Summary of Noise Barriers Constructed by December 31, 2010

Georgia | Hawaii | Idaho | Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine

Georgia | Hawaii | Idaho | Illinois | Indiana | Iowa | Kansas | Kentucky | Louisiana | Maine

Georgia

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Georgia Atlanta I-285 Metal/Unspecified I 1981 3,100 10.0 18 557,405
Georgia Atlanta I-285 Metal/Unspecified I 1981 2,598 10.0 20 526,354
Georgia Atlanta I-285 Metal/Unspecified I 1981 2,598 10.0 18 468,759
Georgia Atlanta I-285 Metal/Unspecified I 1981 954 13.0 22 267,417
Georgia Atlanta I-285 Metal/Unspecified I 1983 1,978 7.0 13 178,790
Georgia Atlanta I-285 Metal/Unspecified I 1983 2,978 13.0 16 615,891
Georgia Atlanta I-285 Metal/Unspecified I 1983 3,264 13.0 12 491,022
Georgia Atlanta I-285 Metal/Unspecified I 1983 2,549 13.0 12 385,019
Georgia Atlanta I-285 Metal/Unspecified II 1984 397 10.0 7 28,817
Georgia Atlanta I-285 Wood/Unspecified II 1986 1,771 10.0 33 580,682
Georgia Atlanta I-285 Metal/Unspecified II 1986 751 10.0 37 279,783
Georgia Atlanta I-75 Concrete/Precast I 1982 1,171 13.0 8 123,686
Georgia Atlanta I-75 Concrete/Precast I 1982 1,099 16.0 18 317,148
Georgia Atlanta I-75 Metal/Unspecified I 1983 4,749 10.0 16 758,683
Georgia Atlanta I-75 Metal/Unspecified I 1986 1,299 10.0 13 172,051
Georgia Atlanta I-75 Metal/Unspecified I 1986 2,060 10.0 13 276,665
Georgia Atlanta I-75 Metal/Unspecified I 1989 600 7.0 12 49,554
Georgia Atlanta I-75 Metal/Unspecified I 1989 380 10.0 11 41,229
Georgia Atlanta I-75 Metal/Unspecified I 1989 2,099 11.0 7 157,498
Georgia Atlanta I-75 Metal/Unspecified I 1989 922 13.0 8 93,545
Georgia Atlanta I-75 Metal/Unspecified I 1989 2,299 16.0 6 230,667
Georgia Atlanta I-75 Metal/Unspecified I 1989 1,850 20.0 5 181,699
Georgia Atlanta I-75/I-85 Metal/Unspecified I 1989 1,725 16.0 23 636,436
Georgia Atlanta I-75/I-85 Metal/Unspecified I 1989 689 16.0 23 258,654
Georgia Atlanta I-85 Concrete/Precast I 1980 2,450 10.0 24 576,526
Georgia Atlanta I-85 Concrete/Precast I 1980 899 13.0 19 224,862
Georgia Atlanta I-85 Metal/Unspecified I 1981 954 10.0 14 133,436
Georgia Atlanta I-85 Concrete/Precast I 1982 2,299 13.0 27 804,848
Georgia Atlanta I-85 Concrete/Precast I 1982 951 16.0 20 300,834
Georgia Atlanta I-85 Metal/Unspecified I 1983 649 10.0 28 183,359
Georgia Bibb I-75 Metal/Unspecified I 2010 2,103 35.0 52 3,860,000
Georgia Bryan I-95 Metal/Unspecified II 2001 2,188 15.0 24 782,206
Georgia Bryan I-95 Metal/Unspecified I 2001 2,165 15.0 15 496,695
Georgia Bryan/Chatham I-95 Metal/Unspecified I 1995 2,165 12.0 18 454,980
Georgia Clayton I-75 Metal/Unspecified II 2001 18,166 15.0 14 3,760,275
Georgia Clayton I-75 Metal/Unspecified I 2008 204 15.0 15 46,396
Georgia Clayton I-75 Metal/Unspecified I 2008 147 15.0 15 33,432
Georgia Clayton I-75 Metal/Unspecified I 2008 193 15.0 15 43,894
Georgia Clayton I-75 Metal/Unspecified I 2008 1,269 15.0 15 288,607
Georgia Columbia SR 104 Metal/Unspecified II 2008 435 7.0 15 46,168
Georgia Columbia SR 104 Metal/Unspecified II 2008 864 7.0 15 91,699
Georgia Columbia SR 104 Metal/Unspecified II 2008 305 8.0 15 36,995
Georgia Columbia SR 104 Metal/Unspecified II 2008 450 8.0 15 54,583
Georgia Columbia SR 104 Metal/Unspecified II 2008 265 8.0 15 32,143
