U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
Guide to Reporting Highway Statistics
The public report burden for this information collection is estimated to average 8 hours. | OMB No. 2125-0032 | ||
U. S. Department of Transportation STATE HIGHWAY CAPITAL OUTLAY |
STATE: | ||
YEAR ENDING (mm/yy): | |||
AREA AND FUNCTIONAL SYSTEM: | |||
EXPENDITURES BY IMPROVEMENT TYPES | ON NATIONAL HIGHWAY SYSTEM | OFF NATIONAL HIGHWAY SYSTEM | TOTAL |
---|---|---|---|
I. CAPITAL OUTLAY | |||
A. NEW FACILITIES | |||
1. RIGHT-OF-WAY COSTS | |||
2. ENGINEERING COSTS | |||
3. CONSTRUCTION OF NEW ROADS | |||
4. CONSTRUCTION OF NEW BRIDGES | |||
5. TOTAL | |||
B. CAPACITY ADDITIONS TO EXISTING FACILITES | |||
1. RIGHT-OF-WAY COSTS | |||
2. ENGINEERING COSTS | |||
3. RELOCATION WITH ADDED CAPACITY | |||
4. RECONSTRUCTION WITH ADDED CAPACITY | |||
5. MAJOR WIDENING | |||
6. BRIDGE REPLACEMENT WITH ADDED CAPACITY | |||
7. BRIDGE REHABILITATION WITH ADDED CAPACITY | |||
8. TOTAL | |||
C. SYSTEM PRESERVATION | |||
1. RIGHT-OF-WAY COSTS | |||
2. ENGINEERING COSTS | |||
3. RELOCATION WITH NO ADDED CAPACITY | |||
4. RECONSTRUCTION WITH NO ADDED CAPACITY | |||
5. RESTORATION, REHABILITATION, & RESURFACING | |||
6. MINOR WIDENING | |||
7. BRIDGE REPLACEMENT WITH NO ADDED CAPACITY | |||
8. BRIDGE REHABILITATION WITH NO ADDED CAPACITY | |||
9. TOTAL | |||
D. SYSTEM ENHANCEMENT AND OPERATION | |||
1. ENGINEERING COSTS | |||
2. SAFETY IMPROVEMENTS | |||
3. TRAFFIC MANAGEMENT / TRAFFIC ENGINEERING | |||
4. ENVIRONMENTAL IMPROVEMENTS | |||
5. OTHER ENHANCEMENTS | |||
6. TOTAL | |||
E. TOTAL CAPITAL OUTLAY (Lines A + B + C + D) | |||
II. MAINTENANCE |
Form FHWA-534 (Rev. 06-2000) PREVIOUS EDITIONS OBSOLETE