U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
Federal Highway Administration Research and Technology
Coordinating, Developing, and Delivering Highway Transportation Innovations
REPORT |
This report is an archived publication and may contain dated technical, contact, and link information |
|
Publication Number: FHWA-HRT-12-048 Date: November 2013 |
Publication Number: FHWA-HRT-12-048 Date: November 2013 |
This appendix contains tables showing the age of pavement markings as they reach various levels of retroreflectivity. The retroreflectivity degradation curves from appendix B were used to determine the age of the markings when they reached 250, 200, 150, and 100 mcd/m2/lux. These levels of retroreflectivity were selected because they incrementally represent a marking that is approaching a lower level of maintained retroreflectivity. As the marking reaches a minimum retroreflectivity level, the marking will need to be replaced. In addition to the age of the marking at these retroreflectivity levels, the tables include the cost of the marking per mile per year of service. The costs of each marking were described in the pavement marking costs section of this report. For more specific marking information, refer to appendix A.
Table 75. Cost effectiveness for section 1 TN-N.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach Retroreflectivity Level |
$/Mile/Year at Retroreflectivity Level |
---|---|---|
Edge Line Surface |
Edge Line Surface |
|
250 |
0.8 |
2,611 |
200 |
1.7 |
1,237 |
150 |
2.9 |
737 |
100 |
4.5 |
469 |
Table 76. Cost effectiveness for section 2 TN-N.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
2.4 |
3.3 |
2.5 |
2.9 |
437 |
1,513 |
428 |
1,704 |
200 |
3.6 |
4.8 |
3.8 |
4.9 |
297 |
1,036 |
280 |
1,033 |
150 |
5.0 |
6.8 |
5.4 |
7.3 |
211 |
736 |
194 |
685 |
100 |
7.1 |
9.6 |
7.8 |
10.8 |
149 |
523 |
135 |
465 |
Table 77. Cost effectiveness for section 3 TN-N.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
3.1 |
3.5 |
3.1 |
3.1 |
517 |
1,565 |
516 |
1,778 |
200 |
4.1 |
4.6 |
4.0 |
4.1 |
390 |
1,206 |
399 |
1,356 |
150 |
5.4 |
6.0 |
5.1 |
5.3 |
296 |
931 |
309 |
1,038 |
100 |
7.2 |
7.9 |
6.8 |
7.1 |
221 |
704 |
234 |
781 |
Table 78. Cost effectiveness for section 4 TN-N.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach Retroreflectivity Level |
$/Mile/Year at Retroreflectivity Level |
||||
---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Inlaid |
|
250 |
9.9 |
44.0 |
62.0 |
265 |
150 |
106 |
200 |
12.0 |
52.7 |
77.3 |
220 |
125 |
85 |
150 |
14.6 |
64.0 |
97.0 |
181 |
103 |
68 |
100 |
18.3 |
79.9 |
124.8 |
144 |
83 |
53 |
Table 79. Cost effectiveness for section 5 TN-N.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach Retroreflectivity Level |
$/Mile/Year at Retroreflectivity Level |
||
---|---|---|---|---|
Edge Line Surface |
Skip Line Surface |
Edge Line Surface |
Skip Line Surface |
|
250 |
2.9 |
2.8 |
1,268 |
1,300 |
200 |
3.7 |
3.7 |
997 |
998 |
150 |
4.7 |
4.8 |
781 |
768 |
100 |
6.2 |
6.4 |
599 |
579 |
Table 80. Cost effectiveness for section 6 TN-N.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
4.6 |
5.1 |
2.5 |
3.4 |
93 |
856 |
172 |
1,288 |
200 |
6.7 |
7.7 |
3.8 |
5.5 |
63 |
571 |
111 |
795 |
150 |
9.4 |
11.0 |
5.5 |
8.2 |
45 |
400 |
77 |
533 |
100 |
13.2 |
15.6 |
7.9 |
12.1 |
32 |
281 |
53 |
363 |
Table 81. Cost effectiveness for section 7 TN-N.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
3.3 |
4.4 |
2.9 |
3.3 |
1,286 |
1,876 |
1,462 |
2,467 |
200 |
3.8 |
5.0 |
3.4 |
3.8 |
1,100 |
1,645 |
1,243 |
2,134 |
150 |
4.6 |
5.8 |
4.1 |
4.5 |
927 |
1,420 |
1,042 |
1,817 |
100 |
5.6 |
6.9 |
5.0 |
5.4 |
759 |
1,191 |
848 |
1,503 |
Table 82. Cost effectiveness for section 8 TN-N.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
