Slide-in Bridge Construction
Resources
The resources listed here offer insight into successfully completing lateral slides in particular as well as accelerated bridge construction projects in general.
Definitions
- Accelerated Bridge Construction - WisDOT Bridge Manual
- Accelerated Bridge Construction SPMT Process Manual and Design Guide
- Mesquite Bridge Slide Video
- Quick replacement: Nevada successfully moves bridge on I-15
Implemenation Guidance
- Accelerated Bridge Construction - Applications in California: Lessons Learned Report
- Accelerated Bridge Construction - WisDOT Bridge Manual
- FHWA Every Day Counts Innovation Initiative PowerPoint Presentation
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Slide in Bridge Construction (SIBC) From the Owner/Poly Maker Perspective
- Slide-In Bridge Construction (SIBC) Cost Estimation Guidelines
- Slide-In Bridge Construction (SIBC) Cost EstimationTool
- Slide-In Bridge Construction Implementation Guide
- Utah DOT Accelerated Bridge Construction Decision Making Process
Case Studies
- 38-Second time-lapse of the Sellwood Bridge move
- ABC Project Highlights
- ABC Project Highlights - Eastbound Structure #2C-326 at Atkinson Canyon
- ABC Project Highlights - I-80 2300 East Bridge
- ABC Project Highlights - I-80 EB/WB over Weber River at Echo Junction
- ABC Project Highlights - I-80 Summit Park Bridge
- ABC Project Highlights - I-80 Two Bridges Near Echo Junction
- ABC Project Highlights - SR-66 over Weber River in Morgan City
- Accelerated Bridge Construction
- Accelerated Bridge Construction: An Overview of Methods and Projects
- Amazing Engineers Move Capilano Bridge in 6 Hours - Part 1
- Amazing Engineers Move Capilano Bridge in 6 Hours - Part 2
- Ben Sawyer Bridge Rehabilitation: Out with the Old in with the New
- Bridge Construction: Must-'slide rule'
- Bridge Construction: New I-5 Skagit River Bridge span to slide into place Saturday
- Bridge Slide: An inside look at designing for Accelerated Bridge Construction
- Buckland & Taylor slides their first bridge
- County J at Wisconsin 29 Bridge Roll-in
- Demolition set for Kent County overpass: Watch how MDOT slides new bridge into place
- DOT Completes Pecos Bridge Replacement in One Weekend
- Elkton and Oregon DOT partner on bridge replacement
- Elkton Bridge Rapid Replacement
- Epic Scan - Sellwood Bridge - Bridge Animation
- FHWA Every Day Counts Innovation Initiative PowerPoint Presentation
- How Did They Move The Sellwood Bridge: Project Manager Explains
- I-44 Bridge Jacking
- I-44 Gasconade River Bridge Rehabilitation
- I-5 Skagit River Bridge - Permanent Bridge Replacement
- I-80 and Wanship Utah Bridge Replacement
- I-84 Accelerated Bridge Construction Time-Lapse
- I-84 Echo Bridge Time Lapse
- I-84 over Dingle Ridge Road (NY) - Bridge Slide In 3 minute Time Lapse
- In with the new: Permanent I-5 Skagit River Bridge replacement opens to traffic
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Lateral Slide of Historic Bridge in Washington State
- Massena Bridge Project - Bridge Demo
- Massena Bridge Project - Full construction
- Massena Bridge Project - Lowering bridge to final position
- Massena Bridge Project - Precast wing installation
- Massena Bridge Project - Slow roller
- MDOT discusses bridge slide method at last Lowell Township public meeting
- Mesquite 2nd Bridge Slide - 56 Hour time-lapse
- Mesquite Bridge Demolition
- Mesquite Bridge Demolition and Slide Time-Lapse
- Mesquite Bridge Demolition and Slide Time-lapse Zoomed in
- Mesquite Bridge Move Video Production
- Mesquite Bridge Slide
- Mesquite Bridge Slide - 1/24/12 - Close-up
- Mesquite Bridge Slide Video
- Michigan's first bridge slide in Mecosta Co.
