U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
![]() |
![]() ![]() |
Highway Statistics 2003 | OHPI > Highway Statistics > 2003 > Hwy Finance > Chart |
Equipment, Overhead & Profit 1/ | 36.8 |
Wages 6/ | 18.7 |
Other | 17.0 |
Steel 5/ | 3.9 |
Bitumens 4/ | 8.0 |
Portland Cement 3/ | 0.6 |
Aggregates 2/ | 15.0 |
100.0 |
Source:
Office of Program Administration
Office of Infrastructure, FHWA
(202) 366-4636
1/ Equipment includes fuel and lubricants 1.9%, but excludes operators' and mechanics' wages. Overhead includes contractors' on-site expenses such as mobilization, office, rental, licenses, insurance, etc.
2/ Aggregates consists of sand, gravel, slag, crushed stone, ect., for use in bases, portland cement, concrete and bituminous surfaces, and portland cement concrete structures.
3/ For both roadway and structures.
4/ For various types of bituminous surfaces and bases.
5/ Includes structural, reinforcing, culvert and miscellaneous steel.
6/ Gross earnings of contractors' employees in the following classifications: Administrative and Supervisory, Skilled, Intermediate, and Unskilled labor.
This table is also available for download in the following formats:
To view PDF files, you need the Acrobat® Reader®.