U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
Total AID Demonstration grant funds awarded: $ 103,437,928
Total number of AID Demonstration awards: 136
*85 EDC Innovations
Award Recipient | Project | Innovation | Award Amount |
---|---|---|---|
Alabama Department of Transportation | Ross Clark Circle Bridge over Beaver Creek | Slide-in Bridge Construction | $ 1,000,000 |
Alabama Department of Transportation | Mobile Project Inspection Systems App | e-Construction | $ 456,450 |
Alabama Department of Transportation | Baldwin County's Accelerated Bridge Construction Project utilizing NEXT Beam Bridge Retrofits and Ultra High Performance Concrete | Accelerated Bridge Construction (NEXT Beam Bridge Retrofits) / Ultra High Performance Concrete | $ 1,000,000 |
Alabama Department of Transportation | ALDOT Fiberglass Reinforced Asphalt Pavement Geotextile Project | Fiberglass Reinforced Asphalt Pavement Geotextiles | $ 544,000 |
Alabama Department of Transportation | A-GaME Implementation on US 231 Slide Repair (MP 301) | A-Game | $ 741,493 |
Alabama Department of Transportation & City of Auburn, Alabama | Moore’s Mill Road Bridge | Prefabricated Bridge Elements and Systems | $ 479,670 |
Arizona Department of Transportation | Arizona Sun Cloud - Statewide Implementation and Innovations | Statewide Transportation Data Portal | $ 1,000,000 |
Arizona Department of Transportation | Light-Emitting Diode lighting system in the Queen Creek Tunnel | Light-Emitting Diode lighting system | $ 1,000,000 |
Arizona Department of Transportation | Virgin River Bridges | Structural Health Monitoring | $ 768,000 |
Arizona Department of Transportation | Sun Cloud: A Megaregion Data Portal in the Sun Corridor of Arizona | Regional Transp. Data Portal | $ 1,000,000 |
Arizona Department of Transportation & Mohave County | Oatman Highway (Historic Route 66) Crossing at Sacramento Wash in Topock, AZ | Prefabricated Bridge Elements and Systems | $ 1,000,000 |
Arizona Department of Transportation & Mohave County | Composite Arch Bridge System Design and Construction Project (Antares Road over Truxton Wash) | Composite Arch Bridge System | $ 448,300 |
Arizona Department of Transportation / Maricopa County | Arizona DOT: Next Generation Freeway and Arterial work Zones | Smart Field Technology Real Time Work Zone Data Integration | $ 970,000 |
Arkansas Department of Transportation | Arkansas Debris Removal Systems Pilot | Next Generation TIM: Technology for Saving Lives Debris Removal Systems |
$ 1,000,000 |
Arkansas DOT | ArDOT Global Navigation Satellite System (GNSS) Continuously Operating Reference Stations (CORS) Project | e-Construction | $ 313,600 |
Arkansas State Highway & Transportation Department and City of Jonesboro, Arkansas | West College Avenue Bridge Replacement | Geosynthetic Reinforced Soil-Integrated Bridge System | $ 303,600 |
Assiniboine Sioux Tribes | Rocky Mountain Tribal CORS Project | Geospatial Data Collaboration | $ 325,000 |
California Department of Transportation | Geo-reference and visualization of right-of-way (ROW) maps | Geospatial Data Collaboration | $ 550,000 |
City of Dover | Creating a Benchmark for Traffic Signal Performance | Automated Traffic Signal Performance Measures | $ 649,500 |
City of Federal Way | City of Federal Way Variable Lane Use Control | Variable Lane Use Control (Adaptive Signal Control) | $ 601,890 |
Colorado Department of Transportation | Managed Motorway on I-25 | Intelligent Systems Technology | $ 1,000,000 |
Colorado Department of Transportation | CO DOTs E-Construction and Mobile-Based Project Delivery System | e-Construction | $ 672,450 |
Colorado Department of Transportation | CDOT's Snow Plow Signal Priority | Snow Plow Signal Priority | $ 800,000 |
