U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000


Skip to content U.S. Department of Transportation/Federal Highway AdministrationU.S. Department of Transportation/Federal Highway Administration

Construction

 

Construction Program Guide

TRB Committee AFH15 Project Delivery Methods References

  • Alder, R. "UDOT Construction Manager General Contract (CMGC) Annual Report," Utah Department of Transportation Project Development Group, Engineering Services and Bridge Design Section, Salt Lake City Utah, 2007, 39pp.

  • American Association of State Highway and Transportation Officials (AASHTO), "Primer on Contracting for the 21st Century" White Paper, Subcommittee on Construction-Contract Administration Task Force, AASHTO, Washington, D.C., 1996, 38pp.

  • American Association of State Highway and Transportation Officials (AASHTO) AASHTO Guide for Design-Build Procurement, American Association of State Highway and Transportation Officials, Washington, D.C., January 2008, p. 58.

  • American Council of Consulting Engineers (ACEC), "Qualifications-Based Selection," Presentation, European Federation of Engineering Consultancy Associations Conference, Brussels, Belgium, October 2004, 40pp. http://www.fca.be/downloads/archive/e4b52f1d-0d94-4e10-ac66-f3d38a410ecb.ppt, [November 22, 2008]

  • American Institute of Architects, California Council (AIACC). Handbook on Project Delivery, American Institute of Architects, California Council, Sacramento, California, 1996, pp.

  • Anderson, S. and M.I. Schneider, Design-Build Project Delivery, American Council of Engineering Companies, Washington, D.C. 2000, 77 pp.

  • Anderson, S.D. and Damnjanovic, I., Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion, NCHRP Synthesis 379, Transportation Research Board, Washington, D.C., 2008, 77pp.

  • Anderson, S.D., and D.J. Fisher, Constructability Review Process of Transportation Facilities, National Cooperative Highway Research Program Report 390, , Transportation Research Board, National Research Council, Washington, D.C., 1997.

  • Arditi, D. and D. Lee, "Service quality performance of design/build contractors using quality function deployment," Construction Management and Economics. London: Vol. 22, Iss. 2, Feb. 2004, pp. 123-157.

  • Arizona Department of Transportation Intermodal Transportation Division (Arizona DOT), Design-Build Procurement and Administration Guide, 2nd Edition, ADOT Construction Group, Phoenix, December 2001 [Online]. Available: http://www.azdot.gov/Highways/ConstGrp/DesignBuildGuide.asp [January 24, 2007].

  • Arkansas Department of Transportation (Arkansas DOT), Design-Build Guidelines and Procedures, Little Rock, April 2006.

  • Armstrong, W.G. and Wallace, R.M. "A Case Study of Construction Management on the Boston Harbor Project, Reflections at Project Completion," CM E-Journal, Construction Management Association of America, January 2001, 22pp.

  • Associated General Contractors of America (AGC), Project Delivery Systems for Construction, Associated General Contractors of America, Washington, D.C., 2004.

  • Atkison, W., "Build quality in, don't add it on," Design/Build Business, Vol. 70, Iss. 8, October 2005, p. 44.

  • Beard, J.L., M.C. Loulakis, E.C. Wundram, Design Build Planning Through Development. McGraw-Hill, New York, 2001.

  • Beard, J.L. and R.A. Belle, Quality Assurance and Quality Control for Design-Build and Integrated Delivery Processes, Integrated Performance Report #701, Design Build Institute of America, Washington D.C., 2003, 33 pp.

  • Bearup, W, Kenig, M., and O'Donnell, J. "Alternative Delivery Methods, a Primer", Proceedings, Airport Board Members and Commissioners Annual Conference, Airports Council International - North America, 2007, Chicago, IL.

  • Blanding, J., "Quality Incentives: A Federal Perspective," Design-Build: A Quality Process Transportation Research E-Circular No. E-C090, Transportation Research Board, National Research Council, Washington, D.C., 2006, 9 pp.

  • Bourne, J., S. DeWitt, and P. Drennon, "Ensuring Quality Is Built into the Request for Proposal Process," Design-Build: A Quality Process Transportation Research E-Circular No. E-C090, Transportation Research Board, National Research Council, Washington, D.C., 2006, p. 1.

  • Bresnen, M. and Marshall, N. "Motivation, Commitment and the Use of Incentives in Partnerships and Alliances," Construction Management and Economics, Vol. 18, 2000, pp. 587-598.

  • Brinkman G. "City of Phoenix Work Plan for SEP (Special Experimental Project) 14 Construction Manager at Risk Contract Historic Streetlight Restoration," July 3, 2007, https://www.fhwa.dot.gov/programadmin/contracts/sep14azstreetlight [May 15, 2009].