Georgia Columbia SR 104 Metal/Unspecified II 2008 228 9.0 15 31,112
Georgia Columbia SR 104 Metal/Unspecified II 2008 357 9.0 15 48,715
Georgia Columbia SR 104 Metal/Unspecified II 2008 268 10.0 15 40,634
Georgia Columbia SR 104 Metal/Unspecified II 2008 169 15.0 15 38,435
Georgia Columbia SR 104 Metal/Unspecified II 2008 548 26.0 15 216,027
Georgia DeKalb I-20 Metal/Unspecified I 2003 2,886 15.0 21 894,137
Georgia DeKalb I-20 Metal/Unspecified II 2004 19,574 15.0 16 4,797,654
Georgia DeKalb I-20E Metal/Unspecified I 1995 4,448 10.0 18 796,829
Georgia DeKalb I-20E Metal/Unspecified I 1995 1,401 12.0 17 280,063
Georgia DeKalb I-20E Metal/Unspecified I 1995 1,250 16.0 18 364,089
Georgia DeKalb I-285N Metal/Unspecified I 1995 2,998 15.0 17 771,961
Georgia Fulton GA 400 Comb/Berm/Metal I 1991 20,595 39.0 13 1,032,134
Georgia Fulton I 75 Metal/Unspecified II 2006 1,900 18.0 16 553,779
Georgia Fulton I 75 Metal/Unspecified II 2006 4,320 20.0 16 1,399,019
Georgia Fulton I 75 Metal/Unspecified II 2007 2,709 14.0 16 597,083
Georgia Fulton I 75 Metal/Unspecified II 2007 1,650 16.0 16 415,625
Georgia Fulton I 75 Metal/Unspecified II 2007 3,000 20.0 16 944,602
Georgia Fulton I 75 Metal/Unspecified II 2007 5,400 20.0 16 1,700,283
Georgia Fulton I 75 Metal/Unspecified II 2007 3,250 30.0 16 1,534,978
Georgia Fulton I-20 Comb/Berm/Metal I 1990 8,489 20.0 8 1,316,263
Georgia Fulton I-285N Metal/Unspecified I 1995 2,299 10.0 18 415,279
Georgia Fulton I-285N Metal/Unspecified I 1995 1,801 12.0 18 389,553
Georgia Fulton I-285N Metal/Unspecified I 1995 1,548 15.0 13 305,439
Georgia Fulton I-75 Metal/Unspecified II 2004 9,874 15.0 15 2,249,928
Georgia Fulton SR 400 Metal/Unspecified II 2001 9,110 15.0 16 2,242,916
Georgia Fulton SR 400 Metal/Unspecified II 2008 1,933 18.0 17 586,160
Georgia Fulton SR 400 Metal/Unspecified II 2008 1,187 18.0 12 251,961
Georgia Fulton SR 400 Metal/Unspecified II 2008 2,127 18.0 14 548,240
Georgia Glynn I-95 Metal/Unspecified I 2004 2,400 10.0 17 414,793
Georgia Glynn I-95 Metal/Unspecified I 2004 3,700 12.0 18 803,661
Georgia Glynn I-95 Metal/Unspecified I 2004 5,500 14.0 15 1,127,902
Georgia Hall Thurman Tanner Parkway Metal/Unspecified I 2008 700 19.0 17 223,386
Georgia Monroe/Bibb I-475 Metal/Unspecified I 2002 11,875 15.0 15 2,714,011
Georgia Muscogee I-185 Metal/Unspecified I 1998 2,148 20.0 17 722,367
Georgia Muscogee I-185 Metal/Unspecified I 1998 2,968 20.0 17 998,932
Georgia Muscogee I-185 Metal/Unspecified I 1998 1,807 20.0 17 608,309
Georgia   Muscogee I-185 Metal/Unspecified II 2001 9,857 10.0 46 4,491,727
Georgia   Muscogee I-185 Metal/Unspecified II 2001 9,856 15.0 13 1,928,413
Georgia   Richmond I-520 Concrete/Unspecified I 1994 649 10.0 19 120,558
Georgia   Richmond I-520 Concrete/Unspecified I 1994 449 10.0 19 83,463
Georgia   Richmond I-520 Concrete/Unspecified I 1994 230 10.0 19 42,659
Georgia   Richmond I-520 Concrete/Unspecified I 1994 1,099 10.0 19 204,021
Georgia   Richmond I-520 Concrete/Unspecified I 1994 800 10.0 19 148,379
Georgia   Richmond I-520 Concrete/Unspecified I 1994 751 10.0 19 139,105
Georgia   Richmond SR 383 Metal/Unspecified I 1999 6,554 9.0 50 2,922,570
Georgia   Richmond SR 383 Metal/Unspecified I 2001 6,553 12.0 18 1,449,172
Georgia   Tift I-75 Concrete/Unspecified I 2001 2,900 14.0 11 427,550
Subtotal
269,116  73,552,479

