3D Engineered Models
Design
- MoDOT Interim Guidelines for Electronic Deliverables for Engineering Data
- Oregon DOT 3D Roadway Design
Design Visualization
- AASHTO - Visualization in Transportation
- Design Visualization Article: See it Before it's Built
Electronic Data, Geometrical Drafting
- 3D Model Based Design Interim Guidelines
- 3D Visualization for the Civil Engineer Using Autodesk 3ds Max Design
- 3D-GEM: Geo-technical extension towards an integrated 3D information model for infrastructural development
- 3D-GEM: Geo-technical extension towards an integrated 3D information model for infrastructural development*
- 4D CAD for highway construction projects
- A framework for rapid local area modeling for construction automation
- Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling
- Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry
- Building Information Modeling Boosters Are Crossing That Bridge
- CADApps
- CADD Support and Resources Minnesota Department of Transportation
- Collaborative Multi-Agent Systems for Construction Equipment Based on Real-Time Field Data Capturing, (2009)
- Conversion of Volunteer-Collected GPS Diary Data into Travel Time Performance Measures: Literature Review, Data Requirements, and Data Acquisition Efforts
- Current research and development and approach to future automated construction in Japan
- Design Memorandum NO. 18-05-Electronic Files Submittal with the Final Contract Plans
- Digital Design Environment Guide
- Feasibility Study of 4D CAD in Commercial Construction*
- Formalization and automation of time-space conflict analysis
- Four-dimensional visualization of construction scheduling and site utilization
- Image based Virtual 3D Campus modeling by using CityEngine
- Improving Accuracy in Earthwork Volume Estimation for Proposed Forest Roads Using a High-Resolution Digital Elevation Model
- Methodology for Selection and Development of TransXML Schemas
- Mobile 3D mapping for surveying earthwork projects using an Unmanned Aerial Vehicle (UAV) system
- NCHRP Synthesis 372 Emerging Technologies for Construction Delivery
- NCHRP Synthesis 385 Information Technology for Efficient Project Delivery
- Real-time simulation of earthmoving projects using automated machine guidance
- Robotic excavation in construction automation
- State of the art in automation of earthmoving
- Unlocking Design Data, (2005)
- Utility location and highway design
- Virtual 3D Campus Modeling by Using Close Range Photogrammetry
- Virtual Environment in Civil Engineering: Construction and Maintenance of Buildings
- Virtual Road Construction – a Conceptual Model (2007)
- Virtual Road Construction-A Conceptual Model
- Visualizing Simulated Construction Operations in 3D*
Mechanistic Analysis
- 3D FE Analysis of an Embankment Construction on GRSC and Proposal of a Design Method
- CADD Support and Resources Minnesota Department of Transportation
US Specifications/Standards
- Construction and Materials Manual, Construction Surveying Wisconsin Department of Transportation, (2010)
- Digital Design Environment Guide
- Engineering Automation Key Concepts for a 25 Year Time Horizon
- Global Positioning System (GPS) Survey Specifications, California Department of Transportation,
- Machine Control Grading Iowa Department of Transportation
- Machine Control Project Delivery Memo# 08-01
- Moving to 2004 Edition for Engineering Consultants NYSDOT Standards Plans (2005)
- NDDOT Procedures for Calculating Final Earthwork Quantities (2008)
- Office of Engineering and Technology Declares Geophysical survey Systems, inc. Request for a Wavier of Part 15 to be a "Permit-But-Disclose" Proceeding for Ex Parte Purposes
- Plans Preparation Manual
- Special provisions forslipform paving system machine control
- Specifications: How Much Information is Enough? 2009.
- Standard specifications for highway construction