Confederated Salish and Kootenai Tribes | North Valley Creek Bridge | Accelerated Bridge Construction | $ 115,520 |
Connecticut Department of Transportation | Implementation of GPSAVL Management System utilizing Global Positioning System (GPS) Automatic Vehicle Locators (AVL) units to support restructuring of agency’s response to weather related events | Road Weather Management | $ 950,000 |
Delaware Department of Transportation | Accelerated Bridge Construction Project - Bridge 1-438 on N463 Blackbird Station Road over Blackbird Creek | Ultra-High Performance Concrete | $ 257,950 |
Delaware Department of Transportation | Diverging Diamond Interchange (DDI) at SR 1 and SR 72 | Diverging Diamond Interchange | $ 1,000,000 |
District Of Columbia Department of Transportation | Ultra-High Performance Concrete Overlay Pilot Project | Ultra-High Performance for Bridge Preservation and Repair | $ 1,000,000 |
Florida - Orlando | City of Orlando: Automated Traffic Signal Performance Measures (ATSPM), Connected Vehicle (CV) technology, and Multimodal Signal Prioritization Technology (MSPT) Project | Automated Traffic Signal Performance Measures (ATSPM), Connected Vehicle (CV) technology, and Multimodal Signal Prioritization Technology (MSPT) | $ 998,216 |
Florida Department of Transportation | Commercial Vehicle Parking System on Interstate 95 and Interstate 4 corridors | Commercial Vehicle Parking System | $ 1,000,000 |
Florida Department of Transportation | Florida Pedestrian-Bicyclist Safety Applications Using Connected Vehicle Technologies | BikePed Safety Applications | $ 1,000,000 |
Florida Department of Transportation & Manatee County | Adaptive Signal Control Technology on SR 70 | Adaptive Signal Control | $ 1,000,000 |
Gwichyaa Zhee Gwich’in Tribe | Ivar’s Bridge Replacement Project | Geosynthetic Reinforced Soil-Integrated Bridge System | $ 430,250 |
Idaho Transportation Department (ITD) | IDT Implementing the Collaborative Hydraulics – Advancing to the Next Generation of Engineering (CHANGE) Initiative | CHANGE | $ 1,000,000 |
Illinois Department of Transportation | Campground Road Bridge over Interstate 57 | Ultra-High Performance Concrete | $ 344,000 |
Illinois Department of Transportation | Structure # 046-0152 (Illinois Route 115 over Gar Creek in Kankakee County, Illinois) to be replaced using prefabricated bridge elements and lateral slide methods | Prefabricated Bridge Element Systems and Slide-In Bridge Construction | $ 475,020 |
Illinois Department of Transportation | Hollow Avenue Project using compacted concrete pavement | Compacted Concrete Pavement AID-PT | $ 1,000,000 |
Illinois Department of Transportation (IDOT) & Williamson County | Saraville Road Resurfacing Project | Warm Mix Asphalt | $ 771,690 |
Indiana Department of Transportation | Work Zone Safety Automated Enforcement Project | Smarter Work Zones | $ 1,000,000 |
Indiana Department of Transportation | Accelerated Bridge Construction Alternate Design Project | Slide-in Bridge Construction and Self-Propelled Mobile Transport | $ 371,604 |
Iowa - Dubuque | City of Dubuque: Smart Traffic Routing with Efficient and Effective Traffic Signals (STREETS) Project | adaptive control; traffic simulation and traveler information components | $ 998,000 |
Iowa Department of Transportation | Iowa 92 Bridge over Little Silver Creek | Prefabricated Bridge Elements and Systems and high performance materials | $ 1,000,000 |
Iowa Department of Transportation | Implementation of Bridge Bundling (Innovative Contracting Method) to Accelerate Replacement of County Bridges | Innovative Contract – Bridge Bundling, Ultra High Performance Concrete | $ 1,000,000 |