Page Top

Hawaii

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Hawaii   Hilo/Hawaii Rt 19 Comb/berm/concrete I 2010 200 8.0 173 277,000
Hawaii   Hilo/Hawaii Rt 30 Comb/Metal/ Concrete I 2010 5,108 7.0 46 1,651,000
Hawaii   Honolulu 7311 Concrete/Unspecified I 1996 1,141 8.0 64 588,313
Hawaii   Honolulu 83 Block I 1997 4,526 6.0 17 457,669
Hawaii   Honolulu H-1 Block I 2005 448 11.0 38 185,667
Hawaii   Honolulu H-1 Block I 2005 340 13.0 33 143,710
Hawaii   Honolulu H-1 Block I 2005 702 14.0 27 268,918
Hawaii   Honolulu H-3 Berm Only I 1992 4,510 8.0 39 1,398,148
Hawaii   Honolulu Interstate Route H-1 Comb/Concrete/Block I 2004 702 20.0 39 541,535
Subtotal
17,677  5,511,960

Page Top

Idaho

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Idaho   Ada I-84 Concrete/Precast I 2010 7,223 19.0 7 1,000,000
Idaho   Ada I-84 Concrete/Precast I 2010 832 19.0 32 500,000
Idaho   Boise/Ada I-184 Concrete/Unspecified I 1999 525 10.0 15 79,501
Idaho   Boise/Ada I-184 Block I 2001 2,725 11.0 47 1,409,593
Idaho   Boise/Ada I-184 Block I 2001 1,260 12.0 20 298,953
Idaho   Boise/Ada I-184 Block I 2001 1,152 16.0 17 314,372
Idaho   Boise/Ada I-84 Block I 1995 5,710 15.0 28 2,401,978
Idaho   Boise/Ada I-84 Berm Only S 1998 5,000 10.0 8 377,501
Idaho   Boise/Ada I-84 Block I 2001 2,320 12.0 37 1,023,152
Idaho   Boise/Ada I-84 Block I 2004 4,250 19.0 18 1,455,116
Idaho   Boise/Ada I-84 Block I 2004 5,232 19.0 17 1,679,651
Idaho   Boise/Ada Local Road Other I 2000 2,000 12.0 22 531,501
Idaho   Boise/Ada SH-55 Block I 1999 75 8.0 78 46,919
Idaho Eagle 55 Block I 1997 328 10.0 125 408,652
Idaho Eagle 55 Block I 1997 328 10.0 125 408,652
Idaho Eagle/Ada SH-44 Concrete/Precast I 1996 1,562 10.0 39 606,936
Idaho Eagle/Ada SH-55 Berm Only I 1995 10,000 8.0 0 1
Idaho Lewiston/Nez Local Block I 1997 530 14.0 63 467,675
Idaho Nampa-Caldwell/Canyon I-84B Block I 1997 700 10.0 44 306,551
Idaho Pocatello/Bannock I-15B Block S 2003 580 7.0 22 89,069
Subtotal
52,332  13,405,775

