State | City/County | Route | Material | Type | Year | Length (feet) | Height (feet) | Cost ($/sq ft) | Cost Current Year (2010) |
---|---|---|---|---|---|---|---|---|---|
Colorado | Adams | I-225 Potomac-Colfax | Block | I | 1996 | 3,700 | 13.0 | 0 | 0 |
Colorado | Adams | I-225, E 30th-E 32nd | Block | I | 1997 | 2,112 | 25.0 | 13 | 705,338 |
Colorado | Adams | I-225,Colfax-28th Ave | Block | I | 1997 | 5,281 | 13.0 | 6 | 380,183 |
Colorado | Adams | I-225,SandCreek-Potom | Block | I | 1996 | 1,601 | 14.0 | 0 | 0 |
Colorado | Adams Co | I-25 | Comb/Berm/Wood | II | 1990 | 3,119 | 13.0 | 9 | 379,583 |
Colorado | Adams Co | I-25 | Concrete/Unspecified | I | 1992 | 1,279 | 10.0 | 30 | 378,566 |
Colorado | Adams Co | I-270 West of York | Block | I | 2001 | 840 | 12.0 | 39 | 396,294 |
Colorado | Adams Co | I-76 | Wood/Unspecified | I | 1992 | 239 | 10.0 | 14 | 32,499 |
Colorado | Adams Co | I-76 East of York | Block | I | 2001 | 700 | 12.0 | 39 | 330,491 |
Colorado | Arapahoe/Douglas Co | Co Line Rd/Arap-Que | Concrete/Unspecified | I | 2001 | 1,760 | 8.0 | 35 | 491,436 |
Colorado | Arvada | I-70 | Wood/Unspecified | I | 1990 | 298 | 10.0 | 11 | 33,448 |
Colorado | Arvada | I-76/I-70, SH 121 | Concrete/Precast | I | 1994 | 2,883 | 13.0 | 47 | 1,750,561 |
Colorado | Arvada | SH 121 | Wood/Unspecified | I | 1993 | 590 | 8.0 | 16 | 75,234 |
Colorado | Arvada | SH 121 | Concrete/Unspecified | I | 1995 | 1,673 | 12.0 | 50 | 1,005,960 |
Colorado | Aurora | I-225 | Comb/Concrete/Block | I | 1993 | 3,828 | 13.0 | 22 | 1,104,688 |
Colorado | Aurora | I-225 | Other | I | 1995 | 11,778 | 10.0 | 46 | 5,381,876 |
Colorado | Aurora | I-225 2nd to 6th | Block | I | 2004 | 906 | 10.0 | 32 | 288,887 |
Colorado | Aurora | I-225 Alameda Interchg | Block | I | 2001 | 630 | 12.0 | 29 | 215,773 |
Colorado | Aurora | I-225 N. of Iliff | Block | I | 2002 | 2,500 | 14.0 | 33 | 1,168,006 |
Colorado | Aurora | I-225 Parker Interchg | Block | I | 2001 | 3,100 | 12.0 | 36 | 1,351,450 |
Colorado | Aurora | I-225/Yale to Cornell | Block | I | 1999 | 6,160 | 12.0 | 20 | 1,496,241 |
Colorado | Aurora | SH 30/Jasper -Airport | Block | I | 1998 | 3,690 | 8.0 | 17 | 489,389 |
Colorado | Aurora | US40 Peoria to Potomac | Wood/Unspecified | I | 2004 | 440 | 6.0 | 12 | 31,730 |
Colorado | Boulder | 47th Street Parkway | Berm Only | I | 1972 | 2,847 | 3.0 | 7 | 61,071 |
Colorado | Boulder | 47th Street Parkway | Comb/Berm/Concrete | I | 1978 | 16,574 | 7.0 | 6 | 652,850 |
Colorado | Boulder | SH 93 | Wood/Unspecified | I | 1983 | 1,699 | 7.0 | 15 | 172,522 |
Colorado | Boulder | US 287 Beacon Hills | Block | I | 1998 | 1,437 | 9.0 | 114 | 1,473,149 |
Colorado | Boulder | US 287 Lafayette Autm | Block | I | 1998 | 876 | 12.0 | 81 | 848,394 |