  • Byrd, L.G. and A.A. Grant, "Prerequisites for a Successful Design/Build/Warranty Highway Construction Contract," A Report to the U.S. Department of Transportation, Federal Highway Administration, Washington, D.C., March 1993[Online]. Available: https://www.fhwa.dot.gov/programadmin/contracts/byrd.cfm [February 4, 2007].

  • Capka, J.R., "Memo of Major Project Guidance from FHWA Administrator to the Division administrators dated January 19, 2007," [Online]. Available: https://www.fhwa.dot.gov/programadmin/mega/011907.cfm [February 21, 2007].

  • Carlisle, J.B. Estimating Costs of Pre-Construction Services for Construction Management-at-Risk, Masters Thesis, University of Oklahoma, Norman, Oklahoma, 2006, p. 52.

  • Carpenter, B., E. Fekpe, and D. Gopalakrishna, Performance-Based Contracting for the Highway Construction Industry: An Evaluation of the Use of Innovative Contracting and Performance Specification in Highway Construction Final Report, Battelle, Columbus, Ohio, February 2003, 49 pp.

  • Carr, P.G. and P.S. Beyor "Design fees, the state of the profession, and a time for corrective action," Journal of Construction Engineering and Management, ASCE, 21(3), 2005, pp. 110-117.

  • Carter, R., O. Tomeh, G. Darido, D. Schneck, and F. Waesche, Quality Assurance and Quality Control Guidelines, Federal Transit Administration, Washington, D.C., 2002, [Online]. Available: http://www.fta.dot.gov/1311_ENG_HTML.htm [Jan. 24, 2007].

  • Collier P., M. Corbett, and B. Lundrigan, "Quality performance in a design-build mega-project," Quality Congress. ASQ's . . . Annual Quality Congress Proceedings, Milwaukee, 2001, pp. 17-26.

  • Colorado Department of Transportation (CDOT), Design-Build Manual, Denver, April 16, 2006, 46 pp.

  • Colorado Department of Transportation (CDOT), Design-Build Guidelines, Denver, August 1, 1997.

  • Construction Financial Management Association (CFMA),CFMA Annual Financial Survey, 2000, Princeton, New Jersey, p 53, http://www.cfma.org/pubs/docs/AnnualReport2000.pdf [October 14, 2008]

  • Construction Industry Institute (CII). Constructability: A Primer. Publication 3-1 (July), CII, Austin, Texas, 1986.

  • Construction Industry Institute (CII). "Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build," Research Summary RS 133-1, CII, Austin, Texas, 1997.

  • Construction Industry Institute (CII). "Owner's Tool for Project Delivery and Contract Strategy Selection," Research Summary 165, Construction Industry Institute, Austin, Texas, 2003.

  • Construction Management Association of America (CMAA), "Construction Delivery Approaches," December 13, 2007, http://www2.mvr.usace.army.mil/WaterControl/Districts/ MVR/SAME/construction/ConstructionDeliveryApproaches.pdf [May 21, 2009]

  • Construction Management Association of America (CMAA) (2003). "Speed, communication, and commissioning issues are top owner concerns, FMI/CMAA survey finds. " 2003, http://cmaanet.org/owners_survey.php, [November 24, 2008].

  • Cunningham, G. "Commissioning Large Public Projects Using Construction Manager at Risk," National Conference on Building Commissioning, New York City, May 4-6, 2005 pp. 1-14.

  • DeBacker, M. "Greener Transportation Infrastructure," Benchmark Magazine, Vol. 1(2), 2008, pp. 9-13.

  • Denzel, M. Sumitani, M., and Cohen, S. General Contractor/Construction Manager Form of Contracting: Issues and Recommendations.City of Seattle, Washington, http://www.cityofseattle.net/audit/report_files/2004-05_GCCM_Report.pdf [May 15, 2009], (2004), 26pp.

  • Department of Energy (DOE), Cost Estimating Guide DOE G 430. 1-1, Department of Energy, Washington, DC, March 28, 1997, p. 11. 1.

  • DeWitt, S., G. Yakowenko, T. Bohuslav, T. Ferguson, E. Hoelker, K. Molenaar, G. Schiess, J. Smythe, J. Triplett, and R. Wagman, Construction Management Practices in Canada and Europe, FHWA-PL-05-010, Federal Highway Administration, Washington, DC, May 2005, 72pp.