Iowa Department of Transportation | Iowa DOT's Validated intelligent compaction (VIC), e-construction compaction reporting, and Automated Plate Load Testing (APLT) | Validated intelligent compaction (VIC), e-construction compaction reporting, Automated Plate Load Testing (APLT) | $ 700,000 |
Iowa Department of Transportation | Clinton County: Pilot Demonstration of Cape Seals for Pavement Preservation | Cape Seals for Pavement Preservation | $ 440,000 |
Iowa Department of Transportation | Advancing Transportation Life-Cycle Digital Delivery Project | e-Ticketing and Digital As-Builts, Digital Delivery | $ 1,000,000 |
Iowa Department of Transportation / Buena Vista County | Asset Management Tool for Iowa County Engineers - Unpaved Granular Road Modulus | Geospatial Data Collaboration, Validated Intelligent Compaction | $ 1,000,000 |
Kansas Department of Transportation | Construction Management System | e-Construction | $ 1,000,000 |
Kansas Department of Transportation | Innovative approach to Road Centerline Geospatial Data Collaboration | Geospatial Data Collaboration | $ 1,000,000 |
Kentucky Transportation Cabinet | Intelligent Compaction Project | Intelligent Compaction | $ 1,000,000 |
Kentucky Transportation Cabinet Report available |
Roundabout Installation in London, KY | Roundabout | $ 1,000,000 |
Kentucky Transportation Cabinet (KYTC) | Kentucky Automated Traffic Signal Performance Measures Corridor Project (US 231 - Warren County / Richmond Bypass - Madison County) | Automated Traffic Signal Performance Measures | $ 1,000,000 |
Maine Department of Transportation | Sarah Mildred Long Bridge Replacement Project | Construction Manager/General Contractor | $ 1,000,000 |
Maine Department of Transportation | Diverging Diamond Interchange Project | Diverging Diamond Interchange | $ 600,000 |
Maine Department of Transportation | Advanced Geotechnical Methods in Exploration implementation on the Brewer-Eddington I-395/Route 9 Connector Project | A-GaME | $ 1,000,000 |
Maine Department of Transportation | MaineDOT Crowdsourced Data for Operations Project | Crowdsourcing for Advancing Operations | $ 800,000 |
Massachusetts Department of Transportation | MassDOT UAS Data Analytics & Cybersecurity Program Bravo for Surface Transportation | UAS Data Analytics and Cybersecurity Program for Surface Transportation | $ 1,000,000 |
Massachusetts Department of Transportation | MassDOT Unmanned Aerial Systems Data Analytics & Cybersecurity Program Alpha for Surface Transportation Project | UAS | $ 1,000,000 |
Michigan Department of Transportation | Innovating the Lafayette Bascule Bridge | Exodermic Bridge Deck | $ 815,404 |
Michigan Department of Transportation | Bridge Replacement with UHPC Elements | Ultra High Performance (UHPC) Bridge Elements – Deck and Substructure | $ 704,708 |
Michigan Department of Transportation | Diverging Diamond Interchange (DDI) at Interstate 96 (I-96) and Cascade Road | Diverging Diamond Interchange | $ 1,000,000 |
Michigan Department of Transportation | M-86 over the Prairie River Bridge in St. Joseph County | Carbon Fiber Reinforced Polymer (CFRP) | $ 1,000,000 |
Michigan Department of Transportation | MDOT 2nd Avenue Network Arch Superstructure Project (S01-82024: Second Ave over I-94) | Network Arch Superstructure | $ 1,000,000 |
Michigan Department of Transportation Report available |
US-131 over 3 Mile Road Bridge Replacement | Slide-in Bridge Construction | $ 1,000,000 |
Michigan Department of Transportation & the Dickinson County Road Commission Report available |
Pine Mountain Road/Westwood Avenue Pavement Rehabilitation | Hot In-place Recycling and Warm Mix Asphalt | $ 697,008 |
Michigan Department of Transportation (MDOT) | Michigan Two-Coat Polyaspartic Paint System Pneumatic Pack Rust Removal (B01-49023: US-2 over Cut River) | Two-Coat Polyaspartic Paint System and Pneumatic Pack Rust Removal | $ 1,000,000 |