Page Top

Illinois

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Illinois Addison I-290 Comb/Berm/Wood I 1986 7,498 20.0 18 2,711,291
Illinois Addison/DuPage IL 53 Wood/Unspecified I 1990 4,369 16.0 21 1,472,540
Illinois Alsip IL 50 Concrete/Precast I 2000 3,952 17.0 14 918,433
Illinois Bartlett IL 59 Absorptive I 1993 869 15.0 25 324,248
Illinois Bethalto/Madison FAP 310 (IL 255) Concrete/Unspecified I 2004 1,263 16.0 33 676,888
Illinois Bethalto/Madison I-255 Comb/Metal/Concrete I 2005 8,852 14.0 7 868,105
Illinois Bloomington BR 55 Concrete/Precast I 2001 585 10.0 34 196,419
Illinois Bolingbrook SR 53 Wood/Glue Laminated I 1980 1,000 7.0 31 215,521
Illinois Burr Ridge I-55 Concrete/Precast I 1996 1,640 14.0 29 659,148
Illinois Centerville I-255 Metal/Unspecified I 1984 4,034 10.0 34 1,353,856
Illinois Centerville/St. Clair I-255 Comb/Wood/Concrete I 2006 4,034 14.0 19 1,057,149
Illinois Collinsville I-255 Metal/Unspecified I 1985 971 7.0 64 432,152
Illinois Cook IL 53 Wood/Unspecified I 1990 12,553 16.0 20 3,973,666
Illinois Cook Co I-294 Wood/Post & Plank T 1994 21,638 10.0 41 8,809,991
Illinois Cook Co I-294 Concrete/Precast T 1994 95,576 12.0 28 3,168,506
Illinois Cook Co I-294 Other T 1994 3,398 18.0 83 5,100,521
Illinois Cook Co I-294 Concrete/Precast T 2000 2,750 14.0 24 940,817
Illinois Cook Co I-90 Concrete/Precast S 2001 280 15.0 40 165,952
Illinois DuPage I-290 Wood/Unspecified I 1992 341 7.0 28 66,825
Illinois DuPage IL 83 Wood/Unspecified I 1991 5,232 7.0 34 1,249,103
Illinois DuPage IL 83 Wood/Unspecified I 1992 6,530 7.0 20 923,594
Illinois DuPage Co I-88 Concrete/Precast T 1999 7,400 10.0 22 1,637,483
Illinois DuPage Co IL 83 Absorptive I 2000 2,500 14.0 52 1,808,654
Illinois DuPage Co/Will Co I-355 Wood/Glue Laminated T 1988 69,661 8.0 26 1,435,216
Illinois E St. Louis I-255 Concrete/Precast I 1981 1,830 10.0 35 644,512
Illinois Elmhurst I-290 Comb/Berm/Wood I 1986 4,549 10.0 20 915,356
Illinois Elmhurst I-290 Comb/Berm/Wood I 1986 2,798 13.0 25 894,293
Illinois Elmhurst I-290 Comb/Berm/Wood I 1986 5,710 13.0 16 1,191,149
Illinois Elmhurst I-290 (ramp) Berm Only I 1985 1,840 7.0 33 427,937
Illinois Elmhurst I-290 (ramp) Wood/Glue Laminated I 1985 2,483 16.0 28 1,107,515
Illinois Elmhurst/Villa Park SR 83 Wood/Glue Laminated I 1986 5,806 7.0 12 498,002
Illinois Hanover Park/Cook US 20 Absorptive I 2004 1,566 12.0 36 683,832
Illinois Highland Park US 41 Wood/Glue Laminated I 1982 1,191 10.0 27 323,185
Illinois Highland Park US 41 Berm Only S 1983 1,200 10.0 29 353,802
Illinois Highland Park US 41 Wood/Glue Laminated I 1989 1,276 10.0 19 238,018