  • Doren, D., M. Bridgers, and M. Napier, FMI/CMAA Sixth Annual Survey of Owners, Construction Management Association of America,http://cmaanet.org/user_images/owners_survey_6.pdf 2005 [ November 16, 2008]

  • Drennon, P.W., "Utah's I-15, a transportation case study: Role of the owner's design professional in design/build and in the provisions for quality,"Quality Congress. ASQ's Annual Quality Congress Proceedings,Milwaukee, 1998, p. 166.

  • Dunston, P.S., J.F. McManus and J.A. Gambatese, Cost/Benefits of Constructability Reviews

  • NCHRP Project 20-7, Task 124, TRB, Washington, D. C, 2002 p. 2.

  • Eldin, N.N., "Concurrent Engineering: A Schedule Reduction Tool," Journal of Construction Engineering and Management, ASCE, 123(3),1997, pp. 354-362.

  • Ellicott, M.A. "Best-value Contracting," Proceedings, Area Engineers Conference, TransAtlantic Division, U.S. Army Corps of Engineers, Winchester, Virginia, January 15-17, 1994, pp. 17-21.

  • Ellis, R.D., Herbsman, Z. and Kumar, A., " Evaluation of the FDOT design/build program," Final Report, Submitted to Florida Dept. of Transportation, State Project No. 99700-7543-010, Department of Civil Engineering, University of Florida, Gainesville, 1991.

  • El Wardani, M., J. Messner, and M. Horman,. "Comparing Procurement Methods for Design-Build Projects," Journal of Construction Engineering and Management, ASCE 132(3), 2006.

  • Ernzen, J. and T. Feeney, "Contractor-Led Quality Control and Quality Assurance Plus Design-Build: Who Is Watching The Quality?" Transportation Research Record 1813, Transportation Research Board, National Research Council, Washington, D.C., 2002, pp. 253-259.

  • Federal Acquisition Regulation (FAR), "Two Phase Design Build Selection," Federal Register, Vol. 62, No. 1, 62 FR 271, 1997.

  • Federal Highway Administration (FHWA), "Briefing-FHWA Initiatives to Encourage Quality Through Innovative Contracting," Practices: Special Experimental Projects No. 14 (SEP-14). (2008), https://www.fhwa.dot.gov/programadmin/contracts/sep_a.cfm, [June 7, 2009].

  • Federal Highway Administration (FHWA). "Design-Build Effectiveness Study," Final Report to Congress as Required by TEA-21, US Department of Transportation, FHWA, Washington, D.C., 2006, https://www.fhwa.dot.gov/reports/designbuild/designbuild0.htm (August 30, 2008). pp. 4-9.

  • Federal Register, "Federal Highway Administration, Design-Build Contracting: Final Rule" December 10, 2002, Volume 67, No. 237, pp. 75902 - 75935.

  • Federal Transit Administration (FTA) Tri-Met's Construction Manager/General Contractor Approach Lessons Learned 44, Publication 1363, Washington DC, 2003. http://www.fta.dot.gov/printer_friendly/publications_1363.html [June 1, 2009]

  • Federal Transit Administration (FTA), Construction Project Management Handbook, Federal Transit Administration, Washington DC, 2006, p. 3-7.

  • Fernandes C. and Viegas J.M., "Private Financing of Road Infrastructure: The Portuguese Experience," Transportation Research Record 1659, Journal of the Transportation Research Board, National Academies, Washington, DC, 1999, pp. 23-31.

  • Finnish Road Administration, "Procurement Strategy of the Finnish Road Administration," Finnish Road Administration, Helsinki Finland, 2003, pp. 27-29.

  • Florida Department of Transportation (FDOT), Design-Build Guidelines, Tallahassee, February 8, 2006.

  • Gambatese, J., K. Dettwyler, D. Rogge and L. Schroeder. Oregon Public Contracting Coalition Guide to CM/GC Contracting, Oregon Public Contracting Coalition, Portland Oregon, 2002, p. 13.

  • Gharaibeh, N.G., J.W. Button, and P. Jalvi, Pavement Aspects in Design-Build Contracting for Highway Projects Synthesis of Highway Practice, Report No. TTI-2005-1, Texas Transportation Institute, Texas Department of Transportation, Austin, Texas, 2005, pp. 96.

  • Gibson, G.E., Migliaccio, G.C., and O'Connor, J.T. "Changing Project Procurement Strategy: An Implementation Framework," Sloan Industry Studies Working Paper Series, Sloan Foundation Industry Studies Annual Conference, April 26-27, Cambridge, Massachusetts., 2007, p. 20.

  • Gibson, G.E., C.I. McGinnis, W.S. Flanigan, and J.E. Wood, "Constructability in the Public Sector," Journal of Construction Engineering and Management, ASCE, Vol. 122 (3), 1996, pp. 274-280.

