Slide-in Bridge Construction
Construction
Constructing a project with the lateral slide method may require different approaches during the construction phase. For example, additional shop drawings are needed and a detailed schedule is needed to plan the work to be performed during the period when the road is closed. Several of the resources listed below are not strictly limited to lateral slides, but are included here because they offer insight in kinds of construction issues than must be considered for any given accelerated bridge construction method.
Standards
Shop Drawings
- Ben Sawyer Bridge Rehabilitation: Out with the Old in with the New
Submittal Process
- Accelerated Bridge Construction SPMT Process Manual and Design Guide
- Slide-In Bridge Construction Implementation Guide (.pdf)
Testing
- How Did They Move The Sellwood Bridge: Project Manager Explains
- Omega Morgan moves the Sellwood Bridge in Portland, OR on Jan 19, 2013
- Sellwood Bridge Slideshow #9
- Skagit River Bridge Switchover
Sequencing
- ABC Project Highlights
- An inside look at designing for Accelerated Bridge Construction
- Bridge Construction: Must-'slide rule'
- Bridge Slide: An inside look at designing for Accelerated Bridge Construction
- Elkton and Oregon DOT partner on bridge replacement
- Elkton Bridge Rapid Replacement
- Epic Scan - Sellwood Bridge - Bridge Animation
- How Did They Move The Sellwood Bridge: Project Manager Explains
- I-44 Bridge Jacking
- I-44 Gasconade River Bridge
- I-5 Skagit River Bridge - Permanent Bridge Replacement
- I-84 Accelerated Bridge Construction Time-Lapse
- I-84 Echo Bridge Time Lapse
- I-84 over Dingle Ridge Road (NY) - Bridge Slide In 3 minute Time Lapse
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Massena Bridge Project - Full construction
- Mesquite 2nd Bridge Slide - 56 Hour time-lapse
- Mesquite Bridge Demolition and Slide Time-Lapse
- Mesquite Bridge Demolition and Slide Time-lapse Zoomed in
- Mesquite Bridge Move Video Production
- Mesquite Bridge Slide - 1/24/12 - Close-up
- Mesquite Bridge Slide Video
- Move that Bridge (.pdf)
- OR 38 Elk Creek Rapid Bridge Replacement
- Oregon 38 Elk Creek Rapid Bridge Replacement
- Oregon 38 Rapid Bridge Replacement (Docu Music-Video Version)
- Quick replacement: Nevada successfully moves bridge on I-15 (.pdf)
- Sellwood Bridge Move Time Lapse
- Sellwood Bridge Slideshow #9
- Skagit River Bridge Switchover
- Skagit River Bridge Switchover
- Slide in Bridge Construction from the Engineer/Designer Perspective - Massena Lateral Bridge Slide (.pdf)
- Slide in Bridge Construction from the Engineer/Designer Perspective - Milton Madison Bridge Design-Build (.pdf)
- Slide in Bridge Construction from the Engineer/Designer Perspective - State Highway 266 Bridge Slides Rocky Ford, Colorado (.pdf)
- Slide-In Bridge Construction Implementation Guide (.pdf)
- US 34 Bridge Replacement of Republican Creek in Wray
- Westbound I-44 Gasconade River Bridge