Illinois Highland Park US 41 Wood/Glue Laminated I 1989 1,000 14.0 19 260,144
Illinois Hillside I-290 Concrete/Precast I 2001 13,337 13.0 17 2,948,931
Illinois Joliet & Plainfield/Well I-55 Concrete/Precast I 2010 50 13.0 30 19,806
Illinois Joliet & Plainfield/Well I-55 Concrete/Precast I 2010 17,465 16.0 21 5,930,190
Illinois Joliet & Plainfield/Well I-55 Concrete/Precast I 2010 7,290 16.0 27 3,116,787
Illinois Joliet & Plainfield/Well I-55 Concrete/Precast I 2010 6,931 16.0 24 2,680,746
Illinois Lake Co/Cook Co I-94 Concrete/Precast T 1996 1,968 12.0 169 3,996,090
Illinois Lansing/Cook I-80/94 Concrete/Precast I 2007 16,299 8.0 16 2,051,439
Illinois Lansing/Cook I-80/94 Concrete/Precast I 2007 679 19.0 37 477,076
Illinois Lombard/DuPage IL 64 Absorptive I 2004 4,523 8.0 20 707,732
Illinois Moline SR 5 Comb/Berm/Wood S 1988 4,061 12.0 12 569,669
Illinois Monroe Center US 51 Concrete/Precast I 1979 2,398 20.0 23 1,086,688
Illinois O'Fallon/St. Clair I-64 Comb/Wood/Concrete I 2005 6,616 14.0 27 2,466,607
Illinois Oswego US 34 Concrete/Precast I 2001 1,163 8.0 38 358,122
Illinois Peoria I-474 Wood/Post & Plank I 1987 600 6.0 25 90,044
Illinois Peoria/Peoria I074 Concrete/Precast I 2008 1,121 16.0 56 1,08,55
Illinois Peoria/Peoria I-74 Concrete/Precast I 2005 1,120 14.0 71 1,111,541
Illinois Peoria/Peoria I-74 Concrete/Precast I 2007 2,690 12.0 78 2,508,443
Illinois Rockford US 51 Concrete/Precast I 1980 1,260 13.0 21 337,812
Illinois Rockford US 51 Concrete/Precast I 1980 3,992 13.0 25 1,288,704
Illinois Rockford US 51 Concrete/Precast I 1980 3,136 13.0 20 804,022
Illinois Rockford US 51 Concrete/Precast I 1980 3,057 16.0 21 1,005,893
Illinois Schaumburg IL 19 Absorptive I 1993 741 18.0 63 838,578
Illinois Schaumburg/Elk Grove/Roselle Elgin-O'Hare Wood/Post & Plank I 1993 15,386 16.0 21 5,233,710
Illinois South Holland/Cook I-94 Concrete/Precast I 2007 4,810 15.0 22 1,580,508
Illinois South Holland/Cook I-94 Concrete/Precast I 2007 971 26.0 24 606,608
Illinois Springfield SR 4 Berm Only I 1978 4,494 16.0 15 1,053,598
Illinois Springfield SR 4 Berm Only I 1979 1,046 7.0 6 44,427
Illinois Springfield SR 4 Comb/Other I 1979 2,080 10.0 40 841,396
Illinois Springfield SR 4 Berm Only I 1979 2,080 10.0 4 88,952
Illinois Springfield SR 4 Berm Only I 1986 1,768 10.0 7 115,785
Illinois Springfield SR 4 Berm Only I 1989 1,000 10.0 7 66,783
Illinois Springfield SR 4 Berm Only I 1989 410 10.0 7 27,371
Illinois Streamwood SR 59 Concrete/Precast I 1997 1,440 10.0 21 308,297
Illinois West Chicago/Bartlett IL 59 Absorptive I 1993 4,884 18.0 17 1,532,156
Subtotal
439,041  136,039,874