  • Gladke, J, "Incentives on Design-build Projects: Two Different Approaches," Design-Build: A Quality Process Transportation Research E-Circular No. E-C090, Transportation Research Board, National Research Council, Washington, D.C., 2006, p. 8.

  • Gonderinger, C., "TH 14/218 Design-Build Project Technical Memorandum Quality Management Plan (QC/QA Requirements)," Minnesota Department of Transportation Technical Memorandum, St. Paul, 2001, pp 1-17.

  • Gordon, C.M. (1994). "Choosing Appropriate Construction Contracting Method," Journal of Construction Engineering, ASCE, 120(1), p. 196-210.

  • Graham, P. Evaluation of Design-Build Practice in Colorado, Research Report IR(CX) 70-4(143), Colorado Department of Transportation, Denver, Colorado, 1997.

  • Gransberg, D.D., "The Cost of Inaction: Does Massachusetts Need Public Construction Reform?" White Paper No. 7, Pioneer Institute for Public Policy Research, Center for Restructuring Government, Boston, Massachusetts, September, 1999, 28pp.

  • Gransberg D.D., J.E. Koch and K.R. Molenaar. Preparing for Design-Build Projects: A Primer for Owners, Engineers, and Contractors, ASCE Press, Reston, Virginia, 2006, p. 26.

  • Gransberg, D.D., and K.R. Molenaar, The Impact of Design-Build on the Public Workforce, Keston Institute for Public Finance and Infrastructure Policy, University of Southern California, Los Angeles, California, 2007, pp. 20-26.

  • Gransberg, D.D. and K.R. Molenaar, "Analysis of Owner's Design and Construction Quality Management Approaches in Design-Build Projects" Journal of Management in Engineering, ASCE, Vol. 20, Iss. 4, 2004.

  • Gransberg, D.D. and K.R. Molenaar, "Does Design-Build Project Delivery Affect the Future of the Public Engineer?" Transportation Research Record 2081, Journal of the Transportation Research Board, National Academies, December 2008, pp. 3-8

  • Gransberg, D.D., and E. Windel, "Communicating Design Quality Requirements for Public Sector Design/Build Projects," Journal of Management in Engineering, ASCE, Vol. 24 (2), April 2008, pp 105-110.

  • Gransberg, D.D. and R.F. Barton, "Analysis of Federal Design-Build Request for Proposal Evaluation Criteria," Journal of Management in Engineering, ASCE, Vol. 23 (2), April 2007, pp. 105-111.

  • Gransberg, D.D. and K.R. Molenaar, "Life Cycle Cost Award Algorithms for Design-Build Highway Pavement Projects," Journal of Infrastructure Systems, ASCE, Vol. 10 (4), December, 2004, pp. 167-175.

  • Gransberg, D.D. and K.R. Molenaar, "Analysis of Owner's Design and Construction Quality Management Approaches in Design-Build Projects" Journal of Management in Engineering, ASCE, Vol. 20 (4), October, 2004, pp. 162-169.

  • Gransberg, D.D. and K.R. Molenaar, "A Synthesis of Public Design-Build Source Selection Methods" Journal of Construction Procurement, Vol. 9 (2), November, 2003, pp. 40-51.

  • Gransberg, D.D., and S.P. Senadheera, "Design-Build Contract Award Methods for Transportation Projects," Journal of Transportation Engineering, ASCE, Vol. 125 (6), November, 1999, pp. 565-567.

  • Gransberg, D.D. and K.R. Molenaar, "Quality Management Organizations for Design-Build Transportation Projects," Proceedings, 1st International Conference on Transportation Construction Management, Federal Highway Administration, Orlando Florida, February 2009.

  • Gransberg, D.D., Badillo-Kwiatkowski, G.M. and K.R. Molenaar, "Project Delivery Comparison Using Performance Metrics," 2003 Transactions, AACE, International, Orlando, Florida, June, 2003, pp. DRM 02. 01 - 02. 06.

  • Gransberg, D.D. and K.R. Molenaar, "Life Cycle Design Criteria for Design-Build Transportation Projects," Proceedings, Construction Research Congress, ASCE, Construction Institute, March, 2003, pp. 1-9.

  • Gransberg, D.D., and M.E. Villarreal, "Construction Project Performance Metrics" 2002 Transactions, AACE, International, Portland, Oregon, June, 2002, pp. CSC. 02. 01-CSC. 02. 05.

  • Gransberg, D.D. and C. Riemer, Performance-Based Construction Contractor Prequalification, NCHRP Synthesis 390, Transportation Research Board National Academies, Washington, D.C., ISBN 978-0-309-09828-1, 2009, 114pp.