Colorado | Boulder | US 287 Lafayette Byps | Block | I | 1997 | 8,498 | 11.0 | 20 | 1,888,655 |
Colorado | Broomfield | SH 287 | Brick | I | 1993 | 1,027 | 15.0 | 38 | 589,222 |
Colorado | Castle Rock | I-25 Exit 184 | Comb/Berm/Block | I | 1999 | 1,600 | 14.0 | 34 | 755,426 |
Colorado | Colorado Springs | I-25 | Concrete/Precast | I | 1992 | 548 | 10.0 | 55 | 303,327 |
Colorado | Colorado Springs | I-25 Harrison HS | Concrete/Unspecified | I | 2000 | 1,380 | 16.0 | 43 | 953,524 |
Colorado | Colorado Springs | I-25 Woodmen Interchan | ge Comb/Berm/Concrete | I | 2003 | 1,018 | 16.0 | 53 | 856,681 |
Colorado | Colorado Springs | I-25/Bijou to Filmore | Concrete/Precast | I | 1999 | 11,000 | 20.0 | 36 | 7,929,077 |
Colorado | Colorado Springs | I-255 | Conrete/Precast | I | 2001 | 3,500 | 12.0 | 16 | 669,152 |
Colorado | Colorado Springs | I-255 | Comb/Berm/Concrete | I | 2003 | 1,018 | 21.0 | 40 | 856,681 |
Colorado | Colorado Springs | I-255 | Conrete/Precast | I | 2005 | 766 | 10.0 | 60 | 458,126 |
Colorado | Colorado Springs | I-255 | Conrete/Precast | I | 2005 | 2,717 | 20.0 | 28 | 1,500,335 |
Colorado | Colorado Springs | I-255 | Conrete/Precast | I | 2007 | 1,917 | 20.0 | 26 | 997,080 |
Colorado | Colorado Springs | I-255 | Berm Only | I | 2007 | 644 | 20.0 | 22 | 280,232 |
Colorado | Colorado Springs | I-255 | Conrete/Precast | I | 2007 | 1,013 | 20.0 | 28 | 558,365 |
Colorado | Colorado Springs | I-255 | Conrete/Precast | I | 2007 | 1,010 | 20.0 | 6 | 125,947 |
Colorado | Colorado Springs | Union Boulevard | Metal/Unspecified | I | 1982 | 1,305 | 13.0 | 11 | 185,991 |
Colorado | Colorado Springs | US 24/Brant Hollow | Berm Only | I | 1993 | 500 | 10.0 | 8 | 39,424 |
Colorado | Denver | Almeda Avenue | Berm Only | I | 1980 | 2,624 | 3.0 | 7 | 57,020 |
Colorado | Denver | C-470 | Wood/Unspecified | I | 1982 | 3,116 | 11.0 | 6 | 198,806 |
Colorado | Denver | C-470 | Wood/Unspecified | I | 1986 | 2,066 | 3.0 | 18 | 108,482 |
Colorado | Denver | I-225 | Wood/Unspecified | I | 1975 | 4,162 | 10.0 | 5 | 227,795 |
Colorado | Denver | I-225 | Wood/Unspecified | II | 1987 | 4,051 | 10.0 | 11 | 453,053 |
Colorado | Denver | I-225 DTC | Concrete/ Precast | I | 2003 | 2,305 | 13.0 | 32 | 951,212 |
Colorado | Denver | I-225 DTC | Concrete/ Precast | I | 2004 | 2,685 | 12.0 | 31 | 992,323 |
Colorado | Denver | I-225 Orchard | Concrete/ Precast | I | 2004 | 575 | 6.0 | 31 | 106,254 |
Colorado | Denver | I-225 Quincy | Concrete/ Precast | I | 2004 | 1,895 | 13.0 | 31 | 758,718 |
Colorado | Denver | I-225 Ulster | Concrete/ Precast | I | 2004 | 1,000 | 11.0 | 31 | 338,782 |
Colorado | Denver | I-225 Yosemite | Concrete/ Precast | I | 2004 | 1,740 | 10.0 | 31 | 535,892 |
Colorado | Denver | I-225/I-25 | Concrete/ Precast | I | 2004 | 1,050 | 15.0 | 31 | 485,074 |