Page Top

Indiana

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Indiana Evansville I-164 Metal/Unspecified I 1989 4,700 9.0 15 649,806
Indiana Evansville I-84 Metal/Unspecified I 1992 2,573 14.0 22 774,947
Indiana Fort Wayne I-69 Comb/Wood/Concrete I 2004 34,521 14.0 19 9,173,975
Indiana Fort Wayne/Allen I-69 Concrete/Precast I 2007 21,853 15.0 17 5,650,293
Indiana Gary/Lake I-82 Comb/Wood/Concrete I 2004 3,400 15.0 23 1,175,246
Indiana Gary/Lake I-83 Comb/Wood/Concrete I 2004 2,996 16.0 23 1,104,639
Indiana Hammond I-80/I-94 Concrete/Precast I 1997 14,648 15.0 29 6,390,696
Indiana Hammond to Gary I-80/I-94 Concrete/Unspecified II 1995 33,000 16.0 33 1,751,271
Indiana Hammond/Lake I-80 Comb/Wood/Concrete I 2004 14,648 15.0 0 0
Indiana Hammond/Lake I-81 Comb/Wood/Concrete I 2004 33,000 16.0 0 0
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2006 5,900 15.0 39 3,447,254
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2006 900 17.0 71 1,079,490
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2007 13,662 15.0 35 7,136,991
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2008 5,006 13.0 30 1,959,286
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2008 4,271 14.0 31 1,866,222
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2008 4,715 14.0 31 2,054,314
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2008 1,888 15.0 31 864,441
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2008 2,213 17.0 31 1,162,071
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2008 1,291 17.0 31 679,218
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2008 5,449 18.0 3 293,687
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2009 1,786 12.0 31 654,438
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2009 5,660 12.0 30 2,053,678
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2009 2,878 12.0 30 1,041,996
Indiana Indianapolis/Marion I-465 Block I 2009 1,000 12.0 30 354,529
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2009 4,900 12.0 30 1,739,099
Indiana Indianapolis/Marion I-465 Concrete/Precast I 2009 4,976 13.0 30 1,923,729
Indiana Indianapolis/Marion I-465 Block I 2009 4,100 14.0 30 1,742,759
Indiana   Indianapolis/Marion I-465 Concrete/Precast I 2009 4,273 14.0 30 1,787,529
Indiana   Indianapolis/Marion I-465 Concrete/Precast I 2009 2,153 14.0 29 888,491
Indiana   Indianapolis/Marion I-465 Concrete/Precast I 2009 1,922 15.0 31 903,050
Indiana   Indianapolis/Marion I-465 Concrete/Precast I 2009 2,908 15.0 31 1,361,850
Indiana   Indianapolis/Marion I-465 Concrete/Precast I 2009 2,090 17.0 30 1,072,432
Indiana   Indianapolis/Marion I-465 Concrete/Precast I 2009 3,389 20.0 31 2,079,210
Indiana   Indianapolis/Marion I-465 Concrete/Precast I 2010 4,251 15.0 34 2,150,723
Indiana   Indianapolis/Marion I-65 Concrete/Precast I 2007 10,080 15.0 37 5,618,735
Indiana   Newburgh/Warrick SR 66 Block I 2010 765 13.0 30 298,350
Indiana   Sellersburg/Clark I-65 Concrete/Precast I 2007 6,322 17.0 36 3,825,994
Indiana   South Bend US 20 Concrete/Precast I 1997 8,554 18.0 25 3,901,117
Indiana   St Joseph US 20 Concrete/Unspecified I 1999 5,100 15.0 42 3,185,003
Subtotal
287,741  99,558,000