  • Gransberg, D.D. and J.B. Carlisle. "Estimating Preconstruction Services Fees for CM-at-Risk Projects," 2008 Transactions, AACE, International, Toronto, Ontario, Canada, July 2008, pp EST. 09. 1-EST. 09. 10.

  • Gransberg, D.D., K.R. Molenaar, and J.N. Datin, Quality Assurance in Design-Build Projects, NCHRP Synthesis 376, Transportation Research Board National Academies, Washington, D.C., 2008, 281pp.

  • Gribbon, P., G. Irwin, G. Colzani, G. Boyce, and J. McDonald. 2003. "Portland, Oregon's Alternative Contract Approach to Tackle a Complex Underground Project. " Presented at 2003 RETC conference in New Orleans, LA, June 16, 2003.

  • Grinder, R.D., "U.S. Department of Transportation, a Brief history," Office of the Historian DOT Historian, 2003, http://dotlibrary.dot.gov/Historian/history.htm [June 7, 2009].

  • Hess, S.A. and J.V. Bales, Design Professional and Construction Manager Law, American Bar Association, Chicago, Illinois, 2007, p. 293.

  • Highways Agency, Early Contractor Involvement Contract Guidance Manual, United Kingdom Highways Agency, London, England UK, August 2, 2004, 47pp.

  • Ibbs, C.W., Y. Kwak, and A. Odabasi, "Project Delivery System and Project Change: A Quantitative Analysis," Journal of Construction Engineering and Management, ASCE 129(4), 2003, pp. 382-387.

  • Indiana DOT "Supplemental Instructions For Form IC 730 (SF 4351) Request for Approval of Subcontractor," February 4, 2008, http://www.in.gov/dot/div/contracts/standards/IC-730instruc.pdf [May 15, 2009]

  • Jergeas, G. and J. Van der Put, "Benefits of Constructability on Construction Projects," Journal of Construction Engineering and Management, Vol. 127, (4), 2001, p 281.

  • Kasturi, S.R. and D.D. Gransberg, "Time Management- A Design-Builder's Perspective" Cost Engineering, Journal of AACE, International, Vol. 44 (9) September, 2002, pp. 16-23.

  • Kessler, F., "Managing Your Money: Project Delivery Methods," Nossaman, Guthner, Knox & Elliot LLP, White Paper, 2005 [WWW document] URL http://www.nossaman.com/db30/cgi-bin/news/FWK_MassTransit_04.05.pdf (March 20, 2007)

  • Ketcham, M. and Epps, M., "How to Hire a Construction Manager for Your Energy Efficiency Project," Energy Efficiency Project Management Handbook California Energy Commission, Manual P400-00-001E, Sacramento, California, May 2000, p. 2-4.

  • Konchar, M. and V. Sanvido (1998). "Comparison of U.S. Project Delivery Systems," Journal of Construction Engineering. and Management, ASCE, 124(6), 435-444.

  • Kuhn, S. "Preconstruction Services: Add Value with More than Just Estimating," Construction Business Owner, February 2007, http://www.constructionbusinessowner.com/topics/accounting-and-finance/preconstruction-services-add-value-with-more-than-just-estimating.html (August 1, 2008).

  • Kwak, Y.H. and R. Bushey, "Construction Management at Risk: An Innovative Project Delivery Method at Stormwater Treatment Area in the Everglades, Florida," Proceedings, Construction Congress VI Orlando, Florida, 2000, pp. 477-482.

  • Ladino, M.J., K.A. Reedy, and J.E. Carlson, "Alternate Project Delivery in Horizontal Construction," Presentation, Annual Meeting Associated General Contractors of America, Las Vegas, Nevada, March 2008, 25pp.

  • Lee, J. "CM/GC at Oregon DOT," Presentation, WASHTO Conference, Portland Oregon 2008, 14pp.

  • Lopez del Puerto, C., D.D. Gransberg, and J.S. Shane "Comparative Analysis of Owner Goals for Design/Build Projects," Journal of Management in Engineering, ASCE, Vol. 24 (1), January 2008, pp 32-29.

  • Martinez, P.H., Y. Rashida, and V. MacMurray "Construction Manager's Responsibilities: Pre-Design, Design and Pre-Construction Phase" American Bar Association January 2007, 58pp, http://www.abanet.org/abastore/productpage/5570099PDF, [June 9, 2009].

  • Massachusetts Highway Department (Mass Highway), Design Build Procurement Guide, Boston, January 19, 2006.

