U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
Guide to Reporting Highway Statistics
| The public report burden for this information collection is estimated to average 8 hours. | OMB No. 2125-0032 | ||
U. S. Department of Transportation STATE HIGHWAY CAPITAL OUTLAY |
STATE: | ||
| YEAR ENDING (mm/yy): | |||
| AREA AND FUNCTIONAL SYSTEM: | |||
| EXPENDITURES BY IMPROVEMENT TYPES | ON NATIONAL HIGHWAY SYSTEM | OFF NATIONAL HIGHWAY SYSTEM | TOTAL |
|---|---|---|---|
| I. CAPITAL OUTLAY | |||
| A. NEW FACILITIES | |||
| 1. RIGHT-OF-WAY COSTS | |||
| 2. ENGINEERING COSTS | |||
| 3. CONSTRUCTION OF NEW ROADS | |||
| 4. CONSTRUCTION OF NEW BRIDGES | |||
| 5. TOTAL | |||
| B. CAPACITY ADDITIONS TO EXISTING FACILITES | |||
| 1. RIGHT-OF-WAY COSTS | |||
| 2. ENGINEERING COSTS | |||
| 3. RELOCATION WITH ADDED CAPACITY | |||
| 4. RECONSTRUCTION WITH ADDED CAPACITY | |||
| 5. MAJOR WIDENING | |||
| 6. BRIDGE REPLACEMENT WITH ADDED CAPACITY | |||
| 7. BRIDGE REHABILITATION WITH ADDED CAPACITY | |||
| 8. TOTAL | |||
| C. SYSTEM PRESERVATION | |||
| 1. RIGHT-OF-WAY COSTS | |||
| 2. ENGINEERING COSTS | |||
| 3. RELOCATION WITH NO ADDED CAPACITY | |||
| 4. RECONSTRUCTION WITH NO ADDED CAPACITY | |||
| 5. RESTORATION, REHABILITATION, & RESURFACING | |||
| 6. MINOR WIDENING | |||
| 7. BRIDGE REPLACEMENT WITH NO ADDED CAPACITY | |||
| 8. BRIDGE REHABILITATION WITH NO ADDED CAPACITY | |||
| 9. TOTAL | |||
| D. SYSTEM ENHANCEMENT AND OPERATION | |||
| 1. ENGINEERING COSTS | |||
| 2. SAFETY IMPROVEMENTS | |||
| 3. TRAFFIC MANAGEMENT / TRAFFIC ENGINEERING | |||
| 4. ENVIRONMENTAL IMPROVEMENTS | |||
| 5. OTHER ENHANCEMENTS | |||
| 6. TOTAL | |||
| E. TOTAL CAPITAL OUTLAY (Lines A + B + C + D) | |||
| II. MAINTENANCE | |||
Form FHWA-534 (Rev. 06-2000) PREVIOUS EDITIONS OBSOLETE