Page Top

Iowa

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Iowa   Black Hawk County US 20 Wood/Unspecified I 2004 1,830 13.0 12 281,727
Iowa   Cedar Falls/Black Hawk US 20 Wood/Post & Plank II 2001 1,831 13.0 15 351,500
Iowa   Cedar Rapids I-380 Concrete/Precast I 1979 541 13.0 37 258,319
Iowa   Cedar Rapids I-380 Comb/Berm/Concrete I 1979 344 16.0 21 117,387
Iowa   Cedar Rapids I-380 Concrete/Precast I 1979 492 16.0 30 234,834
Iowa   Cedar Rapids I-380 Concrete/Precast I 1979 443 16.0 26 181,275
Iowa   Cedar Rapids I-380 Comb/Berm/Concrete I 1979 443 23.0 17 168,424
Iowa   Cedar Rapids I-380 Berm Only I 1979 1,279 30.0 2 86,886
Iowa   Cedar Rapids Iowa 100 Berm Only I 1983 1,689 7.0 6 75,303
Iowa   Cedar Rapids Iowa 100 Berm Only I 1983 3,280 10.0 7 223,390
Iowa   Des Moines I-235 Metal/Unspecified II 1980 3,477 13.0 18 805,309
Iowa   Dubuque US 20 Wood/Post & Plank I 1995 1,246 10.0 14 178,434
Iowa   Evansdale I-380 Metal/Unspecified I 1982 144 3.0 60 26,056
Iowa   Evansdale I-380 Metal/Unspecified I 1982 6,068 13.0 12 927,880
Iowa   Keokuk US 218 Wood/Glue Laminated I 1980 984 13.0 27 345,778
Iowa   Marion/Linn Rt 100 Berm Only I 1994 1,548 15.0 4 102,010
Iowa   Marion/Linn Rt 100 Wood/Post & Plank I 1995 859 10.0 14 119,670
Iowa   Polk I-235 Concrete/Precast I 2005 1,116 10.0 32 358,475
Iowa   Polk I-235 Concrete/Precast I 2005 623 11.0 87 598,086
Iowa   Polk I-235 Concrete/Precast I 2005 1,427 13.0 76 1,405,630
Iowa   Polk I-235 Concrete/Precast I 2006 722 12.0 58 499,499
Iowa   Polk I-235 Concrete/Precast I 2006 2,133 14.0 31 921,092
Iowa   Polk I-235 Concrete/Precast I 2006 3,445 15.0 34 1,754,677
Iowa   Polk I-235 Concrete/Precast I 2007 820 10.0 359 2,946,366
Iowa   Polk I-235 Concrete/Precast I 2007 656 10.0 313 2,050,348
Iowa   Polk I-235 Concrete/Precast I 2007 607 11.0 40 265,470
Iowa   Polk I-235 Concrete/Precast I 2007 689 15.0 32 333,376
Iowa   Polk I-235 Concrete/Precast I 2007 902 15.0 135 1,826,001
Iowa   Polk I-235 Concrete/Precast I 2010 492 12.0 54 321,736
Iowa   Polk I-235 Concrete/Precast I 2010 1,312 14.0 37 676,832
Iowa   Polk I-235 Concrete/Precast I 2010 804 16.0 63 804,650
Iowa   Polk County I-235 Concrete/Precast I 2004 2,149 11.0 22 530,792
Iowa   Polk County I-235 Concrete/Precast I 2004 3,773 14.0 23 1,211,516
Iowa   Waterloo Greenhill Road Comb/Berm/Wood I 1988 731 7.0 20 102,917
Iowa   Waterloo IA 218 Concrete/Precast I 1992 2,201 10.0 25 554,107
Subtotal
51,100  21,645,753

Page Top

Kansas

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Kansas   Kansas City I-435 Comb/Berm/Concrete I 1995 6,898 15.0 28 2,918,786
Kansas   Overland Park/Johnson I-435 Concrete/Precast I 2004 3,527 13.0 45 2,060,000
Kansas   Overland Park/Johnson I-435 Concrete/Precast U 2006 1,685 11.0 17 319,148
Kansas   Overland Park/Johnson I-435 Concrete/Precast U 2006 1,796 16.0 36 1,022,898
Kansas   Overland Park/Johnson I-435 Concrete/Precast U 2006 1,835 16.0 28 833,358
Kansas   Overland Park/Johnson I-435 Concrete/Precast U 2006 2,775 17.0 31 1,464,129
Kansas   Overland Park/Johnson I-435 Concrete/Precast U 2007 2,876 13.0 17 629,233
Kansas   Overland Park/Johnson I-435 Concrete/Precast U 2007 2,292 19.0 29 1,281,521
Kansas   Overland Park/Johnson I-69 Concrete/Precast I 2010 2,342 14.0 65 2,140,136
Kansas   Overland Park/Johnson I-69 Concrete/Precast I 2010 3,152 15.0 54 2,556,272
Kansas   Overland Park/Johnson I-69 Concrete/Precast I 2010 1,400 15.0 59 1,248,412
Kansas   Overland Park/Johnson US-69 Concrete/Precast U 2007 4,130 13.0 19 1,013,794
Kansas   Overland Park/Johnson US-69 Concrete/Precast U 2007 3,256 18.0 30 1,738,279
Subtotal
37,964  19,225,966