Colorado | Denver | I-25 | Wood/Unspecified | I | 1975 | 4,730 | 10.0 | 5 | 258,849 |
Colorado | Denver | I-25 | Wood/Unspecified | I | 1976 | 321 | 10.0 | 5 | 15,793 |
Colorado | Denver | I-25 | Comb/Wood/Metal | I | 1978 | 2,480 | 7.0 | 14 | 246,514 |
Colorado | Denver | I-25 | Comb/Berm/Wood | I | 1978 | 1,876 | 10.0 | 7 | 131,382 |
Colorado | Denver | I-25 | Wood/Unspecified | U | 1979 | 3,729 | 7.0 | 10 | 257,911 |
Colorado | Denver | I-25 | Comb/Wood/Block | II | 1979 | 10,709 | 10.0 | 14 | 1,481,231 |
Colorado | Denver | I-25 | Wood/Unspecified | U | 1979 | 5,569 | 13.0 | 6 | 460,823 |
Colorado | Denver | I-25 | Wood/Unspecified | II | 1981 | 3,838 | 10.0 | 7 | 271,005 |
Colorado | Denver | I-25 | Comb/Wood/Metal | II | 1981 | 12,792 | 10.0 | 10 | 1,235,857 |
Colorado | Denver | I-25 | Wood/Unspecified | U | 1982 | 3,847 | 13.0 | 12 | 600,140 |
Colorado | Denver | I-25 | Wood/Unspecified | II | 1984 | 9,512 | 11.0 | 7 | 776,728 |
Colorado | Denver | I-25 | Wood/Unspecified | II | 1984 | 1,673 | 13.0 | 43 | 931,766 |
Colorado | Denver | I-25 | Wood/Unspecified | II | 1987 | 1,453 | 12.0 | 12 | 210,523 |
Colorado | Denver | I-25 | Comb/Berm/Wood/Metal | II | 1989 | 8,531 | 12.0 | 12 | 1,215,072 |
Colorado | Denver | I-25 | Wood/Unspecified | I | 1992 | 161 | 10.0 | 13 | 20,583 |
Colorado | Denver | I-25 | Comb/Concrete/Block | I | 1993 | 285 | 13.0 | 43 | 160,652 |
Colorado | Denver | I-25 Butchel | Concrete/ Precast | I | 2003 | 6,175 | 12.0 | 32 | 2,352,238 |
Colorado | Denver | I-25 Butchel | Concrete/ Precast | I | 2003 | 3,150 | 12.0 | 32 | 1,199,927 |
Colorado | Denver | I-25 Colorado | Concrete/ Precast | I | 2004 | 1,775 | 10.0 | 31 | 546,671 |
Colorado | Denver | I-25 Dartmouth | Concrete/ Precast | I | 2004 | 2,760 | 14.0 | 31 | 1,190,049 |
Colorado | Denver | I-25 Downing | Concrete/ Precast | I | 2003 | 1,575 | 12.0 | 32 | 599,964 |
Colorado | Denver | I-25 DU | Concrete/ Precast | I | 2004 | 145 | 18.0 | 31 | 80,384 |
Colorado | Denver | I-25 Eastmoor | Concrete/ Precast | I | 2004 | 750 | 14.0 | 31 | 323,383 |
Colorado | Denver | I-25 Emerson | Concrete/ Precast | I | 2003 | 425 | 12.0 | 32 | 161,895 |
Colorado | Denver | I-25 Evans | Concrete/ Precast | I | 2004 | 4,010 | 12.0 | 31 | 1,482,017 |
Colorado | Denver | I-25 Evans | Concrete/ Precast | I | 2004 | 4,410 | 14.0 | 31 | 1,901,491 |
Colorado | Denver | I-25 Hampden | Concrete/ Precast | I | 2004 | 3,350 | 12.0 | 31 | 1,238,094 |
Colorado | Denver | I-25 Hampden Ramp | Concrete/ Precast | I | 2004 | 425 | 12.0 | 31 | 157,072 |
Colorado | Denver | I-25 Ohio | Concrete/ Precast | I | 2003 | 625 | 12.0 | 32 | 238,081 |
Colorado | Denver | I-25 Princeton | Concrete/ Precast | I | 2004 | 3,075 | 14.0 | 31 | 1,325,870 |
Colorado | Denver | I-25 Quincy | Concrete/ Precast | I | 2004 | 1,675 | 14.0 | 31 | 722,222 |
