Next >> |
Archived: 2007 FHWA Seismic Accelerated Bridge Construction Workshop Outcomes and Follow-up Activities
Rapid Bridge Construction: Seismic Connections Moderate-to-High Seismic Zones
San Diego, CA - Thursday, October 11, 2007
TABLE OF CONTENTS
- Background
- Purpose
- Process
- Program
- Outcomes
- Post-earthquake accelerated column repair/replacement (B2)
- Investigation of column seismic connections for ABC (C6, C8, and C10)
- Response of segmental systems (C4a, b, c, and B5)
- Connections - Ductile, Constructible, Rapid (C1b, D2, and E13)
- Rocking columns (B6)
- Segmental post-tensioned columns (connections) (F6)
- Footing-to-Pile and Column-to-Foundation connections (F1 and F2)
- Innovative materials (G1)
- Segmental construction connection concepts (C3)
- Long-term performance of SABC connections (G2)
- Code recommendations for SABC (H6)
- Follow-up Meetings
- Conclusions
- Seismic ABC Action Plan
LIST OF TABLES
- TABLE 1. Workshop Steering Committee
- TABLE 2. Presentations
- TABLE 3. Brainstorming Idea Categories
- TABLE 4. Seismic ABC research needs
LIST OF FIGURES
LIST OF APPENDICES
- APPENDIX A - Participant List
- APPENDIX B - Program
- APPENDIX C - Presentation Summaries
- APPENDIX D - Brainstorm Ideas: All Inclusive
- APPENDIX E - Brainstorm Ideas: Seismic Connection Detailing Focus
- APPENDIX F - Breakout Groups
- APPENDIX G - Breakout Session Issue Template
- APPENDIX H - Populated Issue Templates
Next >> |