Slide-in Bridge Construction
Design
When planning an project to be constructed with SIBC, the designer must consider how the construction method impacts the design of the permanent structure, and what temporary works may be required to facilitate construction. Several of the resources listed below are not strictly limited to lateral slides, but are included here because they offer insight in kinds of design issues than must be considered for any given accelerated bridge construction method.
Temporary Works
- ABC Project Highlights
- Accelerated Bridge Construction SPMT Process Manual and Design Guide
- Ben Sawyer Bridge Rehabilitation: Out with the Old in with the New
- Bridge Construction: Must-'slide rule'
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Move that Bridge (.pdf)
- Slide in Bridge Construction from the Engineer/Designer Perspective - Milton Madison Bridge Design-Build (.pdf)
- Slide-In Bridge Construction Implementation Guide (.pdf)
Permanent Works
- Accelerated Bridge Construction SPMT Process Manual and Design Guide
- Ben Sawyer Bridge Rehabilitation: Out with the Old in with the New
- Bridge Slide: An inside look at designing for Accelerated Bridge Construction
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Iowa Department of Transportation Massena Lateral Bridge Slide
- Move that Bridge (.pdf)
- Slide in Bridge Construction from the Engineer/Designer Perspective - Massena Lateral Bridge Slide (.pdf)
- Slide in Bridge Construction from the Engineer/Designer Perspective - State Highway 266 Bridge Slides Rocky Ford, Colorado (.pdf)
- Slide-In Bridge Construction Implementation Guide (.pdf)