Michigan Department of Transportation / St Clair County Road Commission | Marine City Highway Bridge (Ira & Casco Townships) reconstruction using prefabricated bridge elements and systems, and ultra-high performance concrete | Ultra-High Performance Concrete | $ 626,935 |
Minnesota Department of Transportation | Paving projects using Intelligent Compaction (IC) and Infrared (IR) | Intelligent Compaction and Infrared | $ 1,000,000 |
Minnesota Department of Transportation | Signalized Restricted Crossing U-Turn Intersection on Trunk Highway 65 | RCUT Intersection | $ 1,000,000 |
Minnesota Department of Transportation | City of Winona: Broadway Avenue Road Diet | Road Diet | $ 1,000,000 |
Minnesota Department of Transportation & the City of St. James | Interconnected Mini-roundabouts on Minnesota State Highway 4 | Mini-roundabout | $ 864,000 |
Missouri Department of Transportation | High Friction Surface Treatments in Missouri | High Friction Surface Treatments | $ 964,000 |
Missouri Department of Transportation | Paving projects | Intelligent Compaction & Infrared (IR) Scanning | $ 764,032 |
Missouri Department of Transportation | Nanocoating Technology for Bridges | Nanocoating | $ 694,800 |
Missouri Department of Transportation | Missouri Department of Transportation / City of Fulton: Bridge (No.1555011 - 2nd Street Bridge over Stinson Creek & Stinson Creek Greenway) Replacement Project | Accelerated Bridge Construction (Prefabricated Bridge Elements and Systems) / Ultra High Performance Concrete Connections / STEP | $ 984,025 |
Missouri Department of Transportation (MoDOT) | Missouri Department of Transportation: Branson Automated Traffic Signal Performance Measures | Automated Traffic Signal Performance Measures | $ 334,800 |
Missouri Department of Transportation - City of Mexico | Holt Street Compacted Concrete Pavement | Compacted Concrete Pavement | $ 797,436 |
Montana Department of Transportation | Systems Engineering Analysis for a Statewide Traffic Signal System Evaluation | Traffic Signal System Evaluation | $ 816,000 |
Montana Department of Transportation | Asset Management for Retaining Project | Asset Management Approach to Retaining Walls | $ 1,000,000 |
National Park Service | Safety Analysis Project | Safety Management System | $ 296,800 |
New Hampshire Department of Transpiration (NHDOT) | Creating a Benchmark for Traffic Signal Performance | Automated Traffic Signal Performance Measures | $ 519,600 |
New Hampshire Department of Transportation | I-93 Pavement Preservation Project | Asphalt Rubber Bonded Wearing Course | $ 895,892 |
New Hampshire Department of Transportation | Bridge Monitoring Technology at Portsmouth’s Memorial Bridge | Structural Health Monitoring | $ 355,000 |
New Hampshire Department of Transportation | East Kingston, New Hampshire Bridge Rehabilitation Project | UHPC Connections | $ 631,925 |
New Hampshire Department of Transportation & City of Nashua | Safe Transportation for Every Pedestrian Program Implementation Project | STEP | $ 452,000 |
New Jersey Department of Transportation | Weather Savvy Roads Pilot to Remotely Provide Real-Time Information of the Road Maintenance Fleet to Traffic Management Centers | Weather Savvy Roads | $ 322,462 |
New York Department of Transportation | NYSDOT's Integrated Incident Management System Project | Integrated Incident Management Systems | $ 740,000 |
New York State Department of Transportation | Kew Garden Interchange Reconstruction Project | 3D Engineered Models incorporating civil integrated management (CIM) modeling | $ 600,000 |
North Carolina Department of Transportation | Anson County Bridge Replacement Project | Geosynthetic Reinforced Soil-Integrated Bridge System | $ 400,000 |