2.7 |
2.6 |
2.1 |
2.0 |
461 |
2,005 |
608 |
2,565 |
200 |
4.5 |
4.0 |
3.4 |
3.0 |
279 |
1,308 |
371 |
1,719 |
150 |
6.9 |
5.8 |
5.1 |
4.3 |
185 |
903 |
247 |
1,207 |
100 |
10.1 |
8.3 |
7.5 |
6.2 |
125 |
629 |
168 |
849 |
Table 83. Cost effectiveness for section 9 TN-N.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
3.6 |
3.4 |
1.6 |
3.3 |
217 |
1,413 |
484 |
1,457 |
200 |
4.9 |
4.4 |
2.6 |
4.4 |
161 |
1,084 |
302 |
1,092 |
150 |
6.6 |
5.7 |
3.9 |
5.8 |
121 |
834 |
203 |
825 |
100 |
8.9 |
7.5 |
5.7 |
7.7 |
89 |
630 |
139 |
614 |
Table 84. Cost effectiveness for section 1 TN-T.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
2.0 |
1.6 |
1.4 |
1.6 |
935 |
3,639 |
1,361 |
3,666 |
200 |
2.4 |
1.9 |
1.7 |
2.0 |
766 |
2,986 |
1,076 |
2,874 |
150 |
3.0 |
2.4 |
2.2 |
2.6 |
621 |
2,424 |
847 |
2,248 |
100 |
3.8 |
3.0 |
2.8 |
3.4 |
490 |
1,917 |
652 |
1,720 |
Table 85. Cost effectiveness for section 2 TN-T a.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
6.8 |
7.8 |
4.5 |
2.6 |
1,243 |
1,584 |
1,885 |
4,757 |
200 |
8.8 |
9.9 |
6.0 |
3.3 |
956 |
1,257 |
1,406 |
3,774 |
150 |
11.5 |
12.5 |
8.0 |
4.2 |
737 |
993 |
1,059 |
2,980 |
100 |
15.2 |
16.2 |
10.8 |
5.4 |
557 |
766 |
785 |
2,299 |
Table 86. Cost effectiveness for section 2 TN-T b.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
1.0 |
2.0 |
1.5 |
1.9 |
10,243 |
7,248 |
7,005 |
7,690 |
200 |
1.6 |
2.6 |
2.3 |
2.7 |
6,430 |
5,640 |
4,525 |
5,403 |
150 |
2.4 |
3.3 |
3.4 |
3.7 |
4,345 |
4,385 |
3,107 |
3,906 |
100 |
3.5 |
4.3 |
4.9 |
5.2 |
2,982 |
3,338 |
2,155 |
2,809 |
Table 87. Cost effectiveness for section 3 TN-T.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
1.0 |
3.4 |
1.2 |
2.1 |
412 |
1,271 |
349 |
2,080 |
200 |
1.6 |
4.8 |
1.9 |
3.1 |
271 |
918 |
226 |
1,402 |
150 |
2.2 |
6.5 |
2.7 |
4.4 |
188 |
675 |
156 |
987 |
100 |
3.2 |
8.9 |
3.9 |
6.3 |
132 |
492 |
108 |
697 |
Table 88. Cost effectiveness for section 4 TN-T.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
3.3 |
3.3 |
1.6 |
2.1 |
238 |
1,428 |
482 |
2,233 |
200 |
4.5 |
4.5 |
2.2 |
2.9 |
175 |
1,050 |
358 |
1,659 |
150 |
6.1 |
6.1 |
3.0 |
3.8 |
131 |
783 |
268 |
1,246 |
100 |
8.2 |
8.3 |
4.0 |
5.2 |
96 |
576 |
198 |
922 |
Table 89. Cost effectiveness for section 5 TN-T a.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
2.4 |
3.0 |
2.0 |
2.1 |
3,356 |
3,913 |
3,911 |
5,779 |
200 |
2.7 |
3.5 |
2.4 |
2.4 |
2,908 |
3,442 |
3,332 |
4,935 |
150 |
3.2 |
4.0 |
2.8 |
2.9 |
2,480 |
2,979 |
2,799 |
4,154 |
100 |
3.9 |
4.7 |
3.5 |
3.5 |
2,055 |
2,504 |
2,284 |
3,396 |
Table 90. Cost effectiveness for section 5 TN-T b.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
2.2 |
2.2 |
1.8 |
1.4 |
4,489 |
6,400 |
5,476 |
10,044 |
200 |
2.5 |
2.5 |
2.2 |
1.7 |
3,965 |
5,560 |
4,616 |
8,110 |
150 |
2.9 |
2.9 |
2.6 |
2.2 |
3,446 |
4,755 |
3,838 |
6,497 |
100 |
3.4 |
3.5 |
3.2 |
2.8 |
2,910 |
3,949 |
3,102 |
5,074 |
Table 91. Cost effectiveness for section 6 TN-T.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
4.1 |
4.7 |
3.4 |
3.8 |
624 |
1,380 |
752 |
1,720 |
200 |
5.3 |
6.2 |
4.4 |
5.0 |
479 |
1,042 |
577 |
1,299 |
150 |
6.9 |
8.2 |
5.7 |
6.6 |
369 |
792 |
444 |
988 |
100 |
9.1 |
11.0 |
7.6 |
8.8 |
279 |
591 |
335 |
738 |
Table 92. Cost effectiveness for section 7 TN-T.
Retroreflectivity Level (mcd/m2/lux) |
Years to Reach |
$/Mile/Year at |
||||||
---|---|---|---|---|---|---|---|---|
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
Edge Line Surface |
Edge Line Inlaid |
Skip Line Surface |
Skip Line Inlaid |
|
250 |
3.3 |
3.4 |
2.9 |
3.2 |
453 |
1,594 |
508 |
1,723 |
200 |
4.1 |
4.2 |
3.9 |
4.1 |
357 |
1,280 |
375 |
1,336 |
150 |
5.3 |
5.3 |
5.3 |
5.4 |
281 |
1,020 |
280 |
1,010 |
100 |
6.9 |
6.9 |
7.2 |
7.2 |
216 |
794 |
206 |
752 |