Colorado | Denver | I-25 South HS | Berm only | I | 2003 | 1,440 | 12.0 | 11 | 184,693 |
Colorado | Denver | I-25 University | Concrete/ Precast | I | 2004 | 4,925 | 12.0 | 31 | 1,820,183 |
Colorado | Denver | I-25 University | Concrete/ Precast | I | 2004 | 920 | 16.0 | 31 | 453,352 |
Colorado | Denver | I-25 University Bridge | Concrete/ Precast | I | 2004 | 1,500 | 8.0 | 31 | 369,580 |
Colorado | Denver | I-25 Veterans Park | Concrete/ Precast | I | 2004 | 4,345 | 12.0 | 31 | 1,605,827 |
Colorado | Denver | I-25 Yale | Concrete/ Precast | I | 2004 | 4,795 | 6.0 | 31 | 886,069 |
Colorado | Denver | I-25 Yale | Concrete/ Precast | I | 2004 | 580 | 14.0 | 31 | 250,083 |
Colorado | Denver | I-25 Yale Ramp | Concrete/ Precast | I | 2004 | 1,580 | 12.0 | 31 | 583,937 |
Colorado | Denver | I-25/Hampden-Quincy | Concrete/Precast | II | 1999 | 4,700 | 12.0 | 27 | 1,537,890 |
Colorado | Denver | I-25/I-70 Interchange | Concrete/Precast | I | 1992 | 1,450 | 16.0 | 21 | 497,324 |
Colorado | Denver | I-70 | Wood/Unspecified | II | 1979 | 9,177 | 7.0 | 14 | 889,691 |
Colorado | Denver | I-70 | Comb/Wood/Metal | I | 1980 | 7,849 | 10.0 | 7 | 545,783 |
Colorado | Denver | I-70 | Comb/Wood/Concrete | I | 1980 | 2,811 | 13.0 | 11 | 390,921 |
Colorado | Denver | I-70 | Wood/Unspecified | I | 1982 | 5,248 | 13.0 | 23 | 1,556,641 |
Colorado | Denver | I-70 | Comb/Berm/Wood/Metal | II | 1987 | 2,949 | 12.0 | 22 | 788,175 |
Colorado | Denver | I-70 | Concrete/Precast | I | 1990 | 3,624 | 7.0 | 20 | 505,351 |
Colorado | Denver | I-70 | Absorptive | I | 1990 | 620 | 7.0 | 28 | 121,989 |
Colorado | Denver | I-70 | Concrete/Precast | I | 1990 | 499 | 7.0 | 27 | 93,272 |
Colorado | Denver | I-70 Washington St | Concrete/Precast | I | 2001 | 285 | 10.0 | 24 | 67,573 |
Colorado | Denver | I-76 | Wood/Unspecified | I | 1978 | 7,856 | 7.0 | 12 | 672,897 |
Colorado | Denver | I-76 | Wood/Unspecified | I | 1980 | 2,657 | 10.0 | 11 | 302,357 |
Colorado | Denver | I-76 | Comb/Other | I | 1985 | 4,002 | 10.0 | 9 | 378,125 |
Colorado | Denver | I-76 | Comb/Wood/Metal | I | 1987 | 3,805 | 12.0 | 10 | 447,146 |
Colorado | Denver | I-76 | Wood/Unspecified | I | 1988 | 564 | 12.0 | 7 | 50,429 |
Colorado | Denver | Iliff Ave | Wood/Unspecified | I | 1984 | 787 | 7.0 | 10 | 54,177 |
Colorado | Denver | Kipling St | Wood/Unspecified | I | 1985 | 1,902 | 10.0 | 5 | 89,473 |
Colorado | Denver | Kipling St | Wood/Unspecified | I | 1987 | 335 | 6.0 | 11 | 21,720 |
Colorado | Denver | Kipling St | Wood/Unspecified | I | 1987 | 371 | 10.0 | 9 | 34,484 |
Colorado | Denver | Kipling St | Wood/Unspecified | I | 1989 | 987 | 10.0 | 8 | 76,974 |
Colorado | Denver | Mississippi | Block | I | 1993 | 915 | 9.0 | 41 | 335,924 |
Colorado | Denver | Potomac Boulevard | Wood/Unspecified | I | 1978 | 2,309 | 7.0 | 4 | 63,526 |
