Highway Statistics 2004 | OHPI > Highway Statistics > 2004 > Highway Finance > Chart |
Data Below is 2004 | |
---|---|
Equipment, Overhead & Profit 1/ | 37.5% |
Wages 6/ | 18.9% |
Other | 12.4% |
Steel 5/ | 4.8% |
Bitumens 4/ | 7.8% |
Portland Cement 3/ | 0.7% |
Aggregates 2/ | 17.8% |
99.9% |
1/ Equipment includes fuel and lubricants 61.9%, but excludes operators’ and mechanics’ wages. Overhead includes contractors’ on-site expenses such as mobilization, office, rental, licenses, insurance, etc.
2/ Aggregates consists of sand, gravel, slag, crushed stone, etc., For use in bases, portland cement, concrete and bituminous surfaces, and portland cement concrete structures.
3/ For both roadway and structures.
4/ For various types of bituminous surfaces and bases.
5/ Inlcudes structural, reinforcing, culvert and miscellaneous stell.
6/ Gross earnings of contractors’ employees in the following classification: Administrative and Supervisory, Skilled, Intermediate, and Unskilled labor.