North Carolina Department of Transportation | NCDOT: Bridge Replacement (Carteret 73-NBI 0310073 / Carteret 96 - NBI 0310096) utilizing Carbon Fiber Reinforced Polymer Prestressing Strand Technology | Carbon Fiber Reinforced Polymer Prestressing Strand Technology | $ 1,000,000 |
North Dakota Department of Transportation | NDDOT's Autonomous Attenuator Project | Autonomous Attenuator | $ 241,687 |
North Dakota Department of Transportation | NDDOT Oversize Vehicle Measurement System | Oversize Vehicle Measurement System | $ 532,500 |
Ohio Department of Transportation | e-Construction on Two ODOT Projects | e-Construction | $ 511,762 |
Ohio Department of Transportation & Muskingum County | Fabricated Steel Bridge Replacement System Project | Fabricated steel bridge system | $ 557,600 |
Ohio Department of Transportation & Northeast Ohio Areawide Coordinating Agency | Development of comprehensive Transportation Asset Management Program | Transportation Asset Management Program | $ 600,000 |
Ohkay Owingeh Tribe Report available |
White Swan Bridge | Geosynthetic Reinforced Soil-Integrated Bridge System | $ 200,000 |
Oklahoma Department of Transportation | Diverging Diamond Interchange | Diverging Diamond Interchange | $ 1,000,000 |
Oklahoma Department of Transportation | ODOT UHPC Joint Headers and Link Slabs Project | Ultra-High Performance for Bridge Preservation and Repair | $ 839,807 |
Oklahoma Department of Transportation Report available |
Safety Project Utilizing High Friction Surface Treatment at Spot Locations | High Friction Surface Treatments | $ 417,696 |
Oregon Department of Transportation | Expediting on-scene investigation/reconstruction mapping activities along Interstate 5 (I-5) corridor | Robotic Total Measuring Stations for Traffic Incident Management (TIM) | $ 277,152 |
Oregon Department of Transportation (ODOT) | Oregon Department of Transportation’s National Environmental Policy Act and Environmental Permitting System | Integration of NEPA and Permitting Processes | $ 1,000,000 |
Pawnee Nation of Oklahoma | Pawnee Nation Suite of Projects CM/GC Implementation Project | Construction Manager/General Contractor | $ 500,000 |
Pennsylvania Department of Transportation | PennDOT 911 CAD/Traffic Management Center Integration | Next Generation TIM: Integrating Technology, Training, and Data | $ 759,600 |
Pennsylvania Department of Transportation | Adaptive Traffic Signal Control for McKnight Road Corridor Project | Adaptive Signal Control | $ 720,000 |
Pennsylvania Department of Transportation | Stone Matrix Asphalt with High Modified Asphalt Project | Targeted Overlay Pavement Solutions | $ 700,000 |
Pueblo of Acoma | Construction Manager/General Contractor (CM/GC) Project | Construction Manager/General Contractor | $ 563,000 |
Rhode Island Department of Transportation | Innovative Arch Construction Project | Innovative Arch Construction | $ 480,000 |
Rhode Island Department of Transportation | Design and Replacement of the Park Avenue Bridge in Cranston | Construction Manager/General Contractor (CMGC) and Early Contractor Involvement (ECI) | $ 1,000,000 |
Rhode Island Department of Transportation | RIDOT Uncontrolled Midblock Crosswalk Enhancements | STEP | $ 1,000,000 |
Rhode Island Department of Transportation Report available |
Highway Improvement on RI Route 102 within the Towns of Coventry and Foster | WMA Additive and IC | $ 1,000,000 |
Rhode Island Department of Transportation & Rhode Island Airport Corporation | Airport Road in the City of Warwick, RI | Adaptive Signal Control | $ 996,000 |
South Carolina Department of Transportation | Structural Health Monitoring (SHM) Technology Project | Structural Health Monitoring | $ 787,104 |
South Dakota Department of Transportation | Deployment and Evaluation of Variable Speed Limits on Interstate Highways in South Dakota | Variable Speed Limits | $ 1,000,000 |