Colorado | Denver | S Kipling | Wood/Unspecified | I | 1978 | 4,608 | 7.0 | 10 | 308,308 |
Colorado | Denver | SH 285 | Concrete/Unspecified | I | 1994 | 125 | 9.0 | 65 | 72,953 |
Colorado | Denver | SH 285 | Comb/Concrete/Block | I | 1994 | 3,355 | 11.0 | 19 | 694,135 |
Colorado | Denver | SH 391 | Wood/Unspecified | I | 1980 | 1,082 | 10.0 | 8 | 83,459 |
Colorado | Denver | SH 391 | Wood/Unspecified | I | 1982 | 394 | 10.0 | 7 | 29,147 |
Colorado | Denver | SH 75 | Wood/Unspecified | I | 1987 | 1,788 | 8.0 | 14 | 195,090 |
Colorado | Denver | SH 83 | Wood/Unspecified | I | 1977 | 600 | 10.0 | 6 | 34,931 |
Colorado | Denver | SH 83 | Wood/Unspecified | I | 1983 | 1,312 | 11.0 | 8 | 120,428 |
Colorado | Denver | SH 83 | Wood/Unspecified | I | 1984 | 328 | 7.0 | 7 | 16,906 |
Colorado | Denver | SH 83 | Wood/Unspecified | I | 1984 | 1,082 | 10.0 | 10 | 106,433 |
Colorado | Denver | SH 83/SH 88 | Concrete/Precast | I | 2006 | 2,064 | 12.0 | 8 | 200,503 |
Colorado | Denver | SH 85 | Wood/Unspecified | I | 1994 | 420 | 11.0 | 12 | 54,096 |
Colorado | Denver | SH 85 | Concrete/Precast | I | 1994 | 1,099 | 13.0 | 22 | 312,059 |
Colorado | Denver | SH 88 | Wood/Unspecified | I | 1984 | 1,542 | 10.0 | 6 | 95,098 |
Colorado | Denver | SH 88 | Wood/Unspecified | I | 1986 | 295 | 10.0 | 8 | 22,875 |
Colorado | Denver | SH 88 | Wood/Unspecified | I | 1987 | 256 | 8.0 | 12 | 25,338 |
Colorado | Denver | SH 88 | Wood/Unspecified | I | 1988 | 403 | 8.0 | 8 | 27,129 |
Colorado | Denver | SH 95 | Wood/Unspecified | I | 1975 | 2,230 | 10.0 | 4 | 97,377 |
Colorado | Denver | US 285 | Wood/Unspecified | II | 1974 | 1,246 | 10.0 | 5 | 61,399 |
Colorado | Denver | US 285 | Wood/Unspecified | II | 1981 | 85 | 10.0 | 14 | 12,087 |
Colorado | Denver | US 36 | Wood/Unspecified | I | 1988 | 4,562 | 12.0 | 11 | 588,677 |
Colorado | Denver | US 36 | Comb/Berm/Wood/Metal | I | 1989 | 4,152 | 8.0 | 29 | 973,082 |
Colorado | Denver | US 36 | Comb/Berm/Wood | I | 1989 | 4,553 | 12.0 | 12 | 650,979 |
Colorado | Denver | US 36 | Comb/Berm/Wood | I | 1989 | 7,649 | 12.0 | 11 | 964,327 |
Colorado | Denver | US 36 | Comb/Berm/Wood | I | 1989 | 3,634 | 12.0 | 12 | 521,311 |
Colorado | Denver | US 6/Knox to Sheridan | Comb/Other | II | 1999 | 7,370 | 8.0 | 39 | 2,272,866 |
Colorado | Denver | US 85 | Concrete/Precast | I | 1992 | 1,558 | 13.0 | 24 | 490,511 |
Colorado | Denver | W 6th Avenue | Wood/Unspecified | I | 1979 | 4,074 | 7.0 | 14 | 394,923 |
Colorado | Dillon | I-70 Dillon Valley | Concrete/Precast | I | 2003 | 4,993 | 10.0 | 44 | 2,201,780 |
Colorado | Douglas Co | I-25 Castle Pines N | Comb/Berm/Concrete | I | 2000 | 2,800 | 16.0 | 11 | 507,064 |
Colorado | Douglas Co | I-25 Surrey Ridge N | Berm Only | I | 2000 | 2,600 | 16.0 | 6 | 260,252 |
