath, PA |
570,000 |
570,000 |
|
570,000 |
|
Pennsylvania |
|
|
|
|
3,942,500 |
|
3,942,500 |
Rhode Island |
RI089 |
Town Development Plan, Town of Portsmouth, RI |
950,000 |
950,000 |
|
950,000 |
|
Rhode Island |
|
|
|
|
950,000 |
|
950,000 |
South Carolina |
SC141 |
Harden Street Improvements--Phase II, SC |
950,000 |
950,000 |
|
950,000 |
|
South Carolina |
SC142 |
Town of Lexington United Traffic Plan--Phase I, SC |
950,000 |
950,000 |
|
950,000 |
|
South Carolina |
|
|
|
|
1,900,000 |
|
1,900,000 |
South Dakota |
SD180 |
Road improvements on Powderhouse Road from SD 42 to Madison Street, Sioux Falls, SD |
2,850,000 |
2,850,000 |
|
2,850,000 |
|
South Dakota |
|
|
|
|
2,850,000 |
|
2,850,000 |
Tennessee |
TN276 |
Chattanooga to Nashville High Speed Ground Transportation Corridor, Chattanooga, TN |
570,000 |
570,000 |
|
570,000 |
|
Tennessee |
TN277 |
State Route 317, between I-75 and Collegedale in Hamilton County, TN |
950,000 |
950,000 |
|
950,000 |
|
Tennessee |
TN278 |
|
|
|
1,520,000 |
|
1,520,000 |
Texas |
TX445 |
CR 302 Repaving, Grimes County, TX |
760,000 |
760,000 |
|
760,000 |
|
Texas |
TX446 |
Decordova Traffic Signal and Turn Lane Upgrade, TX |
380,000 |
380,000 |
|
380,000 |
|
Texas |
TX447 |
East Texas Higher Speed Rail Feasibility Study, TX |
285,000 |
285,000 |
|
285,000 |
|
Texas |
TX448 |
FM509 Extension, Harlingen, TX |
475,000 |
475,000 |
|
475,000 |
|
Texas |
TX449 |
Fort Sam Houston Access, TX |
427,500 |
427,500 |
|
427,500 |
|
Texas |
TX450 |
Henderson Street Bridge Construction at the Trinity River, Fort Worth, TX |
1,520,000 |
1,520,000 |
|
1,520,000 |
|
Texas |
TX451 |
Interstate 69, TX |
617,500 |
617,500 |
|
617,500 |
|
Texas |
TX452 |
Irving Boulevard Corridor Enhancement Project, Irving, TX |
380,000 |
380,000 |
|
380,000 |
|
Texas |
TX453 |
Loop Road Project, TX |
950,000 |
950,000 |
|
950,000 |
|
Texas |
|
|
|
|
5,795,000 |
|
5,795,000 |
Vermont |
VT069 |
Vermont Route 15 Improvements in Johnson and Essex Junction, VT |
2,850,000 |
2,850,000 |
|
2,850,000 |
|
Vermont |
|
|
|
|
2,850,000 |
|
2,850,000 |
Virginia |
VA257 |
Gate and Intersection Improvements at Fort Lee, VA |
1,425,000 |
1,425,000 |
|
1,425,000 |
|
Virginia |
VA258 |
Route 1/Route 123 Interchange Improvements, VA |
950,000 |
950,000 |
|
950,000 |
|
Virginia |
|
|
|
|
2,375,000 |
|
2,375,000 |
Washington |
WA302 |
Granite Falls Alternate Route, WA |
2,375,000 |
2,375,000 |
|
2,375,000 |
|
Washington |
WA303 |
Kittitas Highway Safety and Roadway Improvements, Kittitas County, WA |
332,500 |
332,500 |
|
332,500 |
|
Washington |
WA304 |
Port Industrial Road Improvement Project, WA |
3,800,000 |
3,800,000 |
|
3,800,000 |
|
Washington |
WA305 |
Steptoe Street Extension, Kennewick and Richland, WA |
2,185,000 |
2,185,000 |
|
2,185,000 |
|
Washington |
WA306 |
US 2 Safety Corridor Improvements, WA |
2,018,750 |
2,018,750 |
|
2,018,750 |
|
Washington |
WA307 |
Valley Mall Boulevard Improvements, Union Gap, WA |
570,000 |
570,000 |
|
570,000 |
|
Washington |
|
|
|
|
11,281,250 |
|
11,281,250 |
West Virginia |
WV094 |
Coalfields Expressway, WV |
4,750,000 |
4,750,000 |
|
4,750,000 |
|
West Virginia |
WV095 |
King Coal Highway, WV |
4,750,000 |
4,750,000 |
|
4,750,000 |
|
West Virginia |
|
|
|
|
9,500,000 |
|
9,500,000 |
Wisconsin |
WI167 |
Grade Separation Stevens Point, WI |
475,000 |
475,000 |
|
475,000 |
|
Wisconsin |
WI168 |
Highway 53 Interchanges, WI |
1,900,000 |
1,900,000 |
|
1,900,000 |
|
Wisconsin |
WI179 |
Milwaukee Intermodal Station Improvements to Train Shed and Platforms, WI (Demo ID reassigned from WI169 to WI179 per memo dated March 7, 2011) |
1,425,000 |
1,425,000 |
|
1,425,000 |
|
Wisconsin |
WI170 |
North Fond du Lac Railyard Overpass, Village of North Fond du Lac, WI |
570,000 |
570,000 |
|
570,000 |
|
Wisconsin |
WI171 |
Schofield Avenue Reconstruction, Weston, WI |
950,000 |
950,000 |
|
950,000 |
|
Wisconsin |
WI172 |
USH 10, Marshfield-Stevens Point, WI |
1,900,000 |
1,900,000 |
|
1,900,000 |
|
Wisconsin |
|
|
|
|
7,220,000 |
|
7,220,000 |
Grand Total |
|
|
|
|
161,326,625 |
|
161,326,625 |