U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
TAKEDOWN FROM | FOR | FY 2005 | FY 2006 | FY 2007 | FY 2008 | FY 2009 |
---|---|---|---|---|---|---|
Interstate Maintenance Program | Metropolitan Planning | 1.25% | 1.25% | 1.25% | 1.25% | 1.25% |
National Highway System | Metropolitan Planning | 1.25% | 1.25% | 1.25% | 1.25% | 1.25% |
Highway Bridge Replacement and Rehabilitation Program | Metropolitan Planning | 1.25% | 1.25% | 1.25% | 1.25% | 1.25% |
Surface Transportation Program | Metropolitan Planning | 1.25% | 1.25% | 1.25% | 1.25% | 1.25% |
Congestion Mitigation and Air Quality Improvement Program | Metropolitan Planning | 1.25% | 1.25% | 1.25% | 1.25% | 1.25% |
TAKEDOWN FROM | FOR | FY 2005 | FY 2006 | FY 2007 | FY 2008 | FY 2009 |
---|---|---|---|---|---|---|
Interstate Maintenance Program | Interstate Maintenance Discretionary |
100.000
|
100.000
|
100.000
|
100.000
|
100.000
|
National Highway System | Territorial Highways |
40.000
|
40.000
|
50.000
|
50.000
|
50.000
|
National Highway System | Alaska Highway |
30.000
|
30.000
|
30.000
|
30.000
|
30.000
|
Highway Bridge Program | Bridge Discretionary |
100.000
|
—
|
—
|
—
|
—
|
Highway Bridge Program | Bridge Setaside |
—
|
100.000
|
100.000
|
100.000
|
100.000
|
Surface Transportation Program | Operation Lifesaver* |
0.560
|
—
|
—
|
—
|
—
|
Surface Transportation Program | Rail-Highway Crossing Hazard Elimination in High-Speed Rail Corridors* |
5.250
|
—
|
—
|
—
|
—
|
Surface Transportation Program | DBE Training |
10.000
|
10.000
|
10.000
|
10.000
|
10.000
|
Surface Transportation Program | On-the-Job Training Supportive Services |
10.000
|
10.000
|
10.000
|
10.000
|
10.000
|
Recreational Trails Program | Research, Technical Assistance and Training |
0.840
|
0.840
|
0.840
|
0.840
|
0.840
|
Safe Routes to School Program | Administrative Expenses, including Task Force and Clearinghouse |
3.000
|
3.000
|
3.000
|
3.000
|
3.000
|
Highway Safety Improvement Program | Elimination of Hazards and Installation of Protective Devices at Railway-Highway Crossings |
NA
|
220.000
|
220.000
|
220.000
|
220.000
|
*Operation Lifesaver and Rail-Highway Crossing Hazard Elimination in High-Speed Rail Corridors funded by separate authorizations rather than takedowns after FY 2005.