Colorado | Douglas Co | I-25 Surrey Ridge S | Berm Only | I | 2000 | 3,450 | 16.0 | 6 | 345,781 |
Colorado | Douglas Co | SH 83 | Wood/Unspecified | I | 1990 | 1,899 | 10.0 | 5 | 99,690 |
Colorado | Eagle Co | SH 82/MP 19.2-19.5 | Berm Only | I | 1993 | 1,600 | 15.0 | 0 | 0 |
Colorado | Eagle Co | SH 82/MP 19.5-19.7 | Berm Only | I | 1993 | 1,050 | 8.0 | 0 | 0 |
Colorado | El Rancho | SH 74 | Comb/Other | I | 1994 | 620 | 8.0 | 106 | 525,663 |
Colorado | Fountain | I-25 Fountain Interchange | Block | I | 2003 | 3,500 | 12.0 | 15 | 646,817 |
Colorado | Garfield | SH 82, Rnch Roar Fork | Concrete/Precast | I | 1998 | 2,900 | 3.0 | 0 | 0 |
Colorado | Garfield Co | SH 82/MP17.0-17.4 | Berm Only | I | 1993 | 2,115 | 8.0 | 0 | 0 |
Colorado | Golden | SH 470 @ US 6 | Concrete/Precast | I | 2000 | 2,150 | 10.0 | 29 | 623,139 |
Colorado | Grand Junction | SH 50 | Concrete/Precast | I | 2007 | 290 | 12.0 | 64 | 222,506 |
Colorado | Grnwd Vilg/Cherry Hills Vilg | SH 88 (Beleview) | Comb/Other | I | 1990 | 331 | 7.0 | 8 | 19,577 |
Colorado | Idaho Springs | I-70 | Wood/Post & Plank | II | 1993 | 1,292 | 15.0 | 104 | 2,010,615 |
Colorado | Jefferson | C-470, 1M E Wadsworth | Block | I | 1998 | 1,230 | 12.0 | 94 | 1,392,995 |
Colorado | Jefferson | I-70 20th-32nd Ave | Block | II | 1996 | 3,700 | 12.0 | 56 | 2,496,360 |
Colorado | Jefferson | I-70 28th-32nd Ave | Block | II | 1996 | 1,581 | 12.0 | 132 | 2,496,360 |
Colorado | Jefferson | I-70, 20th-26th | Block | II | 1996 | 3,700 | 12.0 | 56 | 2,496,360 |
Colorado | Jefferson Co | I-70 | Comb/Other | II | 1995 | 361 | 13.0 | 64 | 301,584 |
Colorado | Jefferson Co | I-70 | Comb/Concrete/Block | II | 1995 | 9,509 | 14.0 | 29 | 3,915,697 |
Colorado | Jefferson Co. | 72nd Avenue Pierce to | Block | I | 2004 | 6,973 | 13.0 | 48 | 4,336,889 |
Colorado | Lafayette | SH 287 | Brick | I | 1995 | 8,492 | 12.0 | 20 | 2,023,448 |
Colorado | Lakewood | US 285 @ SH 121 | Comb/Metal/Concrete | I | 1986 | 230 | 5.0 | 56 | 64,505 |
Colorado | Lakewood | US 6/Sheridan-Wadswor | Concrete/Precast | II | 2001 | 12,000 | 12.0 | 21 | 3,007,687 |
Colorado | LaPlata | US160 Grandview | Wood/Unspecified | I | 2005 | 450 | 10.0 | 10 | 46,147 |
Colorado | Larimer Co. | SH287 | Block | I | 2004 | 361 | 8.0 | 25 | 73,295 |
Colorado | Larimer Co. | SH287 | Block | I | 2004 | 3,152 | 11.0 | 26 | 901,522 |
Colorado | Larimer Co. | SH287 | Block | I | 2004 | 860 | 13.0 | 23 | 261,285 |
Colorado | Littleton | US85 | Concrete/Unspecified | I | 2003 | 2,400 | 5.0 | 16 | 190,013 |
Colorado | Lochbuie (Rural) | I-76 | Comb/Berm/Concrete | I | 1981 | 1,099 | 10.0 | 7 | 72,408 |
Colorado | Longmont | SH119 | Block | I | 2003 | 516 | 10.0 | 21 | 109,163 |
Colorado | Northglenn/Thorton/Westmnstr | 120th Ave (Faus 1754) | Wood/Unspecified | I | 1990 | 3,870 | 7.0 | 7 | 203,037 |