- Milton-Madison Bridge Reopening
- Milton-Madison Bridge Slide
- Milton-Madison Bridge Span Demolition - Blast #4 Sept. 19, 2013
- Move that Bridge
- ODOT's Experience with Accelerated Bridge Construction
- Old Structures Fill the Gap While New Bridges Built
- Omega Morgan moves the Sellwood Bridge in Portland, OR on Jan 19, 2013
- OR 38 Elk Creek Rapid Bridge Replacement
- Oregon 213 Bridge Slide
- Oregon 38 Elk Creek Rapid Bridge Replacement
- Oregon 38 Rapid Bridge Replacement (Docu Music-Video Version)
- Pecos Street over I-70 Bridge Replacement Project: Pre-Bridge Move Technical Workshop
- Quick replacement: Nevada successfully moves bridge on I-15
- Replacement of Cottonwood Creek Bridge - ABC Methodology
- Sellwood Bridge Compilation 5
- Sellwood Bridge Move
- Sellwood Bridge Move Time Lapse
- Sellwood Bridge Project - Multnomah County Oregon Website
- Sellwood Bridge Slideshow #9
- Skagit River Bridge Switchover
- Skagit River Bridge Switchover
- Slick lubricant helps complete Michigan's first bridge slide project on U.S. 131
- Slide in Bridge Construction from the Engineer/Designer Perspective - Milton Madison Bridge Design-Build
- Slide-in Bridge Construction - Case Study
- Slip Slidin' Away: Big, heavy, Oregon bridge makes an innovative move
- The Big Move
- This Ingenious Way to Build Bridges Will Fix Our Crumbling Infrastructure
- Twelve Hours: The Sellwood Bridge move comes off without a hitch
- US 34 Bridge Replacement of Republican Creek in Wray
- US-131 bridge slide takes 23 hours
- Utah Lateral Bridge Slide Experience
Training Materials
- 38-Second time-lapse of the Sellwood Bridge move
- Accelerated Bridge Construction
- Accelerated Bridge Construction Decision Making and Economic Tool
- Accelerated Bridge Construction SPMT Process Manual and Design Guide
- Accelerated Bridge Construction: An Overview of Methods and Projects
- Amazing Engineers Move Capilano Bridge in 6 Hours - Part 1
- Amazing Engineers Move Capilano Bridge in 6 Hours - Part 2
- Bridge Construction: Must-'slide rule'
- Construction Issues: Discussion of Construction Issues and Techniques
- Elkton and Oregon DOT partner on bridge replacement
- Elkton Bridge Rapid Replacement
- Epic Scan - Sellwood Bridge - Bridge Animation
- FHWA Every Day Counts Innovation Initiative PowerPoint Presentation
- How Did They Move The Sellwood Bridge: Project Manager Explains
- I-84 Accelerated Bridge Construction Time-Lapse
- I-84 Echo Bridge Time Lapse
- I-84 over Dingle Ridge Road (NY) - Bridge Slide In 3 minute Time Lapse
- Massena Bridge Project - Full construction
- Massena Bridge Project - Lowering bridge to final position
- Massena Bridge Project - Precast wing installation
- Massena Bridge Project - Slow roller
- Mesquite 2nd Bridge Slide - 56 Hour time-lapse
- Mesquite Bridge Demolition
- Mesquite Bridge Demolition and Slide Time-Lapse
- Mesquite Bridge Demolition and Slide Time-lapse Zoomed in
- Mesquite Bridge Move Video Production
- Mesquite Bridge Slide
- Mesquite Bridge Slide - 1/24/12 - Close-up
- Mesquite Bridge Slide Video
- Omega Morgan moves the Sellwood Bridge in Portland, OR on Jan 19, 2013
- OR 38 Elk Creek Rapid Bridge Replacement
- Oregon 38 Elk Creek Rapid Bridge Replacement
- Pecos Street over I-70 Bridge Replacement Project: Pre-Bridge Move Technical Workshop
- Sellwood Bridge Compilation 5
- Sellwood Bridge Move
- Sellwood Bridge Move Time Lapse
- Skagit River Bridge Switchover
- Slide in Bridge Construction (SIBC) From the Owner/Poly Maker Perspective
- Twelve Hours: The Sellwood Bridge move comes off without a hitch