  • McLawhorn, N., "Implementing Design-Build," Transportation Synthesis Report, Wisconsin Department of Transportation RD&T Program, Madison, Wisconsin, 2003, 9 pp.

  • Migliaccio, G.C., G.E. Gibson, and J.T. O'Connor, "Changing Project Delivery Strategy, an Implementation Framework," Public Works Management & Policy, Vol. 12 No. 3, January 2008, pp. 483-502

  • Minchin, E., K. Thakkar, K., and R. Ellis, "Miami Intermodal Center-Introducing CM-At-Risk to Transportation Construction", in Innovative Project Delivery Systems, Molenaar, K.R. and Yakowenko, G. (Eds), ASCE Press, 2007, pp 46-59.

  • Minnesota Department of Transportation (MnDOT), "MnDOT's Response to National Transportation Safety Board Recommendations" I-35W Bridge in Minneapolis, November 2008, http://www.dot.state.mn.us/i35wbridge/ [December 22, 2008]

  • Mitchell, B.P. "The Applicability of the Spearin Doctrine: Do Owners Warrant Plans and Specifications?" Find Law for Legal Professionals, 1990, http://library.findlaw.com/1999/Aug/1/128038.html (March 24, 2007).

  • Molenaar, K.R., "Programmatic Cost Risk Analysis for Highway Megaprojects," Journal of Construction Engineering and Management, ASCE Vol. 131(3), 2005, pp 343-353.

  • Molenaar, K.R., and D.D. Gransberg, "Design-builder Selection for Small Highway Projects," Journal of Management in Engineering, ASCE, Vol. 17 (4), October, 2001, pp. 214-223.

  • Molenaar, K.R., and D.D. Gransberg, "A Framework for Classifying Best-Value Award Systems for Highway Construction Projects," 2004 Proceedings, Design-Build in Transportation Conference, DBIA, Baltimore, Maryland, April, 2004.

  • Molenaar, K., D. Gransberg, S. Scott, D. Downs, and R. Ellis, Recommended AASHTO Design-Build Procurement Guide: Final Report, Project No. 20-7/TASK 172, National Cooperative Highway Research Program Transportation Research Board National Research Council, Aug. 2005, 101 pp.

  • Naval Facilities Institute, "Federal Architect-Engineer Contracting Cost Principles Workbook," Department of the Navy, Port Huenme, California, 2005, 78 pp.

  • National Society of Professional Engineers (NSPE), "Design/Build in the Public Sector," NSPE Board of Directors, Position Statement #1726, 1995 [Online]. Available: http://www.nspe.org/govrel/gr2-ps1726.asp [November 17, 2006].

  • New York State Department of Transportation (NYSDOT), Design-Build Procedures Manual, Volume 1, Albany, September 2005, 141 pp.

  • North Carolina Department of Transportation (NCDOT), Design-Build Policy & Procedures, Raleigh, January 6, 2000.

  • O'Connor, J.T. and Miller, S.J. "Barriers to Constructability Implementation," Journal of Performance of Constructed Facilities, ASCE, 8(2), 1994, pp. 110-128.

  • Pantazides, L., "Managing Quality on Transportation Mega Projects," ASQ World Conference on Quality and Improvement Proceedings, Milwaukee, Wisconsin, 2005, Vol. 59, pp. 289- 297.

  • Parvin, C. "Design-build: Evaluation and award," Roads and Bridges, Vol. 38, No. 12, February, 2000 p. 12.

  • Pocock, J.B., S.T. Kuennen; J. Gambatese; and J. Rauschkolb, "Constructability State of Practice Report," Journal of Construction Engineering and Management, ASCE, Vol. 132, No. 4, April 1, 2006, p. 375.

  • Postma, S.E., R. Cisneros, J. Roberts, R. Wilkison, J. Clevenger, A. Eastwood, I-15 Corridor Reconstruction Project Design/Build Evaluation 2001 Annual Report: Report No. UT-02. 11. Utah Department of Transportation Research Division, Salt Lake City, UT, April 2002, 36 pp.

  • Potter, J.M., and D.K. McMahon, Selecting a Quality Control/Quality Assurance Program for a Mega Design-Build Project, Rummel, Klepper, and Kahl, LLP, Baltimore, Maryland, 2006, 12 pp.

  • Qaasim H.A., "Quality Assurance Pre-Assessments," Proceedings, American Society for Quality World Conference on Quality and Improvement. Milwaukee, Wisconsin, 2005. Vol. 59; p. 299-308.

  • Reinschmidt, K. and D. Trejo, "Economic Value of Building Faster," Journal of Construction Engineering and Management, ASCE, Vol. 132, No. 7, July 1, 2006, p. 759.

