Introduction to Development Impact Fees and Other Development Charges

« Previous

6. Case Example—East Palo Alto

Overall Developer "Fee Stack" for East Palo Alto

Fee type/facility category

Single family

Multi-family

Office/
Research and Deveopment

Retail

Industrial

Per DU

Per 1,000 ft2

Development impact fee (DIF) schedules

Parks and trails

- Citywide fees

$4,133

$2,847

$1.15

$0.77

$0.46

Public facilities

- Citywide fees

$7,248

$4,993

$2.01

$1.34

$0.81

Transportation

- Citywide fees

$2,358

$1,775

$7.33

$7.33

$4.77

Storm drainage

Per DU

Per impervious acre

- Fees outside RBD

$2,800

$70,000

- Fees within RBD

$4,840

$121,000

Other development charges (not DIF)

Affordable housing commercial linkage fees

Citywide fees

$0.00

$0.00

$10.72

$0.00

$0.00

Housing impact in-lieu fees

Per sq. ft.

- Citywide fees: Single-family infill

$36.22

NA

NA

NA

NA

- Citywide fees: Town houses

$34.78

NA

NA

NA

NA

- Citywide fees: Rental units

NA

$25.35

NA

NA

NA

- Fees outside RBD: Condos

NA

$50.58

NA

NA

NA

- Fees within RBD: Condos

NA

$67.62

NA

NA

NA

Quimby Act in-lieu fees (parks)

- Citywide fees

Varies[1]

NA

NA

NA

Storm drainage fees

- Citywide fees

Varies[2]

Water capacity fees[3]

- Citywide fees

$8,147

$5,014

$3.45

$5.01

$3.45

Source: AECOM (2019), City of Palo Alto Development Impact Fee Program—Nexus Study

Transportation Impact Fees—Trip Generation Basis

New Developments - column 2040 forecast

ITE (Baseline) - columns Trips/unit (ITE) and Total no. Trips (ITE)

Local Adjustments - Local Travel Demand, Inter-Zonal Trips, Non-Motor Trips, Transit Mode Share

Final Trips - Adjusted Trips/Unit, Adjusted No. Trips

Land use

ITE code

2040 forecast

Trips/unit (ITE)

Total no. trips (ITE)

Local Travel Demand

Inter-Zonal Trips

Non-Motor Trips

Transit Mode Share

Adjusted Trips/Unit

Adjusted No. Trips

Residential

 

DUs

Per DU

 

 

 

 

 

Per DU

 

- Town houses

230

1,486

0.52

773

76%

8%

NA

6%

0.34

508

-Multifamily

220

1,033

0.39

403

76%

8%

NA

6%

0.26

266

Nonresidential

 

Sq. Ft.

Per
1,000 ft2

 

 

 

 

 

Per
1,000 ft2

 

- Office/R&D

710

1,939,853

1.49

2,890

76%

0.5%

NA

6%

1.06

2,063

- Retail

820

333,406

3.73

1,244

76%

11%

19%

6%

1.93

643

- Industrial

110

267,987

0.97

260

76%

0.5%

NA

6%

0.69

185

Total

 

 

 

5,570

 

 

 

 

 

3,665

Source: AECOM (2019), City of Palo Alto Development Impact Fee Program-Nexus Study

DU = dwelling unit

Capital cost allocation to new developments

Transportation Project
Category (from CIP)

Project Cost
(in $M)

Road/Interchange Improvements

$55.1

Bicycle/Pedestrian/Sidewalk

$19.0

Street Lights/Safety

$1.1

Plans/Studies/Assessments

$0.8

Other

$6.6

scope="row"

Ravenswood SP Projects

$16.1

TOTAL

$98.6


Total daily trips (2040)

124,453

Existing daily trips (2015)

93,782

New daily trips (2015-
2040)

30,671

% increase in daily trips
(2015-2040)

25%

Capital Costs Attributed to New Developments:
($98.6M x 25%) +
(4% Administrative Fee) = $25.3M

Unit Cost/Trip = $25.3M/3,665 (Adj.) = $6,869/Trip

Source: AECOM (2019), City of Palo Alto Development Impact Fee Program—Nexus Study

Transportation Impact Fee Schedule

Land Use

Unit Cost ($/Trip)

AdjustedTrips/ Unit

Maximum Defensible Fee Schedule ($/Unit)

Adopted Fee Schedule ($/Unit)

Fee Range at Nearby Cities

Residential

$6,869

(Per DU)

- Townhouses

0.34

$2,358

$2,358

$1,800 - 2,600

- Multi-Family

0.26

$1,775

$1,775

$1,100 - 1,600

Non-Residential

(Per 1,000 Sq. Ft.)

- Office/R&D

1.06

$7.33

$7.33

$2.7 - $3.9

- Retail

1.93

$13.30

$7.33*

$3.3 - $3.9

- Industrial

0.69

$4.77

$4.77

n.a.

* Note: City adjusted this down from $13.30

Maximum ceiling adjusted based on local prevailing rate

Two Main Takeaways about DIFs

  1. DIFs are specifically designed for off-site public improvement needs for new developments that help trigger the local growth
  2. Through local ordinance, DIFs can be directly incorporated into local planning process as part of formal CIP funding source

Questions?

Julie Kim, Ph.D.
Founder & CEO, Benetellus
mjuliekim@gmail.com


« Previous