Page Top

Kentucky

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Kentucky Alexandria/Campbell US 27 Concrete/Precast I 2007 1,190 20.0 37 892,124
Kentucky Ft. Mitchell I-75 Block I 1998 1,099 49.0 7 364,492
Kentucky Georgetown Georgetown Bypass Metal/Unspecified I 1992 1,843 13.0 36 863,128
Kentucky Hopkinsville/Christian E.T. Breathitt Parkway Concrete/Precast I 2007 716 16.0 53 605,321
Kentucky Lexington/Fayette I-75 Concrete/Precast II 2006 570 20.0 71 804,220
Kentucky Louisville I-264 Concrete/Precast I 1990 10,194 13.0 19 2,574,270
Kentucky Louisville I-264 Concrete/Precast I 1991 5,045 13.0 20 1,285,729
Kentucky Louisville I-264 Brick I 1991 6,327 13.0 20 1,633,132
Kentucky Louisville/Jefferson I-64/I-264 Concrete/Precast S 2006 4,560 14.0 29 1,835,133
Kentucky Newport I-471 Metal/Unspecified I 1980 2,549 16.0 18 717,964
Kentucky Somerset/Pulaski SW Bypass (KY 917) Comb/Berm/Concrete I 2007 1,440 12.0 6 108,380
Kentucky Somerset/Pulaski SW Bypass (KY 917) Concrete/Precast I 2007 454 20.0 35 318,707
Subtotal
35,987  12,002,600

Page Top

Louisiana

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Louisiana Alexandria I-49 Concrete/Precast I 1989 1,601 10.0 12 185,003
Louisiana Baton Rouge I-10 Concrete/Precast I 2003 11,600 21.0 32 7,854,677
Louisiana Baton Rouge I-110 Comb/Berm/Metal I 1981 4,484 13.0 11 665,491
Louisiana Baton Rouge I-110 Comb/Berm/Metal I 1981 1,489 16.0 10 249,449
Louisiana Baton Rouge I-12 Concrete/Precast I 2003 17,300 20.0 37 1,281,553
Louisiana Baton Rouge/East Baton Rouge LA 426 Concrete/Precast I 2006 993 8.0 12 98,029
Louisiana Jonesville/Catahoula US 84 Other (Modular absorptive)   2010 579 8.0 31 141,280
Louisiana Metarie/Jefferson I-10 Other (Polyethylene) I 2007 1,732 10.0 93 1,606,226
Louisiana Metarie/Jefferson I-10 Concrete/Precast I 2007 4,037 16.0 53 3,403,020
Louisiana Metarie/Jefferson I-10 Concrete/Precast I 2007 5,720 20.0 46 5,242,016
Louisiana New Orleans/Jefferson I-10 Concrete/Precast I 2004 10,058 19.0 38 7,219,096
Louisiana New Orleans/Jefferson I-10 Other (QPL-69, HDPE)   2010 9,805 7.0 22 1,530,384
Louisiana New Orleans/Jefferson I-10 Concrete/Precast   2010 8,628 16.0 59 8,144,746
Louisiana New Orleans/Orleans I-10 Concrete/Precast I 2004 8,575 22.0 32 6,120,063
Louisiana Shreveport I-49,I-20 - InnerLoop Other I 1996 25,286 11.0 23 6,296,617
Louisiana Shreveport LA 3132 Other I 1979 1,056 13.0 28 382,337
Louisiana Slidell/St. Tamany I-12 Wood/Post & Plank II 1985 4,999 10.0 8 420,332
Louisiana Slidell/St. Tammany I-12 Other (QPL-69, HDPE) II 2010 5,931 14.0 24 1,994,000
Louisiana Vidalla US 65/84 Concrete/Unspecified I 1986 699 8.0 31 175,964
Subtotal
124,572  64,544,256

Page Top

Maine

For TYPE column, I = Type I, II = Type II, S = State funds only, C = County funded, T = Tollway funded, O = Other, and U = Unknown. A "0" in the YEAR or BARRIER COST IN 2010 $ columns indicates the data is missing for a given barrier. A "1" in the BARRIER COST IN 2010 $ column indicates the barrier was constructed of excess material.
State City/County Route Material Type Year Length (feet) Height (feet) Cost ($/sq ft) Cost Current Year (2010)
Maine Bangor I-95 Wood/Post & Plank II 1998 1,141 17.0 19 375,707
Maine Kittery I-95 Berm Only I 1978 699 10.0 5 34,853
Maine South Portland/Cumberland I-295 Concrete/Precast I 2010 3,550 15.0 28 1,500,000
Subtotal
5,390  1,910,560
Updated: 06/27/2017
Updated: 6/27/2017
HEP Home Planning Environment Real Estate