U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
Guide to Reporting Highway Statistics | Form 1 | Form 2
U.S. Department of Transportation TOLL FACILITY EXPENDITURES |
State: 0 |
||||||
Year Ending (mm/yy): 0 |
|||||||
Detail on Expenditures (State Facilities only) | Total | Identify by Facility, Functional System or NHS | |||||
---|---|---|---|---|---|---|---|
(A) | (B) | (C) | (D) | (E) | (F) | ||
VI. Capital Outlay | |||||||
A. New Facilities | |||||||
1. Right-of-way Costs | |||||||
2. Engineering Costs | |||||||
3. Construction of New Roads | |||||||
4. Construction of New Bridges | |||||||
5. Total (1 through 4) | |||||||
B. Capacity Additions to Existing Facilities | |||||||
1. Right-of-way Costs | |||||||
2. Engineering Costs | |||||||
3. Relocation with Added Capacity | |||||||
4. Reconstruction with Added Capacity | |||||||
5. Major Widening | |||||||
6. Bridge Replacement with Added Capacity | |||||||
7. Bridge Rehabilitation with Added Capacity | |||||||
8. Total (1 through 7) | |||||||
C. System Preservation | |||||||
1. Right-of-way Costs | |||||||
2. Engineering Costs | |||||||
3. Relocation with No Added Capacity | |||||||
4. Reconstruction with No Added Capacity | |||||||
5. Restoration, Rehabilitation and Resurfacing | |||||||
6. Minor Widening | |||||||
7. Bridge Replacement with No Added Capacity | |||||||
8. Bridge Rehabilitation with No Added Capacity | |||||||
9. Total (1 through 8) | |||||||
D. System Enhancement and Operation | |||||||
1. Engineering Costs | |||||||
2. Safety Improvements | |||||||
3. Traffic Management and Traffic Engineering | |||||||
4. Environmental Improvements | |||||||
5. Other Enhancements | |||||||
6. Total (1 through 5) | |||||||
E. Grand Total (A.5.+B.8.+C.9.+D.6.) | |||||||
VII. Maintenance | |||||||
Notes and Comments: |
Optional Form FHWA-539 (6-2000 ) PREVIOUS EDITIONS OBSOLETE