Generic Construction Related Review Guidelines
This web page has been developed to provide the FHWA division offices and State Departments of Transportation with examples of process and in-depth reviews that have been undertaken by various field offices. The specific name of the state and agency conducting the review has been removed, as the intent is only to furnish review guidelines that have been used in the past. These generic "samples" should be modified as appropriate to meet your specific program needs.
Training Course: Conducting Reviews that Get Results. This course helps Division Offices and their State DOT partners better plan and conduct process reviews, and better implement the results of the reviews
- Asphalt Pavement Density
- Asphalt Pavements - Statewide
- Asphalt Pavements #1
- Asphalt Pavements #2
- Bidding Process #1
- Bidding Process #2
- Bituminous Surfacing
- Bolting - Structural Steel
- Bolts - High Strength
- Bridge - Latex Modified Concrete Overlay
- Bridge Coating Program
- Bridge Construction
- Bridge Construction Post-Placement Inspection Checklist
- Bridge Deck - Pre-stressed Concrete Bridge Members Inspector's Checklist
- Bridge Deck Construction #1
- Bridge Deck Construction #2
- Bridge Deck Construction #3
- Bridge Deck Construction #4
- Bridge Deck Patching
- Bridge Deck Rebar Checklist
- Bridge Deck Steel Structures Inspector's Checklist
- Bridge Maintenance - Scour
- Concrete Inspector's Check List Site of Delivery
- Concrete Plant and Placement
- Concrete Plant Inspector's Checklist
- Consultant Agreements #1
- Consultant Agreements #2
- Consultant Selection
- Contract Administration by Local Public Agencies
- Contract Change Orders #1
- Contract Change Orders #2
- Contract Change Orders #3
- DBE Process in Local Agency Projects
- Determination and Administration of Contract Time
- Drainage Guidelines
- Earthwork and Drainage
- Environmental Commitments in Construction
- Environmental Commitments Local Agency
- Environmental Commitments Process Review
- Environmental Committment Review Planning Worksheet
- Epoxy Coated Reinforcing Review Guidelines
- Erosion and Sediment Control Follow-up
- Erosion Control Measures #2
- Erosion Control Measures #3 (Temporary Erosion Control)
- Estimating Structure Cost Review Planning Worksheet
- Foundation Construction
- Hard Deck Overlays
- HBRRP by LPA Review Planning Worksheet
- Hot Mix Asphalt Pavement Guidelines
- Hydraulic Design Review Planning Worksheet
- Integral Abutments
- ITS Device Maintenance Review Planning Worksheet
- Jointless Bridges and Bridge Expansion Joints
- Joints
- Latex Mondified Concrete Mix Design
- Latex Mondified Concrete Placement Inspection
- Lean Concrete Base Course
- Local Agency Bridge Inspection Program
- Major Structures - Steel Erection
- Measurement and Payment Procedures
- NBIS
- Pavement Maintenance
- Pavement Management System
- Pavement Smoothness
- Pavement Type Selection
- Permitting and Routing of Oversize Overweight Loads
- Pile Driving Guidelines
- Portland Cement Concrete Pavement
- Portland Cement Concrete Pavement - Urban
- Portland Cement Concrete Paving
- Portland Cement Concrete Paving and Plant
- Preadvertisement Project Selection Review Planning Worksheet
- Prestress Concrete Plant
- Process Review
- Project Selection
- Project Staffing #1
- Project Staffing #2
- QCQA Procedures - STA
- Recycled Concrete Aggregate
- Right of Way Appraisal
- Right-of-Way and Utility Delays
- Staffing Review Guidelines
- Staffing Review Guidelines - Laboratory and Project Visit Review Guidelines
- Staffing Review Guidelines - Project Office, Central Laboratory, District Offices
- Structural Concrete
- Structural Steel Fabrication #1
- Superpave Implementation
- Traffic Control Guidelines (Emphasis Points)
- Traffic Data Acquisition Review Planning Worksheet
- Unbalanced Bidding
- Underdrain Design and Maintenance
- Utility Accommodation Procedures
- Work Zones Traffic Control #1
- Work Zones Traffic Control #3
- Work Zones Traffic Control #4
- Work Zones Traffic Control #5