  • Richter, W.L. (1995). Transportation in America. ABC-CLIO, Inc., Santa Barbara, California, 1995, 631pp.

  • Riverside County, Estimating guidelines for roadway construction projects, Transportation Department, County of Riverside, Riverside, California, 1999, p. 8.

  • Rojas, E.M. and I. Kell, "Comparative Analysis of Project Delivery Systems Cost Performance in Pacific Northwest Public Schools," Journal of Construction Engineering and Management, Vol. 134, No. 6, June 1, 2008, p. 387-398.

  • Russell, J.S., S.D. Anderson, D. Trejo, and A.S. Hanna, Construction Engineering and Management Research Program, National Cooperative Highway Research Programs (NCHRP) Web Document 51 (Project D10-58), TRB, Washington, D.C., 2002, p. 51.

  • Sanvido, V. and M. Konchar. Selecting Project Delivery Systems: Comparing Design -Bid-Build, Design-Build, and Construction Management at Risk. The Project Delivery Institute, State College, Pennsylvania,1999. pp. 13-18.

  • Scott, S. Molenaar, K., Gransberg, D, Smith, N. "Best Value Procurement Methods for Highway Construction Projects", National Cooperative Highway Research Programs (NCHRP), Report 561, Washington, D.C. 2006, pp.

  • Septelka, D. and S. Goldblatt "Survey of General Contractor/Construction Management Projects in Washington State,"State of Washington Joint Legislature Audit and Review Committee Report, Olympia, Washington, 2005 117pp.

  • Shadan, K., R. Dawson and S. Zeevaart, Construction Project Management Handbook Federal Transit Administration (FTA) 2006, 128pp

  • Shane, J.S., D.D. Gransberg, K.R. Molenaar, and J.R. Gladke, "Legal Challenge to a Best-Value Procurement System," Journal of Leadership and Management in Engineering, ASCE, Vol. 5 (1), January, 2006, pp. 1-6.

  • Siebels, J.E., "Implementation of Design-Build Guidelines," Memo to Regional Transportation Directors Program Engineers, Colorado Department of Transportation, August 8, 1997, 2 pp.

  • Smith N.C., "Getting What You Paid For: the Quality Assurance and Acceptance Process for Transportation Projects," Proceedings, American Bar Association Forum on the Construction Industry, Denver, Colorado, 2001, p. 17-18.

  • Songer, A.D. and Molenaar, K.R., "Selecting Design-Build: Private and Public Sector Owner Attitudes," ASCE Journal of Engineering Management, Vol. 12, Iss. 6, 1996, pp. 47-53.

  • Strang, W., "The Risk in CM at-Risk," CM eJournal, Construction Management Association of America, 2002 p. 1-9.

  • Storm, G. "New Contracting Experience Guides Fairbanks Airport Project," Pacific Builder and Engineer, 2007, http://www.acppubs.com/article/CA6480230.html?industryid=48546 [September 22, 2008]

  • Strong, K., Performance Effectiveness of Design-Build, Lane Rental, and A + B Contracting Techniques: Final Report, Report No. MN/RC-2006-09, Minnesota Department of Transportation, St. Paul, Minnesota, March 2006, 74 pp.

  • Strong, K.C., J. Tometich and N. Raadt, "Cost Effectiveness of Design-Build, Lane Rental, and A + B Contracting Techniques. " Proceedings of the 2005 Mid-Continent Transportation Research Symposium, Iowa State University, Ames Iowa, August 2005, 10 pp.

  • Touran, A. "Owners Risk Reduction Techniques Using a CM," CMAA Research Report, Construction Management Association of America, Washington, DC, 2006, 55pp.

  • Touran, A, D.D. Gransberg, K.R. Molenaar, K. Ghavamifar, and P. Bakhshi. "A Guidebook for Airport Capital Project Delivery Methods", Airport Cooperative Research Program A01-05, Interim Report, Transportation Research Board, National Academies, Washington, D.C., 2008, pp. 17-19.

  • Touran, A., D.D. Gransberg, K.R. Molenaar, K. Ghavamifar, D.J. Mason, and L.A. Fithian, A Guidebook for the Evaluation of Project Delivery Methods, TCRP Report 131, Transportation Research Board, National Academies, Washington, D.C., 2007, 240pp.

  • Touran, A., D.D. Gransberg, K.R. Molenaar, and K. Ghavamifar, "Selection of Project Delivery Method in Transit: Drivers and Objectives," Journal of Management in Engineering, ASCE, (Accepted for publication in 2010).

