ACTT Workshop: Rhode Island
Pawtucket Bridge No. 550 - Building a Foundation for the Future
PDF Version
(1.2 mb)
Rhode Island
Why ACTT?
Executive Summary
Chapter 1: Workshop Details
1.1 Opening Session
1.2 Workshop Process
1.3 Skill Set Goals
Chapter 2: Project Details
2.1 Project Scope
2.2 Workshop Priorities
2.3 Project Constraints
2.3.1 Traffic
2.3.2 Time
2.3.3 Work Area
Chapter 3: Skill Set Recommendations
3.1 Structures
3.2 Construction
3.3 Geotechnical Materials
3.4 Traffic/Safety/ITS/PR
3.5 Roadway/Geometric Design
3.6 Environment
Chapter 4: Conclusions
4.1 Next Steps
Appendices
Appendix A: Workshop Attendees
Appendix B: Skill Set Reporting Forms
List of Figures
Figure 1: Project Location
Figure 2: Bridge No. 550 Aerial View
Figure 3: Pawtucket Bridge No. 550
Figure 4: Existing and Preliminary Bridge Cross Sections
FHWA-IF-05-034
PDF files can be viewed with the
Acrobat® Reader®
Next
>>
Contact
Construction Feedback
E-mail Construction
Updated: 04/04/2011