Seventeen tests were used to validate the soil-geosynthetic capacity and required reinforcement strength equations. The complete set of data from these tests is presented in table 7.
Table 7. Prediction data for large-scale tests.
Test |
Reference No. |
σc |
Sv(inch) |
Tf (lb/ft) |
dmax (inch) |
c (lb/ft2) |
φ |
H (ft) |
qrupture (lb/ft2) |
γ |
---|---|---|---|---|---|---|---|---|---|---|
GSGC 1 |
10 |
710 |
None |
– |
1.3 |
1,462 |
50 |
6.5 |
– |
153 |
GSGC 2 |
10 |
710 |
8 |
4,800 |
1.3 |
1,462 |
50 |
6.5 |
56,403 |
153 |
GSGC 3 |
10 |
710 |
16 |
9,600 |
1.3 |
1,462 |
50 |
6.5 |
36,558 |
153 |
GSGC 4 |
10 |
710 |
16 |
4,800 |
1.3 |
1,462 |
50 |
6.5 |
27,157 |
153 |
GSGC 5 |
10 |
0 |
8 |
4,800 |
1.3 |
1,462 |
50 |
6.5 |
39,691 |
153 |
Elton and Patawaran 1 |
23 |
0 |
6 |
620 |
0.5 |
576 |
40 |
5 |
4,805 |
121 |
Elton and Patawaran 2 |
23 |
0 |
12 |
620 |
0.5 |
576 |
40 |
5 |
2,695 |
121 |
Elton and Patawaran 3 |
23 |
0 |
6 |
960 |
0.5 |
576 |
40 |
5 |
6,392 |
121 |
Elton and Patawaran 4 |
23 |
0 |
6 |
1,025 |
0.5 |
576 |
40 |
5 |
6,100 |
121 |
Elton and Patawaran 5 |
23 |
0 |
6 |
1,300 |
0.5 |
576 |
40 |
5 |
8,398 |
121 |
Elton and Patawaran 6 |
23 |
0 |
6 |
1,400 |
0.5 |
576 |
40 |
5 |
8,293 |
121 |
Elton and Patawaran 7 |
23 |
0 |
6 |
1,700 |
0.5 |
576 |
40 |
5 |
9,589 |
121 |
NCHRP 1 |
7 |
0 |
8 |
1,400 |
1 |
418 |
37.3 |
15 |
7,312 |
117 |
NCHRP 2 |
7 |
0 |
8 |
4,800 |
1 |
418 |
37.3 |
15 |
17,757 |
117 |
Defiance 1 |
24 |
0 |
8a |
2,400 |
0.5 |
0 |
48.7 |
6.4 |
11,320 |
110 |
Defiance 2 |
24 |
0 |
8a |
4,800 |
0.5 |
0 |
48.7 |
6.4 |
21,412 |
110 |
Vegas |
20 |
0 |
6a |
2,400 |
1 |
576 |
40 |
8 |
20,890 |
121 |
The load-carrying capacity of a GRS wall and abutment (qult,an,c) can be evaluated using an analytical formula (equation 3). For this equation, the calculated capacity matches well with the measured capacity from large-scale tests (see figure 12). The numerical results of this comparison are presented in table 8. Note that for long-term design, cohesion (c) and confining stress (σc) are assumed to equal zero and should not be accounted for.
Table 8. Soil-geosynthetic capacity equation validation results.
Test |
Reference No. |
qmeasured(lb/ft2) |
qcalc |
---|---|---|---|
GSGC 1 |
10 |
16,085 |
12,680 |
GSGC 2 |
10 |
56,403 |
51,181 |
GSGC 3 |
10 |
36,558 |
39,545 |
GSGC 4 |
10 |
27,157 |
26,113 |
GSGC 5 |
10 |
39,691 |
46,522 |
Elton and Patawaran 1 |
23 |
4,805 |
5,327 |
Elton and Patawaran 2 |
23 |
2,695 |
3,175 |
Elton and Patawaran 3 |
23 |
6,392 |
6,915 |
Elton and Patawaran 4 |
23 |
6,100 |
7,228 |
Elton and Patawaran 5 |
23 |
8,398 |
8,502 |
Elton and Patawaran 6 |
23 |
8,293 |
8,816 |
Elton and Patawaran 7 |
23 |
9,589 |
10,403 |
NCHRP 1 |
7 |
8,356 |
7,291 |
NCHRP 2 |
7 |
17,757 |
20,347 |
Defiance 1 |
24 |
13,370 |
11,322 |
Defiance 2 |
24 |
25,068 |
20,180 |
Vegas Mini Pier |
20 |
20,890 |
18,258 |
For the required reinforcement strength equation (equation 13), the calculated strength matches well with the actual strength at rupture from large-scale tests (see figure 16). The biggest differences occur with some of the GSCS tests, which had a uniform confining pressure applied.(10) This confining stress will likely not be present in an actual GRS-IBS application. The numerical results of this comparison are presented in table 9. Note that for long-term design, the cohesion (c) and confining stress (σc) is assumed to equal zero and should not be accounted for.
Table 9. Required reinforcement strength equation validation results
Test |
Reference No. |
Tactual |
Tcalc |
---|---|---|---|
GSGC 2 |
10 |
4,800 |
5,483 |
GSGC 3 |
10 |
9,600 |
8,633 |
GSGC 4 |
10 |
4,800 |
5,274 |
GSGC 5 |
10 |
4,800 |
4,069 |
Elton and Patawaran 1 |
23 |
620 |
632 |
Elton and Patawaran 2 |
23 |
620 |
712 |
Elton and Patawaran 3 |
23 |
960 |
975 |
Elton and Patawaran 4 |
23 |
1,025 |
912 |
Elton and Patawaran 5 |
23 |
1,300 |
1,408 |
Elton and Patawaran 6 |
23 |
1,400 |
1,385 |
Elton and Patawaran 7 |
23 |
1,700 |
1,665 |
NCHRP 1 |
7 |
1,400 |
1,902 |
NCHRP 2 |
7 |
4,800 |
4,587 |
Defiance 1 |
24 |
2,400 |
2,857 |
Defiance 2 |
24 |
4,800 |
5,254 |
Vegas Mini Pier |
20 |
2,400 |
2,944 |