  • Touran, A., D.D. Gransberg, K.R. Molenaar, and K. Ghavamifar, "A Decision Support System for Project Delivery Method Selection in Transit," Transportation Research Record, Journal of the Transportation Research Board, National Academies, (Accepted for publication in 2010).

  • Touran, A., D.D. Gransberg, and K.R. Molenaar, "Transit Project Delivery Methods: A Case Study Analysis," Proceedings, 1st International Conference on Transportation Construction Management, Federal Highway Administration, Orlando Florida, February 2009, pp.

  • Touran, A, D.D. Gransberg, K.R. Molenaar, and K. Ghavamifar, "Selection of Project Delivery Method in Transit: Drivers and Objectives," 2009 Transportation Research Board, Paper #09-0522, National Academies, Washington, D.C., January 2009.

  • Transportation Research Board (TRB), "Innovative Contracting Practices," Transportation Research Circular 386, National Research Council, 1991, Washington, D.C., pp. 1-74.

  • Trauner Consulting Services, "Innovative Procurement Practices Alternative Procurement and Contracting Methods," California Department of Transportation Report No. 53A0104 Sacramento, California, 2007, p. 10-12.

  • Uhlik, F.T. and M.D. Eller, "Alternative Delivery Approaches For Military Medical Construction Projects," Journal of Architectural Engineering, ASCE, Vol. 5 (4), 1999, pp. 149-155.

  • University of Washington (UW) "UW: Greenroads," 2009, http://pavementinteractive.org/ index.php?title=UW:Green_Roads, [May 25, 2009].

  • US Army Corps of Engineers (USACE). Engineering instructions construction cost estimates, CEMP-E/CECW-E EI 01D010, US ACE, Washington, D.C., 1997, p. 121.

  • Utah Transit Authority (UTA), "CM/GC Peer Review Meeting," Memorandum, Utah Transit Authority, Salt Lake City Utah, August 12, 2003, 34pp.

  • Van Winkle, H. "Alternate Project Delivery Systems," Proceedings, 2007 ACI Annual Conference, Airports Council International, Kansas City, Missouri, p. 7-41.

  • Venturato, T. and J. Schroeder, "Owner-Controlled Accelerated Project, Unique Project Delivery Method for Light Rail," Transportation Research Record: Journal of the Transportation Research Board, No. 2006, Transportation Research Board of the National Academies, Washington, D.C., 2007, pp. 60-66.

  • Virginia Department of Transportation (VDOT), Quality Control, Quality Assurance, Independent Assurance and Independent Verification Guide for use on Public-Private Transportation Act & Design Build Projects, Richmond, Virginia, March 28, 2007, 30 pp.

  • Virginia Department of Transportation Innovative Project Delivery Division (VDOT), Design-Build Procurement Manual (In Draft Format), Richmond, November 12, 2004 Revised June 30, 2006.

  • Walewski, J., G.E. Gibson, Jr., and J. Jasper, Project Delivery Methods and Contracting Approaches Available for Implementation by the Texas Department Of Transportation, Center for Transportation Research, Report No. FHWA/TX-0-2129-1, Austin Texas, 2001, 116pp.

  • Washington State Department of Transportation (WSDOT) (2008). WSDOT market analysis, WWW Document, http://www.wsdot.wa.gov/biz/contaa/construction/CostIndex/CostIndexPdf/2008Q1Market%20Analysis.pdf, [February 18, 2009].

  • Washington State Department of Transportation (WSDOT), Guidebook for Design-Build Highway Project Development, Olympia, June 20, 2004, 85 pp.

  • Wichern, S., "Protecting Design-Build Owners Through Design Liability Coverage, Independent Construction Managers, and Quality Control Procedures," Transportation Law Journal, Vol. 32 No. 1, Fall 2004, pp 35-56.

  • Wiss, R., R. Roberts, and S. Phraner, S. "Beyond Design-Build-Operate-Maintain,"

  • Yuan, J., J.A. Roberts, C.N. Fu, and G.W. Raba, "The Independent Construction Quality Assurance Program of State Highway 130 Project: The Perspective of the Independent Construction Quality Assurance Firm," In the TRB 86th Annual Meeting, CD-ROM, TRB, National Research Council, Washington, D.C., January 2007, 17 pp.

  • Zocher, M.A., O.H. Paananen, and C. Sohn, "Cost Engineering Considerations in Privatization," Cost Engineering, Vol. 39, Iss. 5, 1997, p. 40.

  • Zweig-White Research, "Is Design-Build Due for an Increase?" The Zweig Letter, Issue 551, 2004 [Online]. Available: http://www.zweigwhite.com/trends/thezweigletter/index.asp [February 18, 2007].

Updated: 06/27/2017
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000