Colorado | Parker | SH 83 | Wood/Unspecified | I | 1987 | 203 | 8.0 | 12 | 19,624 |
Colorado | Parker | SH 83 | Wood/Unspecified | I | 1993 | 991 | 7.0 | 10 | 66,363 |
Colorado | Pitkin Co | SH 82 MP 25.4-25.8 | Block | I | 2001 | 2,100 | 6.0 | 54 | 684,202 |
Colorado | Pitkin Co | SH 82 MP 25.6-25.7 | Wood/Unspecified | I | 2001 | 290 | 8.0 | 11 | 26,415 |
Colorado | Pitkin Co | SH 82 MP 26.5 | Berm Only | I | 1999 | 300 | 6.0 | 0 | 0 |
Colorado | Pitkin Co | SH 82 MP 30.9 | Block | I | 1999 | 120 | 8.0 | 35 | 33,390 |
Colorado | Pueblo | I-25 | Block | II | 1988 | 1,958 | 12.0 | 16 | 386,126 |
Colorado | Pueblo | I-25, Tray Avenue | Wood/Unspecified | I | 1975 | 1,335 | 10.0 | 4 | 50,896 |
Colorado | Pueblo | SH 47/Murphy to Troy | Concrete/Precast | I | 1999 | 8,000 | 10.0 | 63 | 5,020,672 |
Colorado | Silver Plume | I-70 Exit 226 | Other | II | 1995 | 1,215 | 13.0 | 40 | 624,083 |
Colorado | Steamboat Springs | US 40 | Concrete/Unspecified | I | 1989 | 460 | 3.0 | 53 | 73,423 |
Colorado | Summit | I-70/E of Silverthorn | Berm Only | II | 1998 | 2,601 | 15.0 | 0 | 0 |
Colorado | Summit | SH9 Farmers Korner | Comb/Berm/Block | I | 2008 | 275 | 11.0 | 113 | 342,963 |
Colorado | Thornton | Col Blvd/Welby-103rd | Concrete/Unspecified | I | 1999 | 1,600 | 10.0 | 47 | 748,451 |
Colorado | Thornton | I-25/88th to 90th | Block | II | 1998 | 1,250 | 13.0 | 35 | 561,818 |
Colorado | Vail | I-70 | Concrete/Unspecified | I | 1984 | 656 | 10.0 | 149 | 977,489 |
Colorado | Vail | I-70 MP 179 | Berm Only | O | 2000 | 1,700 | 10.0 | 22 | 366,552 |
Colorado | Vail Pass (Rural) | I-70 | Wood/Unspecified | I | 1977 | 1,706 | 7.0 | 12 | 141,496 |
Colorado | Westminster | US 36 | Comb/Berm/Wood | I | 1991 | 6,544 | 13.0 | 10 | 833,876 |
Colorado | Westminster | US 36 | Comb/Berm/Wood | I | 1992 | 2,722 | 7.0 | 15 | 285,893 |
Colorado | Westminster | US 36 | Comb/Berm/Wood | I | 1992 | 2,057 | 10.0 | 12 | 240,360 |
Colorado | Westminster | US 36 | Comb/Berm/Wood | I | 1992 | 7,131 | 13.0 | 10 | 929,278 |
Colorado | Westminster | US 36 Bronco Rd | Block | I | 1999 | 670 | 12.0 | 26 | 211,134 |
Colorado | Westminster | US 36 East of Pecos | Block | I | 1999 | 1,980 | 12.0 | 26 | 629,492 |
Colorado | Westminster | US 36 Pecos Interchnge | Block | I | 2000 | 10,550 | 12.0 | 25 | 3,176,786 |
Colorado | Westminster/Adams | Federal Blvd / 80th | Block | I | 2006 | 321 | 9.0 | 40 | 115,775 |
Colorado | Westminster/Adams | Federal Blvd / 80th | Block | I | 2006 | 321 | 9.0 | 40 | 115,775 |
Colorado | Wheat Ridge | I-70 East of Tabor | Concrete/Precast | II | 2000 | 5,010 | 11.0 | 25 | 1,357,018 |
Colorado | Wheat Ridge | I-70/Kipling to Field | Concrete/Precast | I | 2000 | 3,530 | 12.0 | 30 | 1,264,605 |
Subtotal | 562,424 | 142,888,044 |