South Dakota Department of Transportation Report available |
Safety Project Utilizing High Friction Surface Treatment at Spot Locations | High Friction Surface Treatments | $ 759,927 |
Tennessee Department of Transportation | Accelerated Steel Bridge Girder Fabrication | 3D modeling | $ 221,984 |
Texas Department of Transportation | TxDOT Traffic Speed Deflection Devices Project | Traffic Speed Deflection Device | $ 1,000,000 |
US Fish & Wildlife Service | Improving Road Safety for Bicyclists and Drivers | Dynamic Warning System | $ 253,889 |
USDA Forest Service Report available |
Layout Creek Bridge | Geosynthetic Reinforced Soil-Integrated Bridge System | $ 137,336 |
Utah Department of Transportation | Variable Speed Reduction in Active Work Zones | Work Zone Safety | $ 775,110 |
Utah Department of Transportation | e-Construction to improve business practices | e-Construction | $ 626,229 |
Utah Department of Transportation | Intelligent Design & Construction Program | 3D Modeling | $ 1,000,000 |
Utah Department of Transportation | Advancing Digital Construction with Data Capture | Advancing Digital Construction with Data Capture | $ 1,000,000 |
Vermont Agency of Transportation | Tri-State Advanced Transportation Management System and Traveler Information System | Advanced Transportation Management System and Traveler Information System | $ 1,000,000 |
Vermont Agency of Transportation | Right-of-way (ROW) acquisition process on roadway project in the towns of Pittsford and Brandon | Business Process Management (BPM) systems | $ 1,000,000 |
Vermont Agency of Transportation & Chittenden County Regional Planning Commission (CCRPC) | Chittenden County Regional Planning Commission Implementation of Automated Traffic Signal Performance Measures along an Urban Traffic Signal Corridor: Real Time Traffic Information through Bluetooth Deployment | Automated Traffic Signal Performance Measures | $ 996,000 |
Vermont Agency of Transportation (VTRANS) | Vermont Agency of Transportation’s Field Metalizing Windsor Steel Beam Bridge | Field Metalizing | $ 720,000 |
Virginia Department of Transportation & Town of Vienna | Park and Locust Streets SE Intersection Project | Mini-roundabout | $ 211,200 |
Washington Department of Transportation | Concrete replacement demonstration project using precast concrete panels on I-90/EB E. Sunset Way Interchange to Region Boundary (PIN 109060F) | Precast Concrete Panels | $ 1,000,000 |
Washington State Department of Transportation | Practical Solutions Project | Practical Solutions with Lean Techniques and Knowledge Management | $ 750,000 |
Washington State Department of Transportation | Light-Emitting Diode (LED) Adaptive Roadway Lighting on Interstate 5 | LED Adaptive Roadway Lighting System | $ 1,000,000 |
West Virginia Department of Transportation - Division of Highways | Purgitsville Bridge Deck Replacement Using Orthotropic Steel Deck Technology | Orthotropic Steel Deck | $ 985,320 |
Wisconsin Department of Transportation | Traffic queue warning systems (QWS) in work zones on two bridge construction projects | Smarter Work Zones | $ 512,449 |
Wisconsin Department of Transportation & Dodge County | Replacing two county bridges using Accelerated Bridge Construction (ABC) | Geosynthetic Reinforced Soil-Integrated Bridge System | $ 676,000 |
Wyoming Department of Transportation | Radar Avalanche Detection System | Radar Technology to detect avalanche events | $ 377,960 |
Wyoming Department of Transportation | Update of WYDOT’s Traffic Signal System, communications and detection upgrades to support implementation of Automated Traffic Signal Performance Measures | Automated Traffic Signal Performance Measures (ATSPMs) | $ 1,000,000 |